ML20040A215
| ML20040A215 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 01/15/1982 |
| From: | Mineck D IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20040A216 | List: |
| References | |
| DAEC-82-29, NUDOCS 8201200551 | |
| Download: ML20040A215 (1) | |
Text
,_
hma Electric Lighi and Power Company January 15, 1982 DAEC-82-29 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission D,x g
Washington, D. C.
20555
/g/'
N',\\M Attn: Document Control Desk
/'
C
\\
Subject:
Monthly Operating Report
/
File: A-118d, TE-5
\\
Dear Sirs:
Operating Report for December,1981.Please find enclosed 12 copies with the requirements of Regulatory Guide 1.16 and distribution has in accordance with Regulatory Guide 10.1 and Technical Specification e
..c.
Very truly yours, Hth Daniel L. Mineck Chief Engineer Duane Arnold Energy Center DLM/JVS/pl Enclosures cc:
D. Arnold S. Tuthill Director, Office of Inspection and B. Peterson Enforcement J. Rehnstrom U.S. Nuclear Regulatory Comission L. Root Region III R. McGaugby 799 Roosevelt Road I
P. Wa rd Glen Ellyn, IL 60137 (1)
H. Rehrauer E. Matthews Director, Office of Management and Program Analysis W. Bryant B. Salmon U. S. Nuclear Regulatory Comission D. Mineck Washington, D. C.
20555 (1)
B. York D. Wilson R. Hannen D. Teply p
Dennis Murdock 5
George Toyne MIggi 8201J5 NRC Site Inspector R
osoooJ31
/ I K. Eccleston PDR
[
- 1882 - A CENTURY OF SERVICE - 1982 '
Hu,une Anwid Deergy Center
- IX). IW 351
- Ct%Lur Itapids. Irma 52406
- 319/351 56t2
.