. C-E Power Systems Te' 703/688-1911
- IloO Combustion Engineenng, Inc.
Telex 99297 1000 Prospect Hill Road
%)
j,"
Windsor. Conrmticut 66095
/
s 3m M
[ % ;: @,3 POWER g SYSTEMS C
- p. dg4/pfg4 November 9, 1981 N
License No. SNM-1067 M4--II O
Docket 70-1100
\\
O U. S. Nuclear Regulatory Commission g
Washington, DC 20555 Attention: Mr. R. G. Page, Chief Uranium Fuel Licensing Branch Division of Fuel Cycle & Material Safety
Reference:
- 1) NRC Order to Modify License SNM-1067 from R. E. Cunningham to H. V. Lichtenberger, dated February 11, 1981 (Radiological Contingency Planning Information)
- 2) Letter from R. E. Cunningham, NRC to H. V. Lichtenberger, C-E dated May 14, 1981 Extending Due Date of Radiological Contin-gency Plan by 60-Days
Dear Mr. Page:
!' is requested that Combustion Engineering, Inc., be granted an additional 60-day extension to comply with the requirements of the above referenced NRC Order for the following reasons:
- 1) We submitted our license renewal application on December 18, 1980 and after several revisions, resubmitted our entire license renewal in October 1981. The NRC is at present reviewing our, application and further revisions might be required.
E es
,i m
- 2) We also submitted a 5-year up-date of our environmd7 tral igippct formation in October 1981.
Resciution of NRC commdh asca res t of a review by an Oak Ridge consulting team requirsTba greht de of revised information to be generated for the submittaT.
G E
22:
- 3) At the beginning of October 1981 our Supervisor of @ealth2hysics &
Safety, who had the responsibility for preparing tH~e planGo comply with the order, resigned to take another position.
We have filled the position with another employee, but he will need more time to com-plete the required Radiological Contingency Plan.
JQg
,p/\\PK';"i Very truly yours,
,/
/
WW 7
$[2[ '
gEC2 f" f~=
H. V. Lichtenberger y,.
%g /?
Vice President-Nuclear Fuel A
t..
4 Nuclear Power Systems-Manufacturing (fN HVL/FJP/ssb j
8201110931 811109 PDR ADOCK 07001100 I@g C
,