Notifies That Followup Rept Responding to 801222 Generic Ltr Re Control of Heavy Loads Is Now Planned for Submittal in Mar 1982
ML20039G611
Person / Time
Site: Wolf Creek, Callaway  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/11/1982
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SY, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR SLNRC-82-02, SLNRC-82-2, NUDOCS 8201180490
Download: ML20039G611 (1)


Text

SNUPPS Standardized Nuclear Unit Power Plant System 5 choke cherry Road Nicholas A.Petrick Rockville, Maryland 20850 Executive Director (301) 8694010 January 11,-1982 SLNRC 8202 FILE: 0278 SUBJ: Control of Heavy Loads

r. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Docket Nos. STN 50-482 and STN 50-483

References:

1.

NRC Generic Letter, dated December 22, 1980:

Same subject 2.

SLNRC 81-48, dated June 22, 1981: Same subject 3.

SLNRC 81-106, dated September 17, 1981: Same subject

Dear Mr. Denton:

Reference 1 requested two submittals concerning the control of heavy loads. Reference 2 provided the first of these reports for the SNUPPS plants. Reference 3 informed the NRC of a delay in the submittal of the followup report. Additional analyses are required in order to complete the followup report which is now planned for submittal in March 1982.

Very truly yours,

%\\Q Nicholas A. Petrick RLS/jdk

((

cc:

G. L. Koester KGE D. T. McPhee KCPL RECEIVED D. F. Schnell UE T. E. Vandel NRC/WC S

JAN1'51982> r Resident Inspector NRC/ CAL ummm 8

7, mampa

~f n

$l 0 0201180490 820111 PDR ADOCK 05000482 A

PDR