ML20039F618

From kanterella
Jump to navigation Jump to search
Requests Emergency Tech Spec Change to Provide for Returning to Power Operation.Since Existing Tech Spec Limits Are Expired,Util Will Abide by NSSS Pressure/Temp Limits Identified in 810918 Proposed Tech Spec Change Request
ML20039F618
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 01/08/1982
From: Bordine T
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
NUDOCS 8201130155
Download: ML20039F618 (1)


Text

_

CORSuliiBIS a ' E.tra'4 N

Power C0r:193Hy Acq. g

.1 6;,gg11Q )

c.nores omces: 212 West Michigen Avenue, Jeckson, MI 49201 * (517) 788-0550 January 8, 1982 k

Dennis M Crutchfield, Chief Operating Peactors Branch Eo 5 Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-155 - LICENSE DPR !

BIG ROCK POINT PLANT An Emergency Technical Specification Change is requested to provide for returning to power operation as a result of our telephone conference call today with Richard Emch and Heal Randa2 7. of your staff. Since existing Technical Specification limits are expired, during startup Big Rock Point will abide with the NSSS Pressure / Temperature Limits identified by our

+

September 18, 1981 Proposed Technical Specification Change Request - Reactor Vessel Criticality, Couldown, Heatup and Hydrotest Limitations.

J - ~ d~\\

alJ Thomas C Bordine Staff Licensing Engineer CC Director, Region III, USNRC NRC Resident Inspector-Big Rock Point DD 5

I.D 8201130155 820100 PDR ADOCK 05000155 P

PDR

- _ - - _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _