ML20039D543

From kanterella
Jump to navigation Jump to search
Forwards,Testing at Fort St Vrain After Installation of Region Constraint Devices
ML20039D543
Person / Time
Site: Fort Saint Vrain 
Issue date: 12/10/1981
From: Lee O
PUBLIC SERVICE CO. OF COLORADO
To: Novak T
Office of Nuclear Reactor Regulation
Shared Package
ML20039D544 List:
References
FSV-65, P-81312, NUDOCS 8201050173
Download: ML20039D543 (1)


Text

g -.

e s

b b

PUBLIC SERVICE COMPANY OF COLORADO P. O. B O X edO DENVER.

COLORADO 8070 OSCAR R. LEE Fcrt St. Vrain v cr..c.ec r Unit No.1 e

g P-81312 f3 \\l'h7f RECElyyn 4

Mr. Thomas M. Novak JAN 4' l

b2 Assistant Director for Operating Reactors g

n era Division of Licensing c%r s e Demar U.S. Nuclear Regulatory Commission Icc 9

Washington, DC 20555

/

Co to

Subject:

Testing at Fort St. Vrain After Installation of Region Constraint Devices P

Reference:

PSC letter from F.E. Swart to J.R. Miller, P-81047, dtd 2/5/81

Dear Mr. Novak:

Enclosed are forty copies of report GA-C16277, " Testing at Fort St. Vrain After Installation of Region Constraint Devices."

This report summarizes the results of the RT500H tests performed in November-December 1980 below 70% power with the region constraint devices installed, in which attempts were made to induce fluctuat r is.

The earlier draft report was forwarded to the NRC with the above reference letter during meetings and discussions held in February 1981 to obtain NRC approval to test above 70% power.

The final report is now submitted for your information and records.

Very truly yours,

/

il

0..

ee, Vice President Electric Production ORL/JCS:pa Y.

Enclosures 0

gt P 8201050173 811210 ev PDR ADOCK 05000267

P PDR

~