ML20039E696

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 80-11, Masonry Wall Design. Procurement & Operational Delays Have Precluded 820101 Completion Date for Repairs.Estimated Completion Date Is 820601
ML20039E696
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/24/1981
From: Lentine F
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-SSINS-6820 IEB-80-11, NUDOCS 8201110189
Download: ML20039E696 (1)


Text

/^'N Commonwealth Edison l

) one First Nati;nal PlaIS, Chicago, Ilknois

\\

', Address Reply to: Post Office Box 767

\\ _ / Chicagc. illinois 60690 December 24, 1981 Mr. James G. Keppler, Regional Administrator Directorate of Inspection and a

Enforcement - Region III O

U.S. Nuclear Regulatory Commission 799 Roosevelt Road 4

4 RECEIVED Glen Ellyn, IL 60137

?

JAN 7 1ggy b2 "ET&y 7

Subject:

Zion Station Units 1 and 2 Supplement Response t o I.E.

Tsc g

Bulletin 80-11 Concerning

" Masonry Wall Design" A

NRC Docket-Nos. 50-295 and-304 g

Reference (a):

T.

J. Rausch letter to J. G.

Keppler dated Decembe r 11, 1980.

Dear Mr. Keppler:

Reference (a) provided the Commonwealth Edison Company repair schedule for the masonry walls at Zion Station requiring repair as a result of I.E.Bulletin 80-11 review.

In that response it was stated that the necessary repairs would be completed by January 1, 1982.

This is to inform you that due to unforseen delays in material procurement and operational restrictions that preclude work in certain areas with the units operating, our estimated completion dated has been extended to June 1, 1982.

Please address further questions regarding this matter to this office.