Interim Deficiency Rept Re Reactor Coolant Pump Supports, A-490 Bolts.Replacement Bolts Not Yet Received.Final Rept by 820531
ML20039G589
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/05/1982
From: Mclendon G
ARKANSAS POWER & LIGHT CO., LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K81-0479, W3K81-479, NUDOCS 8201180466
Download: ML20039G589 (1)


Text

LOUISIANA 142 ORARONDE STRHT P O W E R & L i G H T[ P O BOX 6008

  • NEW ORLEANS. LOutSIANA * (5041 36670174 2345

'UNON sfsit$

January 5, 1982 G D. McLENDON Senior Vice President W3K81-0479 Q-3-A35.

e A

b RECEWSo s Mr. John T. Collins, Regional Administrator, Region IV f.C 1 U. S. Nuclear Regulatory Commission ] dSN1 ~6 }gg 7O  !

611 Ryan Plaza Drive, Suite 1000 -

B atta g Arlington, Texas 76012  % Mamanwagp,

SUBJECT:

Waterford SES Unit No. 3 N

' /

Docket No. 50-382 Interim Report of Potentially Reportable Incident No. 52

" Reactor Coolant Pump Supports - A-490 Bolts"

REFERENCE:

Interim Report W3K81-0338 dated 9/16/81

Dear Mr. Collins:

In the referenced interim report, LP&L committed to submit a final report on Potentially Reportable Incident No. 52 by December 31, 1981.

Activities af fecting the installation and acceptance of the A-490 bolts in the Reactor Coolant Pump Supports have been delayed. The replacement A-490 bolts have not been received on site, j

A final report on this item will be submitted by May 31, 1982.

l If there are any questions, please let us know.

Very truly yours,

. h. h 4,n GDMcL:WMM:ncd

1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
2) Director \

0ffice of Management Information and Program Control U. S. Nuclear Regulatory Commission /

h Washington, D. C. 20555