Forwards Mgt Plan for Extended Conts Delay. Intent of Region 5 Insp Program Durng Mothball Period Will Be to Assure That Licensee Follows Established QA Program
ML20040A341
Person / Time
Site: Satsop, Washington Public Power Supply System
Issue date: 12/23/1981
From: Dodds R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Adensam E, Miraglia E
Office of Nuclear Reactor Regulation
Shared Package
ML20040A342 List:
References
NUDOCS 8201200790
Download: ML20040A341 (2)


Text

ma aso

  1. [.

ug'o UNITED STATES NUCLEAR REGULATORY COMMISSION e

o d,

REGION V o,

1450 MARIA LANE. SUITE 260 WALNUT CREEK. CALIFORMA 94596 o

y um isog CV A)S16 MEMORANDUM TO:

E. J. Miraglia, Chief, Licensing Branch No. 3, NRR p "f($

E. G. Adensam, Chief, Licensing Branch No. 4, NRR FROM:

R. T. Dodds, Chief, Reactor Project Section 2, Reactor Construction Branch

SUBJECT:

EXTENDED CONSTRUCTION DELAY AT WNP-4 AND WNP-5 DOCKET NOS. 50-513 AND 50-509 A meeting was held in Region V with representatives of the Washington Public Power Supply System on December 10, 1981 to review the licensee's plans for the extended construction delay ("mothballing") of the subject facilities.

IE Report Nos. 50-513/81-11 and 50-509/81-21 contain a summary of the results of that meeting.

Enclosed is a copy of the licensee's management plan for mothballing the subject facilities.

The intent of the RV inspection program for WNP-4/5 during the mothball period will be to assure that the licensee has established and implemented plans, instructions and procedures for the preservation and maintenance of equipment, materials, structures and records in a timely manner in conformance with the established QA program.

Our inspections will initially include the following:

Review Management Plan Review and evaluate list of equipment, materials, and structures, including preservation requirements. Also consider " minimum attention with risk" category items Evaluate program for segregation of " wasted" material when appropriate Initially examine records retention program and conduct inspections thereafter of records of different organization / contractor's approximately quarterly Monthly tour of plants Quarterly inspection of stored materials Quaterly review of maintenance and/or surveillance records Semiannually review results of licensee's QA audits G

G A

RECEtygo 2

DECgg;gg g }

8201200790 911223 PDR ADOCK 05000509 A

pop y

9

_.)

O DEC 2 31981 Once we have gained some confidence in the licensee's program, then we will reevaluate our planned inspection program.

Irregardless, the Senior Resident Inspector will probably tour some area (plant or storage facilities) monthly.

t If you have any questions on our activities for these projects, you may contact me at 463-3720.

r h;'

c R. T. Dodds, Chief Reactor Project Section 2 cc w/ enclosure:

R. W. Hernan, NRR L. L. Wheeler, NRR cc w/o enclosure:

B. H. Faulkenberry

.