Public Version of Revision 1 to Emergency Plan Implementing Procedure 1903.61, Communications Equipment Tests
ML20039F174
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 12/23/1981
From: Ohanlon J
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20039F169 List:
References
1903.61-01, 1903.61-1, NUDOCS 8201120117
Download: ML20039F174 (9)


Text

v f,') ' '

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One o

/

COMMUNICATIONS EQUIPMENT TESTS 1903.61 REV. 1 f

p4

g-l;oleciM 30py # /o1 j

]

RECORD OF CHANGES AND REVISIONS PAGE REVISION CHANGE PAGE REVISION CHANGE PAGE REVISION CHANGE 1

1 2

1 3

1 4

1 5

1 6

1 7

1 8

1 i

p A;,eeV A. e_.

e sen 8u7 mms l

F PDR

PLANT MANUAL SECTION:

PROCEDUREAVORK PLAN TITLE:

NO:

EMERGENCY PLAN PROCFDURE COMMUNICATIONS EQUIPMENT TESTS 1903.61 PAGE 1 of 8 (O7 ARKANSAS NUCLEAR ONE aEvisioN 1 DATE 10/13/81 CHANGE DATE 1.0 PURPOSE The purpose of this procedure is to provide the requirements for testing the emergency communications equipment and to identify the necessary roster /

call lists that must be verified periodically.

2.0 SCOPE This procedure applies to communications systems and roster / call lists that would be used during an emergency situation at ANO.

3.0 REFERENCES

3.1 References Used in Procedure Preparation 3.1.1 Arkansas Nuclear One Emergency Plan 3.2 References Used in Conjunction with this Procedure 3.2.1 None 3.3 Related ANO Procedures s_/

3.3.1 None 4.0 DEFINITIONS None 5.0 RESPONSIBILITIES 5.1 The Emergency Planning Coordinator is responsible for coordinating ANO emergency communications equipment tests as required by this procedure.

6.0 DESCRIPTION

6.1 The following communications equipment / systems are available for use during an emergency:

6.1.1 Continental Telephone system 6.1.2 ANO plant phone system 6.1.3 Gai-tronics paging system 6.1.4 ANO radio system

[)

6.1.5 NRC ENS (Ifotline) phone U

6.1.6 NRC HPN phone

PLANT MANUAL SECTION:

PROCEDUREN/ORK PLAN TITLE:

NO:

EMERGENCY PLAN PROCEDURE COMMUNICATIONS EQUIPMENT TESTS 1903.61 C~x ARKANSAS NUCLEAR ONE PAGE 2 of 8 aEvision i oa1E 10/13/81 CHANGE DATE 6.2 The following roster / call lists are maintained in each Control Room for use during an emergency:

6.2.1 Duty Emergency Coordinator Roster 6.2.2 Staff Augmentation Group Roster / Call List 6.2:3 Beeper Assignme.,t Lint 7.0 INSTRUCTIONS 7.1 The following items shall be accomplished on a monthly basis by the Emergency Planning Coordinator or a designee:

7.1.1 Verify the operability of the direct Continental Telephone lines to each Control Room.

7.1.2 Verify the operability of the radios located in at least one of the following areas:

A.

Unit One Control Room B.

Unit Two Control Room

,C C.

Technical Support Center D.

Emergency Control Center E.

Site Vehicles (except Security vehicles)

F.

Communications Equipment Locker G.

AP&L Lochl Office 7.1. 3 -

Verify the operability of the NRC-HPN phones in at least one of the following locations:

A.

Unit One Control Room B.

Unit Two Control Room C.

Technical Support Center D.

Emergency Control Center n

v

l PLANT M ANUAt SECTION:

PROCEDUREANORK PLAN TITLE NO:

EMERGENCY PLAN PROCEDURE COMMUNICATIONS E0UIPMENT TESTS 1903.61 PAGE 3 of 8 O

ARKANSAS NUCLEAR ONE aevisioN i o*TE 10/13/81 A/

CHANGE DATE 7.1.4 Verify the telephone numbers for the following groups:

A.

Nuclear Regulatory Commission B.

Arkansas Department of Health

~

C.

Little Rock Control Center D.

Four - Coun y Sheriffs E.

National Weather Service 7.1.5 Verify the placement and correctness of the roster / call lists maintained in the following locations:

A.

Unit One Control Room B.

Unit Two Control Room 7.1.6 The following communications equipment / systems do not re-quire additional testing due to the indicated reasons:

fS A.

NRC-ENS (Hotline) phone (used daily by the Shift Super-(,1 visors).

B.

ANO plant phone system, AP&L microwave system and the Gai-tronics paging system (u: ed as a part of normal plant operation).

C.

Early Warning System (tested by the State of Arkansas).

7.2 Form 1903.61A, " Monthly Communications Testing Record", should be com-pleted to document the pe,rformance of the monthly test.

7.3 Communications links between the plant, federal, state and local emergency operation centers and field assessment teams shall be tested annually (this may be done as a part of the plant's annual exercise). Form 1903.61B should be completed to document this test.

8.0 ACCEPTANCE CRITERIA 8.1 Tests shall be carried to a conclusion such that the test is adequate to verify equipment operability.

8.2 Upon discovery of inoperable emergency communications equipment, ac-tion shall be taken to initiate repair of the equipment.

/^\\,

e'%)

s

PLANT MANUAL SECTION:

PROCEDURE /WORX PLAN TITLE:

NO:

EMERGENCY PLAN PROCEDURE COMMUNICATIONS EQUIPMENT TESTS 1903.61 i

O-ARKANSAS NUCLEAR ONE PAGE 4 of 8 aevision i oars 10/13/81 CHANGE DATE 8.3 Emergency communications equipment shall be tested following repairs to ensure that the repair effort was successful.

9.0 ATTACHMENTS AND FORMS 9.1 Attachment 1, " Emergency Communication Links" 9.2 Form 1903.61A, " Monthly Communications Testing Record" 9.3 Form 1903.61B, " Annual Communicstions Testing Record" m

k O

~_ -.. -.. - -..

-.,.--..,.,.. --. ~ -

PLANT MANUAL SECTION:

PROCEDURElWORK PLAN TITLE:

NO:

EMERGENCY PLAN PROCEDURE COMMUNICATIONS E0UTPMENT TESTS 1903.61 __

PAGE 5 of 8 ARKANSAS NUCLEAR ONE atvisiON i oATE 10/13/8 CHANGE DATE ATTAC M U 1 l

}

-r r-i-

p-'

~

l

+w Communication Links Available W

4,ij,

a y

y ( 0t "gM Between the Emergency Response

=

a Centers a,[,

{

yg O

$w d

0I Y

D C ' f 3 U Il$ Nl C UN70 20

  • a w%.

g 5 $$3E U

i2 7C $ "'

Ue G:

  • i< 2 ;' wC w G'Y 27) j m

3"n" w

";3 0

35 8 wast 31dE Si 3-S$

i

" g

  1. CE Eli'de os ": at M E g $ "C al M

5Fw M

". 3 M E2 $ $2 I!d I. I v. S2.I 2 E

c m a v a.:

4 :

cc eHa vn.d d !s a C) o.:

1 1

1 i

1 1

1 g

g g

g CONTRCL R00=1 3

3 3

I 6

6 6

7 8

1 g

4 4

5

_6_._

8 8

8 CNSITE OPERATICNAL SUPPORT CENTER 3

f 3

1 1

1 1

1 1

1 1

1 1

~

4 2

1 1

3 ONSITE TECHNICAL SL'PPORT CENTER 3

4 3

1 1

1 2

1 1

1 1

1 1

4 A

I I

I i

1 1

1 1

EMERGENCY CONTR;L CENTER 3

3 3

1 7

2 5

5

,I I

I RL'SSELLVILLE FIRE DEPART"ENT 1

1 1

1 1

1 1

1 1

1 1 'T

~

l 1

L I

P0FE CCL'NTY SIERIFF CFFICE 6

I I

I I

I 6

6 6

6 NRC RTGICN IV C5TICE JD EETHEstA 7

7 1

1 1

1 1

1 1

1 O

g g

g AP&!. COPJCRATE OFFICES 1

1 1

1 1

1 1

1 1

1 1

1 I

pu,m apaa LITTLE ROCK 2

2 2

2

-m m.

s.

e 1

1 1

1

/

STATE CF A?X\\NSAS 5

1 1

1 6

6 6

I I

I I

8 6

8 I

I CFFICd OF T*ERCENCY SERVICFS 8

5 6

6 I

CEPART'fENT OF EEALTH 1

1 1

1 8

1 1

1 8 I 8

8 ST. MAkY'S HOSPITAL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

POPE COUNTY LMEROENCY I (

1 1

1 1

1 6

6 1

6 1

CPFRATIONS CENTTR 8

8 8

8 1

LOGAN. YELL *, A.%D JOHNSON COUNTY 6

1 1

1 L

1 1

1 1

1 1

1 1

EMERGENCY OPERATIONS CENTERS 8

6 6

6 6

6 8

8 8

J.S. LLPART"ENT OF ENERGY

~

CAK RIDGE RADIGILGICAL 1

1 1

1 1

1 1

1 1

1 1

1 1

COORD1 HATING CITICE I

s COMMUNICATICM LINKS:

1 - Continental Telephone

a. **asre -cm-d 2 - AP&L Microwave Telephone ia -

=#-.

3 - Plant Phone Sytten 4 - Cai-Tronics Paging System 5 - ANO 4 Channel Radte 6 - Pope County Shertif's Radio / Frequency 7 - Hct Line 8 - OES Radio / Frequency

  • Number 8 not applicable.

-.,i

--.w w.

_,,---w.w--.%,

4

.9

-,w.m--.--ery-9 w

m

PLANT M ANUAL SECTION:

PROCEDURE / WORK PLAN TITLE:

NO: '

EMERGENCY PLAN PROCEDl%E COMMUNICATIONS EQUIPMENT TESTS 1903.61 PAGE 6 of 8 ARKANSAS NUCLEAR ONE aEvisioN i oATE 10/13/81 CHANGE DATE I

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One MeVTut y enWNir4TTON9 TrtTINr. 9Fenc9 l F0" "O~

10 M 614 N

PC #

REV. #

tage i et c 1.0 COTfL3ICATIONS EQUIPMENT OFERABILITY TEST Date 1.1 Direct Continental Telephone Line Location Results AD 1 AN9-2 1.2 ANO Radios

_ Location Channels Tested Re,sults

. ~..

1.2.1 ANO-1/ANO-2/

1, y,4,5,6.7,8 g

]

TSC/ECC 1,2,3,4,5,6 1.2.2 ANG Van 1 2,3 1

1.2.3

_ANO Pickup 1,2,3 1.2.4 GM Car 1,2,3 1.2.5 Portable Radios:

Unit 1,2,3 Unit 1,2,3 Unit 1,2,3 Unit 1,2,3 Unit 1,2,3 Untt 1,2,3

~

Unit g

1,2,3 Unit 1,2,3 Unit 1,2,3

~~

Untt 1,2,3 Unit 1,2,3

.suo s Unit 1,2,3 1.3 hE -HPN Phones I.ocation Results ANO,1/ANO-2/TSL/ECC A

a s

PLANT MANUAL SECTION:

PROCEDURE / WORK PLAN TITLE:

NO.

EMERGENCY PLAN PRorFntmE COMMUNICATIONS EOUTPMENT TESTS 1903.61 PAGE 7 of 8 ARKANSAS NUCLEAR ONE aEvisioN i oATE 1o/13/8i CHANGE DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One l F0W NO.

N nsw v en-e:t e m m:e eve,n:n trene,

,_,r, REV. # 1 PC f Page 2 of 2 1.4 Key Button Phones Location Lines Tested Results

1. '. 1 Ah0-1 (Sta.

)

1.4.2 ANO-2 (Sta.

_)

1.4.3 ISC (Sta.

)

1.4.4 ECC (Sta.

)

2.0 TELEPHONE NWBER VERIFICATION Agency Phone No.

. ~. w 4

2.1 NBC 2.2 Department et Health 8

O 2.3

_Little Rock Control Center 2.4

, f:ational Veather Service 2.5 Pope County Sheriff 2.6 Yell County Sheriff 2.7 Johnson County Sher _iff 2.8 Logan County Sheriff 29 Pope Co. Ambulance Service 2.10 Russellville F.re Department 2.11 St. Mary's Hospital 2.12 Millard Henry C11ric l

2 13 Babcock & Wilcox 2.14 Combustian Engancering 3.0 ROSTER / CALL LIST VERIFICATION 6

List ANO-1 ANO-2 3.1 Duty Emergency Coordinator 3.2 Stati augmentation Group:

Technical Support HP/ Radiochemistry 3ew Ma irit e na n c e

' 5 'a** ~e 4 +. * * -

3.3 Beeper Assignment List 4.0 CORRECTItT ACTION REQUIRED (IF ANT):

Performed By AU g-a

-F

.*P4.%.e

'w-gp

.W

,m_

PLANT M ANUAL SECTION:

PROCEDUREMIORK PLAN TITLE:

NO: '

EMERGENCY PLAN PROCEDURE COMMUNICATIONS EQUIPMENT TESTS 1903.61 PAGE 8 of 8 O

ARKANSAS NUCLEAR ONE aEvisioN i oATE 10/13/81 CHANGE DATE ARKANSAS POWER & LIGHT COMPANY Arkansas fluclear One l FOW Na titLL 3yyp g en,,Nir\\TTON TrtT Mn erroon 3nn, g3, REV. # 1 FC #

Date Location Phone No.

Results Pere County EOC Yell County EOC Logan County i.OC.

Johnson Cou.aty EOC TOCC v.# o

, ~~;

Performed By 4

2 e h '.F

'%'N

- MNW<

ae i

I T

I

,y 6j,.:.

i r s. w.:..

.-....l..

.