ML20039G374

From kanterella
Jump to navigation Jump to search
Advises That Fuel Load Has Been Delayed to No Sooner than 820315,due to Delays in Steam Testing & Subsequent Schedule re-evaluation
ML20039G374
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 01/14/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AECM-82-21, NUDOCS 8201180117
Download: ML20039G374 (1)


Text

))

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EmelMdidd5 P. O. 8 O X 164 O. J AC K S O N, MIS SIS SIP Pl 3 9 2 05 JAMES P. McGAUGHY. JR AS$tST ANT VtCE MESIDENT Janua ry 14, 1982

,%CGtVED U.S. Nuclear Reguletory Commission

"~

Office of Nuclear Reactor Regulation C

J/\\N 1'51982>- Cb !

Washington, D.C.

20555 I c s::Ju ram t:223 gown r anit Attention:

Mr. Harold R. Denton, Director A

f

Dear Mr. Denton:

/

o

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416 and 50-417 File 0260/L-835.0/0472 Change in Fuel Load Schedule AECM-82/21 This is to advise you that due to delays in system testing and subsequent schedule re-evaluation, the fuel load for Grand Gulf Nuclear S ta tic,:t Unit I has been delayed to no sooner than March 15, 1982.

Yours truly, l

Y i' la 7

/

JPM/j gt l

cc:

Mr. N. L. Stampley Mr. G. B. Taylor l

i Mr. R. B. McGehec l

Mr. T. B. Conner Mr. Richard C. DeYoung, Director Office of Inspection Enforcement l

U.S. Nuclear Regulatory Commission Washington, D.C.

20555 I

i 1

8201180117 820114 DR ADOCK 05000416 PDR l

AESEEl 6: 0 Member Middle South Utilities System