ML20039G346
| ML20039G346 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 12/15/1981 |
| From: | COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML20039G336 | List: |
| References | |
| EPIP-420-1, NUDOCS 8201180081 | |
| Download: ML20039G346 (6) | |
Text
-.. -.
D.
6mani'=+
" muu'M
-WW e
++6ge.. e y
M.A m
i.e a.
g.%n.,
,A....-g,%w%,,,=4w, me_a,.,_e, g
g
~
'^
TECWICAL SUPFORT CENTER QJARTERLY SURVEILLAFCE EPIP 420-1 TABLE OF CONTENTS SECTION TITLE PAGE DATE REVISION Table of Centents 1
DEC 15 1981 2
A.
Purpose 2
DEC 15 1981 2
8.
References C.
Prerequisites O.
Precautions E.
Limitations & Actions F.
Procedure 3
DEC 15 1981 1
G.
Checklist H.
Technical Specification / References Attachment A 4
DEC 15 1981 1
Attachment B 5
DEC 15 1981 1
4 b
i N
This procedure ccntains 5 pages.
APPitOVED dkhkI!ddhhh5 0042E D
O PDR
,14 x
e.
y-e-.
,,--r,
m~
i n
Is a change to the Technical Specifications needed?
Yes No /
Is the probability of an occurrance or the consequence of an accident or malfunction of equipment ic:portant t safty as previously evaluated in the SAR increased?
Yes No Because:
A Utb Cg;-twv g WU Y
f
~
y y >2-pa w & w 77C 2 W WL LA% W N/IA
/?Ger-W I
Is the possibility for an accident or malfunction of a different type than any previously evaluated in the SAR created? Yes No R Because:
MG 4
Is the c:argin of saf ty, as defined in thy basis for any Technical Specification, reduced? Yes No
- Because:
f& W Prepared Sy D
Date Temporary Review
._, _ Per=anent Review W & r /q.,) Da,tt,,g Appr. Not Appr.
,5gna$ur Signature Date Appr.
Not Appr.
mht-Er
.D D
s o D.
O v.-wk ::i,M-D NDYhW# [=}- -
~
Station Superintendent:
[
D D.
If not approved, explain:__
f m.
iW&
/1-IT-II Station Superintendent Appr. Date Effective Date (Appr. for perm. use)
(if different from appr. date) 4
- 44 T ' EMM M & b # = ie *#M'=w
=D eO
- M.,#-g h -' *g AAg 4 4.gp
- #4,W e Mg g g,,,
.q g,
,,,,4
,,%g g,
,4_a e
a 9 l
i ~~
L-. ~ __..
l--......--..
l'
. - L
' ~
~ ~
9 9
t EPIP 420-1 Rev. 2 i
DEC 15 1981 m
TEClf4ICAL SUPPCRT CENTER QJARTERLY SURWILLANCE A.
PURPOSE The purpose of this procedure is to outline the non-radiological items necessary to maintain the Technical Support Center (TSC) in a state of operational readiness.
B.
REFEPENCES i
j 1)
Generating Station Emergency Plan (GSEP) 2)
EPIP 410-1 "On-Site Support Centers" i
3)
EPIP 550-5 "TSC and OSC Radiological Supplies" i
C.
PREREQUISITES None D.
PRECAUTIONS tbne E.
LIMITATIONS & ACTIONS 1)
An inventory of the TSC will be conducted quarterly.
2)
Missing supplies will be corrected.as soon as possible.
3, This covers only non-radiological equipment in the TSC. For radiological equipment, see EPIP 550-5.
k I
l t
0042E 2
Tvwgw
+
y e
,e
_g e -
w-p
=
O
+
EP1P 420-1 Rev. 1 DEC 15 1981
(,
~
F.
FROCEDURE 1
1)
Perform an equipment test and inventory of the supplies as outlined in Attactrent A - B.
Note any missing items en the forms.
2)
The GSEP Coordinatcr will be responsible for all completed Attachments, control of all inventory checks, etc.
i G.
CHECXLISTS 1)
Attachment A - TSC Equipment Operational Checklist
- 2) - TSC Documents Checklist i
e H.
TECFNICAL SPECIFICATION REFEREBCES None 4
(
l 9-0042E 3
l r
u EPIP 420-1
~.
Rev. 1 DEC 15 1981 p.,
ATTACH'ENT A TSC EQUIP?ENT OPERATION /'L CHEC< LIST i
I FAILED COMfENTS EQUIPMENT -
PASSED SyF5 Terminal Reader / Printer CRT Disolay Telecccier Xerox Ccoler Food Secoly Office Suoplies Date:
Initials:
I l
t s
i e
OCA2E A
~.
~ _ _. _.. _ _
4 i
EPZP 420-1 Rev. 1 1
CEC 15 1981 I
o ATTACHICNT 8 TSC DOCUENTS CHECXLIST i
l i
DESCRIPTION Quantity Quantity Q)t4ENTS Recuired Present RP Procedures -
1 ZCP Procedures 1
I HP Reference Books Various GSEP/ Annex 1
l Zion EPIP's 1
j Environmental Director EPIP's 1
Environs Group EPIP's 1
l RP In-Plant Survey Maos 10 ea ECP Procedures I
i l
,1 AOP Procedures 1
i Tech Scecs 1
1 GCP Procedures 1
i I
ZAP Procedures 1
j j
P&ID's (set) 1
]
1 l
l 1
Date:
Initials:
i i
I i
1 1
I i
j j
j i
i f
FINAL 0042E 5
I i
- - -