ML20040A250

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Potential Failure of GE-type Hfa Relays Due to Cracks in Lexan Bobbins,Initially Reported 811207.Coil Bobbins to Be Replaced by Tefsel Coils or Relays Will Be Replaced.Next Rept by 820308
ML20040A250
Person / Time
Site: Zimmer
Issue date: 01/08/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-1588, NUDOCS 8201200619
Download: ML20040A250 (2)


Text

m, gy\-

le- f

%Jn/ c L. .- 1L t MG-- ~~

THE CINCINNATI GAS & ELECTRIC COMPANY erJ ~

CINCINN ATI. OHIO 4 5200 January 8, 1982 c.A. sono ANN QA-1588 St heOR WsCE Psef 0 DENT N

'N C '\

Nuclear Regulatory Commission \

Region III ~

799 Roosevelt Road '7 Glen Ellyn, Illinois 60137 '/

\. i Attention: Mr. J. G. Keppler Director (N , ,

j N . . '

RE: WM. II. ZIMMER NUCLEAR POWER STATION - UNIT I 10CFR50.55(e) - ITEM E-16, POTENTIAL FAILURE OF GE TYPE liFA RELAYS, DOCKET NO. 50-358, CONSTRUCTION PERMIT CPPR-88, W.O. #57300 JOB E-5590 FILE NO. NRC-7

. Gentlemen:

i i This letter is an interim report on a potential 10CFR50.55(e) item which was reported to Mr. W. F. Christianson, NRC Resident Inspector,

' on December 7, 1981.

CCSE was notified by General Electric letter CG&E-1545 of the potential for type liFA Relays to develop cracks within the Lexan bobbins used as

{ part of its magnetic assembly. In addition, I.E. Information Notice 81-01 ,

states the Lexan bobbin is subject to cracking with an occasional broken j

bobbin found upon inspection.

At present, GE Services Information Letter SIL No. 44, Supplement 2, calls for inspection of the Lexan bobbins at twelve (12) month intervals 1 with replacement of any found cracked or broken.

I The GE Type HFA Relays 120 vac 6011z or 125 vde, are used throughout the Zimmer Plant as control devices. Failure of these relays in safety related systems could result in the loss of contrcl function. This deficiency if not corrected could adversely af fect the safety of plant operations. Therefore, we conclude that this item is a reportable deficiency under 10CFR50.55(e).

! It is CG&E's intention to identify all safety related HFA Relays with Lexan coil bobbins. The coil bobbin on the identified relays will be replaced with a qualified replacement coil made of Tefsel or the relay will be replaced.

8201200619 820108 l PDR s ADOCK 05000358 pon jag 1 5 1982

.%EIW//c. - _ -

\ -

Mr. J. G. Keppler Director Region III January 8, 1982 QA-1588 Page 2 Our next report will be submitted March 8, 1982 and will address our method and schedule of replacement.

We trust this will fullfil the requirements of an interim report under 10CFR50.55(e).

Very truly yours.

Tile CINCINNATI CAS & ELECTRIC COMPANY By E. A. BORGMANN SENIOR, VICE-PRESIDENT rip:ac cc: NRC Resident Site Inspector Attn: W. F. Christianson NRC Office of Inspection & Enforcement Washington, D.C. 20555 l