TOLEDO
- EDISON ACHAAD P. Cnoust Docket No. 50-346 vo %t Nucer License No. NPF-3 A82-20B Serial No. 1-236 PRINCIPAL STAFF January 8,1982 v f!P (IB ]_ ' T S 3/D TA0 A/D SLO Mr. James G. Keppler, Director an&PT United States Nuclear Regulatory Commission Region III DE&TI 799 Roosevelt Road j
g, q l p p pfs Filo Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
On December 30, 1981 (Serial No. 1-235), Toledo Edison identified
{
deficiencies in the Prompt Notification System (PNS) surrounding the Davis-Besse Nuclear Power Station, Unit No. 1.
Plans to upgrade the PNS were provided and indicated as underway.
The attachment to this letter provides a update of Toledo Edison upgrade efforts. The attachment identifies the status of each siren. The siren numbers are consistent with those identified on the emergency planning zone map enclosed with the December 30, 1981 submittal. The next update is currently scheduled for January 15, 1982.
Very truly yours,
/ff f
v w
.f,
\\/1 l.", '[j RPC:DMG: lab 7
' ' , h d/4 rj y
,s s
q attachment
,f cc: DB-1 NRC Resident Inspector Regional Director, FEMA, Fegion V NRC/NRR Project Manager J. C. Clem, Adjutant General, State of Ohio Ottawa County Commissioners
'JAN 1 3 882' THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 8201200629 820108 PDR ADOCK 05000346
((s F
Docket No. 50-346 i
License No. NPF-3 Serial No. 1-236 January 8, 1982 STATUS OF UPGRADED TROMPT NOTIFICATION SYSTEM (PNS)
SURRO'JFDING Tale DAVIS-BESSE NUCLEAR POWER STATION Activity Since Peport of December 30, 1981 Since December 30, 1981, Procurement has proceeded for all additional equipment required to upgrade the PNS. Toledc Edison has taken delivery of all poles and siren parts, with the exception of radio decoders and some electrical peripherals required for the siren additions.
Discussions are proceeding with the nine local governmental organizations to receive right-of-way approval for siren pole locations.
Siren assembly and site installation on approved right-of-way locations is expected to commence upon final parts delivery. Table 1 attached provides the status as of January 8,1982 and will be revised in future reports to identify further progress.
TABLE 1: SIREN STATUS Siren Siren Assembly Location Approval of Location and Installation Number Right-of-Way at Location Comments I
X X
Initial system 2
X X
Initial system 3
X X
Initial system 4
X X
Initial system 5
Y (note 1) 6 (note 2) 7 X (note 1) 8 X (note 1) 9 X (note 1) 10 X (note 1) 11 Ohio Edison Territory 12 X (note 1) 13 X (note 1) 14 (note 2)
Ohio Edison Territory 15 (note 2)
Ohio Edison Territory 16 (note 2)
Ohio Edison Territory 17 (note 2) 18 (note 2) 19 20 (note 2) 21 22 (note 2)
TABLE 1: SIREN STATUS (Continued)
Siren Siren Assembly Location Approval of Location and Installation Number Right-of-Way at Location Comments 23 (note 2) 24 (note 2) 25 (note 2) 26 X
27 X
28 29 30 31 32 Location deleted due to wildlife Refuge and limited population j
within coverage area.
Consistent with NUREG-0654 criteria of Section B, Appendix 3.
33 X (note 1) 34 X (note 1) l l
35 l
36 37 38 39 40 41 - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
i h
TABLE 1: SIREN STATUS (Continued)
Siren Siren Assembly Location Approval of Location and Installation Number Right-of-Way at Location Comments 42 f
43 X (note 1)
NOTE 1: Verbal approval from local government organization.
Official legislation pending.
NOTE 2: Verbal approval pending. Legislation to follow.