ML20039F816
| ML20039F816 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 12/18/1981 |
| From: | Larry Wheeler Office of Nuclear Reactor Regulation |
| To: | Miraglia F Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8201130412 | |
| Download: ML20039F816 (4) | |
Text
y g,
y,-
y, 77 y
~
e g
g g
g Lg HECENED 9-DEC297985 t DEc 181981
~
a nam Docket Hos.: 50-443/444 O
HEMORANDUM FOR:
F. J. Miraglia, Chief, Licensing Branch No. 3. DL FROM:
L. L. Wheeler, Project Manager, Licensing Branch No. 3 DL
SUBJECT:
NOTICE OF MEETING WITH UNITED ENGINEERS AND CONSTRUCTORS DATE AND TIME:
Thursday, January 7, 1982 9:00 a.m. to 4:00 p.m.
Friday, January 8,1982 9:00 a.m. to 4:00 pm LOCATION:
United Engineers and Constructors, Inc.
30 South 17th Street Philadelphia, Pennsylvania PURPOSE:
1.
To review the applicant's piping analysis procedures and audit selected seismic Category I piping stress reports 2.
To review the ASME-required documents for selected safety-related plant components.
PARTICIPANTS:
NRC Staff PNL ORNL L. Wheeler G. Beeman E. Rodabaugh D. Terao J. Alzheimer United Engineers and Constructors H. Katz, et.al.
Louis L. Wheeler, Project Manager Licensing Branch No. 3 Division of Licensing
Enclosure:
Agenda cc: See next page.
This meeting is open to interested members of the public, petitioners or other parties to attend as observers pursuant to NRC staff policy on openm eetings.
Members of the public wishing to attend should contact Mr. L. Wheeler at 301-492-7792 by December 30, 1981 so that arrangements can be made for their attendance, ome,p.DL:LB##3 DL:LB eur m a)
"LLW 'e e.r:j b....
- a..g l.i..a
~..
i omb 12 / /81 12/ /81 1
8201130412 81121s f)RADocKosooo
-OFFICIAL RECORD COPY
+ =m a*-329 824
~
+
AGENDA January 7, 1982 9:00 a.m.
Begin piping system audit. Review the following:
1.
Division of piping analysis 2.
Modeling techniques 3.
Analysis methods 4.
Interaction of other piping with Seismic Category I piping 1:00 p.m. Complete piping system audit.
Review the following:
1.
Small bore piping 2.
Buried piping 3.
ASME Class I analysis 4.
Piping stress reports January 8, 1982 8:30 a.m.
Begin design documentation review.
Examine design specifications for a pump, a valve, a piping system and a support.
12:30 p.m. Complete design documentation review.
Examine design reports for a pump, a vlave, a piping system and a support.-
e-S W
,.m"
t BROOK.
William C. Tallman Chairman and Chief Executive Officer Public Service Company of New Hanpshire P. O. Box 330 Manchester, New Hampshire 03105 John A. Ritscher, Esq.
E. Tupper Kinder, Esq.
4 Ropes and Gray
~ Assistant Attorney General 225 Franklin Street Office of Attorney General Boston, Massachusetts 02110 208 State House Annex Concord, New Hampshire 03301 Mr. Bruce B. Beckley, Project Manager Public Service Company of New Hampshire The Honorable. Arnold Wight P. O. Box 330 New Hampshire House of Representatives Manchester, New Hampshire 03105 Science, Technology and Energy Committee 4
State House.
-G. Sanborn Concord, New Hampshire 03301 U. S. NRC - Region I 631 Park Avenue Resident Inspector King of Prussia, Pennsylvania 19406 Seabrook Nuclear Power Station c/o U. S. Nuclear Regulatory Commission Ms. Elizabeth H. Weinhold P. O. Box 1149 S Godfrey Avenue Seabrook, New Hampshire 03874 Hanpton, New Hampshire 03842 Mr. John DeVincentis, Project Manager Robert A. Backus, Esq.
Yankee Atomic Electric Conpany.
O'Neill, Backus and Spielman 1671 Worcester Road 116 Lowell Street Farmingham, Massachusetts 01701 Manchester, New Hampshire 03105 3
Mr. G. F. Cole, Project Manager Norman Ross, Esq.
United Engineers and Constructors 30 Francis Street 30 South 17tW Street Brookline, Massachusetts 02146 Post Office Box 8223
~
Philadelphia, Pennsylvania 19101 Karin P. Sheldon, Esq.
Sheldon, Harmon & Weiss Mr. W. Wright, Project Manager 1725 I Street, N. W.
Westinghouse Electric Corporation j '
Washington, D. C.
20006 Post Office Box 355 Pittsburg, Pennsylvania 15230 Laurie Burt, Esq.
Office of the Assistant Attorney General Thomas Dignan, Esq.
Environmental Protection Division Ropes and Gray I
One Ashburton Place 225 Franklin Street Boston, Massachusetts 02108 Boston, Massachusetts 02110 D. Pierre G. Cameron, Jr., Esq.
General Counsel Public Service Company of New Hampshire P. O. Box 330 Manchester, New Hampshire 03105
r-
.(
6, *
~
MEETING MOTICE DISTRIBUTION Docket File 50-.uy3f,i'd ISE Region I NRC PDR I&E Region II Local PDR I&E Region III 9-NSIC I&E Region IV TERA I&E Region V LB!3 Files NRC Particinants 8
- enhut 7
R. Purple EXXX5HMMXM R. Tedesco 3XXAIMMNINEN B. J. Youngblood e-A. Schwencer F. Miraglia E. Adensam J. Miller G. Lainas R. fiattson T. Wambach, Acting T. Speis B. Russell M. Srinivasca D. Crutchfield
- 0. Parr T. Novak F. Rosa S. Varga B. Sheren, Acting T. Ippolitto W. Kreger R. Clark R. Houston J. Stolz W. Gammill R. Vollmer F. Congel J. Knight L. Rubenstein R. Bosnak W. Butler F. Schauer C. Berifnger R. Jackscn
,G. Lear.,
F. Schroeder
. K. Kniel'
,.s,;.
_, c. Atttirney,,.0 ELD.,..
....y......
q.
u.,D..Skqvho.1D.. p
..-l.......~4.-
G. Kn'i'ghton OIE (3)
ACRS (16)
M. Ernst OSD (7)
A. Thadani J. LeDoux, I&E W. Minners B. Grimes, I&E S. Hanauer M. Wfiliams, DL H. Thompson W. Johnston D. Vassallo S. PawlicRi P. Collins V. Benaroya D. Ziemann Z. Rosztoczy V. Moore W. Haass D. Muller bec: Applicant Service List R. Ballard W. Regan Branch LB#3
,A. Toalston Project Manager _lm Wheeler Licensing Assistant J. Lee m
+s
- - - -. - ~.
m:-
f.g a
3
-.-m--
m en.yy--yy w-y--<v n
-.vy,+
y