ML20039G374
| ML20039G374 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 01/14/1982 |
| From: | Mcgaughy J MISSISSIPPI POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| AECM-82-21, NUDOCS 8201180117 | |
| Download: ML20039G374 (1) | |
Text
))
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EmelMdidd5 P. O. 8 O X 164 O. J AC K S O N, MIS SIS SIP Pl 3 9 2 05 JAMES P. McGAUGHY. JR AS$tST ANT VtCE MESIDENT Janua ry 14, 1982
,%CGtVED U.S. Nuclear Reguletory Commission
"~
Office of Nuclear Reactor Regulation C
J/\\N 1'51982>- Cb !
Washington, D.C.
20555 I c s::Ju ram t:223 gown r anit Attention:
Mr. Harold R. Denton, Director A
f
Dear Mr. Denton:
/
o
SUBJECT:
Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416 and 50-417 File 0260/L-835.0/0472 Change in Fuel Load Schedule AECM-82/21 This is to advise you that due to delays in system testing and subsequent schedule re-evaluation, the fuel load for Grand Gulf Nuclear S ta tic,:t Unit I has been delayed to no sooner than March 15, 1982.
Yours truly, l
Y i' la 7
/
JPM/j gt l
cc:
Mr. N. L. Stampley Mr. G. B. Taylor l
i Mr. R. B. McGehec l
Mr. T. B. Conner Mr. Richard C. DeYoung, Director Office of Inspection Enforcement l
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 I
i 1
8201180117 820114 DR ADOCK 05000416 PDR l
AESEEl 6: 0 Member Middle South Utilities System