ML20039G475

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Dec 1981
ML20039G475
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/11/1981
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20039G476 List:
References
810111, NUDOCS 8201180290
Download: ML20039G475 (1)


Text

_

  • g l

RECEVED ,

2 JAN151982> 'r WlSC00 Sin Electnc m coumr mr,,t=,=,,",=, r" 231 W. MICHICAN. P.O. BOX 2046 MILWAUKEE, WI 53201 G M

/,

January ll, 1982 Director of Regulatory Operations U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Gentlemen:

MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of December 1981.

Very truly yours, s9 Assistant Vice President C. W. Fay l Attachments Copies to J. G. Keppler - NRC, Region III NRC Resident Inspector C. F. Riederer - PSCW s,

I l

[

810111 820118029005000266 PDR PDR ADOCK R

l