Requests Authorization to Delay 1981 Revision of Facility Emergency Plan Until Radiological Contingency Plan Submitted on 810827 Is Reviewed & Approved & Consolidation Plan & Schedule Can Be Established
ML20039H163
Person / Time
Site: 07001113
Issue date: 11/25/1981
From: Vaughan C
GENERAL ELECTRIC CO.
To: Cunningham R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
20038, NUDOCS 8201190673
Download: ML20039H163 (5)


Text

,

fe if0-l/13

' G E N E R A L h E L E CT R I.Cm ^ -

NUCLEAR ENERGY

/

PRODUCTS DIVISION hg h '

A DMETED D

WILMINGTON MANUFA USNRC CASTLE HAYNE ROAD P. O. BOX 780. WILMINGTON

. 28 9

2h'

^

November,25, 1981 NMSS

?,

wit stCHON b

Jg DOCKET CLERK Director s

c.

Office of Nuclear Materials Safety I

uards

.R M;

Washington, D.

C.

20555 n

m

'. ' y E

R~

Attention:

Mr.

R.

E. Cunningham, Director

.7

"~

Division of Fuel Cycle & Material Safet:y E

o

Dear Sir:

d.

6-

References:

(1) NRC License SNM-1097, Docket #7021113N (2) Amended License Condition 13, SNM-1097, 4/23/79 (3) NRC Order to Modify License, 2/11/81 (4) Radiological Contingency Plan Submitted 8/27/81

Subject:

APPLICATION AMENDMENT N-15 Authorization to Delay 1981 Revisions to the WMD Emergency Plan With reference to activities required by SNM-1097 at the General Electric Company fuel fabrication plant in Wilmington, N.

C.,

GE hereby requests permission to delay the 1981 revision of the WMD Emergency Plan until such time as the Radiological Contingency Plan submitted 8/27/81 is reviewed and approved, and a mutually agreeable consolidation plan and schedule can be established for the WMD Emergency Plan and the Radiological Contingency Plan.

The GE fuel fabrication plant currently operates to the WMD Emergency Plan required by SNM-1097 License Condition 13.

plan is implemented by an extensive series of internal procTh'he#

c s

9, covering all types of site emergencies including the defin dY response team and required actions.

gEC g~

S/l/ED In scope, the GE Emergency Plan is consistent with the 2

DEC 28 /gg73 :

ag requirements in the 2/11/81 RadiologicalContingencyPlan(kded% ey to Modify License SNM-1097.

However, in format, nomenclat te andi:74c,D u

level of detail, there are some differences.

~

v.,

GE submitted the required Radiological Contingency Plan on Y' ' I 8/27/81.

This submittal is currently under review by the NRC.

GE plans to consolidate the Emergency Plan and the Radiological Contingency Plan once the review is complete such that a single pla dealing with emergencies and contingencies exists for the The consolidated plan would employ the preferred regulatory formatandstandardnomenclature,andprovidetg.ovg*ran required level of detail.

,', p*3,f,'{h,f9.; I [d.

8201190673g00 3

Amount / Fee Cate PDR ADOCK O PDR Type of Fee. 4' C

Date Check Rec'd../.

3eceived Ey..hff4?b/f.G.L

[

A GENER AL ($ ELECTRIC Director-ONMSS November 25, 1981 Page 2 Section 8.2 of the WMD Emergency Plan requires an annual review and update.

The review has been performed and only minor changes were indicated.

Most changes were related to shifts in the organizational structure and operational procedures have been modified to accommodate these changes.

The general nature of these changes are depicted in the two attached charts.

In view of the current licensing activity in progress with the NRC on emergency planning, GE's comprehensive, implemented emergency response program and the inconsequential nature of 1981 revisions to the WMD. Emergency Plan, the person-effort and expense of revising the Emergency Plan at this time does not appear warranted or necessary in the public inte' rest.

Therefore, General Electric requests the authorization defined in the first paragraph of this letter.

Pursuant to 10 CFR 170.31, enclosed is a General Electric check for $150 to cover processing this request.

General Electric personnel would be pleased to discuss this matter further with you and your staff as you may deem necessary.

Very truly yours, GENERAL ELECTRIC COMPANY Charles M. Vaughan, Acting Manager Licensing & Compliance Audits M/C J26 CMV:bmw Attachments NSD-L i

~ _ -

_.n r

g s

u GENERAL h ELECTRIC

/

Director-ONMSS November 25, 1981

~

~

ATTACHMENT 1 Wilmington Manufacturing Department Organization

. u. s - a,.

MANUFACTURIltG f5F.P tRTu rT*

J A Long c.ners t uSnerer PLAXMING k 3'W'LLL N ' A4 MLI AL ALM A

  • g APPLICATIONS &

TECH 4 OLOGY &

MATERIA 1J

,ym n ett SERF!CES ENGIMEFR11G OPFRATION

-M4 Petet snaar LM G,ro.s.eman J L,,Ha.rena w 3. Vo. ung h ame PE v. e w

, c

..s>

FACILITIE3 e

MATERIALS it'J Mclwer

"* # 'E'E R' 'I"G' /

, A,B,,,e,s "sa -*

CHEMICAL N

TECam0 Lor,T w 3.D.ad.a AG GW McKenate w$w,e r FUEL QUALITY MAM;FACTCRING getvRANCE JE.bergm n EA a

=3 c.

. Lee s, e6LL PLLL CHEu! CAL FABRICAftOg REL REGMMY ML g rpJn4Tro1 JPER LTroy COMIONENT5 COMPLIA%cE QUALITY uF Iwatley RG Patterwe uT Hoss sJ Hendry w 3,S h"c*,I F LA 1-y 7

3-

4. a 6 s. w 6 c.

PLIA%CE ENVIRn44EMTAL

'"A RADIATIDM b M.f71 4t'r Pit 0TEt Flow FMGl%FFRING Pfl0TECTION CM % 4wghda til Smalley EMM g,g Act 6ae win = car te Fac t *~e p

'"r a rt ' '" "

6 s... k 4

. u a. 6.s

$ 4F ETT BAFETY F Vil%5 t R F4Gl%FtR JT Taylor

(

GE Pomerg

bmw

e s

GENER AL O ELECTRIC.

Director-ONMSS November 25, 1981 ATTACHMENT 2 Wilmington Manufacturing Department Emergency Organization GEttERAL MANAGER I

I EMERGENCY PREPARE 0 NESS COORDINATOR EMERGENCY DIRECTOR MAtlAGER - EMPLOYEE RELATIONS MANAGER -ouALTTy MANAGER - EQUIPMENT PANUFACTURIf4G ASStWe PANAGER - FUEL PANUFACTURING MANAGER - MATERIALS mat 1AGER - FIriA::CE PANAGER - PLANiiltiG & PROJECTS RECORDER mat;AGER - MA:1UFACTURI!!G TECI:NOIOGY & EllG l

11PNAGER-f7CITUlrinctiIC AN'I.TCliTIOS & StryICrs, l

EMERGENCY SITUATION ADVISORS SITE EMERGENCY SUPFORT EXTERNAL RELATICNS - PWiAGER-EMPLOYEE RELATIONS DAMAGE CONTROL - MANAGER-FACILITIES ih

L FT t

AL SAFETY -tt FIRE BRIGADE - MANAGER-INCUSTRIAL SAFETY

~

LOGISTICS

- FWiAGER-PROCUREMENT SURVEY TEAM

- PNiAGER-NUCLEAR SAFETY ENGR CCMMUNICATIONS

- SPECIALIST-CCMMUNICATICNS RE-ENTRY TEAM - PANAGER-NUCLEAR SAFETY ENGR REGULATORY

- MANA;gg. REGULATORY CCMFLIANCE l

PLANT MEDICAL - SITE MEDICAL DIRECTOR PLANT SECURITY - SPECIALIST-PLANT PROTECTION EXTERNAL SUPPCRT FACILITIES ENVIRONMENTAL - SENIOR ENGIriEER-ENVIRONMENTAL PROTECTION i

i i

i I

FUEL PANUFACTURING COMPONENTS PANUFACTURING EQUIPMENT MANUFACTURING SliE BUILDING MANAGER BUILDING PANAGER BUILDING MANAGER FACILITIES tWiAGEP (fWlAGER - FUEL (lW3AGER - FUEL COMPONEr1TS (l'ANAGER - EQUIPMCliT (lWiAGER - FACILIi!ES (W:UFACTURING)

OPERATI0ft) tWlVFACTURIt!G)

BUILDIt!G TEf?S

!!!!!LDifiG TFff*S CUILDING TEAFS BUILDING TEtMS SEAkut 5 RESCUE SET. nut & RLSCUE 5EARC..i. klRLE 5EARCH & RLSCUC FIRST A!D FIRST AID FIRST AID FIRST A!O C.

M.

Vaughan

bmw U

o

,ye y G y--

y

. ~ - - -

-,=

. - ~ -

._w-.--......-...-.

l

?

& r)

( L/ 7

'" LICE SE' AMENDMENTS" Docket No. 20 '// /,.3

$ (D N n N r/

William 0. Miller, License Fee Management Branch, ADM i

MATERIALS LICENSE AMENDMENT CLASSIFICATION

,y Applicant:

OE License No:

JOM -1097 Fee Category:

/d Application Dated: //1 s' -#/

Received:

/2. cI/

Applicant's Classification:

aM dub i

The above application for amendment has been reviewed by NMSS in accordance with S170.31 of Part 170, and is classified as follows:

1.

Safety and Environmental Amendments to Licenses in Fee Catecortes 1A throuah 1H, 2A, 2B, 2C, and 4A (a)

Major safety and environmental (b) flinor safety and environmental (c)

Safety and environmental (Categories ID through 1G only)

(d)

Administrative' 2

Justification for reclassification:

  • in k%

3.

The application was filed (a) pursuant to written NRC request and the amendment is being issued fcr the convenience of the Ccmmission, or (b)

Other (State reason):

L r

t Signature ((.

/2,,/

Division of Fuel Cycie"& Material Safety 3

~

Date /? /0 b.

_d

//#

'[ k{,ti i

=m 2003S x

,