Memorandum & Order Re 820305 Visit to GE BWR/6 Training Ctr. Simulations of Variety of Malfunctions Requested
ML20039G783
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 01/13/1982
From: Bloch P
Atomic Safety and Licensing Board Panel
To:
References
ISSUANCES-OL, NUDOCS 8201190132
Download: ML20039G783 (1)


Text

-

UNTED STATCS OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

'82 JAN 15 A10:52 Peter B. Bloch, Chairman Dr. Jerry R. Kline

}. _.kyj 3g.

Mr. Frederick J. Shon Omi In the Matter of Docket Nos. 50-440-OL EWED d /!/ S JCgg

/,

CLEVELAND ELECTRIC ILLUMINATING COMPANY, et al.

g/

y, N

(Perry Nuclear Power Plant, Units 1 & 2)

Jar u'Ary 13, 1982 ~.

.)

d JAN131932> -

MEMORANDUM AND ORDER er c"-,

-w =

F (Concerning Visit to BWR/6 Training Center)

T'

.g 3

3

\\4 O

the Board to visit the GE control room simulator at Tulsa, Oklahoma dL A Memorandum and Order of October 16, 1981 announced the i entjg-of March 1982.

Subsequently, with the cooperation of Cleveland Electric Illuminating Company, we have arranged that this visit will take place on March 5, 1982 from 9 am to 3 pm., at the General Electric BWR/6 Training Center, which is located about one hour's drive from Tulsa at the site of the Black Fox nuclear plant.

Representatives of Sunflower Alliance, Inc.,

and Ohio Citizens for Responsible Energy have indicated an intention of attending.

During the visit, the Board is interested in seeing simulations--in the simulator of the Perry control room--of a variety of malfunctions, ranging from serious accidents ta single or multiple instrument or gauge failures of no operational significance. We wish to be informed about how operators can distinguish among these condit ions and to examine portions of the control room manuaPto see whether appropriate, easy-to-use guidance is supplied.

We then wish to see similar simulations in the Nuclenet 1000 control complex and to comoare the ease of operator response in the two simulators.

Intervenors may suggest subjects of interest to them in written filings submitted at least two weeu refore the visit.

FOR THE ATOMI SAFETY AND LICENSING BOARD l

l rA 5O 9

5 Peter B. Bloch, Cnairman l

ADMINISTRATIVE JUDGE

,p Bethesda, Maryland 8201190132 820113 gDRADOCK 05000440 PDR

~

f RE3ULATORY INFOR4ATIOM DISTRIBUTION S Y S T E'4 (RIOS)

ACCESSION N39:3201170132 33C.3 ATE: B2/01/13 N3TARIZED: N3 20CKET *-

FACIL:50-440 2erry Nu: lear. Sower Plant, Unit 1,

Cleveland Electric- 05000440 s

50-441 Derry Nu: lear-power Plant, Unit 2, Cleveland Electric- 05000441-AUTH.NAME AJTi3R 4FFILIATION BLOCH,P.S.

4tomi:. Safety and Licensing Board Donel RECIP.NAME RECIPIENT' AFFILIATION

SUBJECT:

demorandan 1 order ce 8203305 visit to 3ElBdR/6 training etc. Simulations of variety of malfunctions requested.

DISTRISJTION C30E: )S023 COPIES RECEIVED:LTR _b'ENCLI_k SIZE:___j_____.,

Antitrust Issaances TITLE: von i

N O T E S : 1 : y. 3 4 4 = '.R 3 34(i.FAJ.KNER) 05000440 l

1:y. 3 4 4 -LR 3 3 4 (i. F A T.K N ER) 05000441 i

i 4

RECI21ENT-CO*IES RECIPIENTi COPIES 13 C33E/NAME' LTTR ENCL 10 CODE /NA4E LTTR E N C L' ACTION:

LIC SR.s2 BCi 1

LIC.SR 8 2. A-1 4 3 'J S T 3 N ', 4. 3.

1 INTERNAL: ASLAP 5

5 01 1

h ELD /PSS 1

li G

1 IE 2

2 PA 1

EXTERNAL: LPDR 1

1 NRC POR 1

NTIS 1

1 1

1 9

e B

t

\\

i

\\

Yi i

lh TOTAL NU43ER 3r.CO3IES RE3) IRED: LTTR p

ENCL,