Responds to NUREG-0737 Items II.F.1 (4) Re Wide Range Containment Pressure monitor,II.K.3.22 Re Reactor Core Isolation Cooling Suction transfer,II.K.3.28 Re Automatic Depressurization Sys Accumulators & II.K.3.25
ML20039D455
Person / Time
Site: Peach Bottom  
Issue date: 12/29/1981
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-2.K.3.22, TASK-2.K.3.25, TASK-2.K.3.28, TASK-TM NUDOCS 8201040109
Download: ML20039D455 (9)


Text

___...

.O

.g PHILADELPHIA ELECTRIC COMPANY m

eo 23O1 M ARKET STREET 1

P.O. BOX 8699 P

g 1881 -1981 PHILADELPHIA PA.19101 E JAtl4 N $

SHIELDS L. DALTROFF g@

ata"c'Me",'EEEo Uh M

g N

w 4

D g

December 29, 1981 Re:

Docket Nos. 50-277 50-278 Mr. Darrell G.

Eis#nhut, Director Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Information Requested by NUREG G737,

" Clarification of TMI Action Plar; Requirements"

Dear Mr. Eisenhut:

This letter transmits information requested in NUREG 0737, items II.F.1 (4) (wide range containment pressure monitor),

II.K.3.22 (RCIC suction transfer), and II.K.3.28 (ADS accumulators).

The information relates to our plans for implementing several TMI related requirements.

Additionally, an informal request for information on II.K.3.25 from the NRC staff to the BWR Owner's Group is discussed.

NUREG 0737, item II.K.24 (Space Cooling for HPCI and RCIC) requestF an engineering evaluation by January 1, 1982.

This obligation was previously satisfied in Attachment C of a June 29, 1981 correspondence (S.

L.

Daltroff, Philadelphia Electric Company to D.

G.

Eisenhut, NRC).

NUREG 0737 requests the licensee to notify the NRC on January 1, 1982 of the status of the modification required by item II.F.1 (4) for wide range containment pressure monitor.

The containment pressure instrument modification has been completed on Peach Bottom Unit 3, and is scheduled to be completed on Unit 2 during the refueling outage scheduled to start February 20, 1982, pending NRC approval of our proposed schedule (letter dated September 4,

1981, S.

L.

Daltroff to D.

G. Eisenhut).

The new 8 2 01.0 4.0 ( og j

i' M

7 Mr. Darrell G.

Eisenhut, Director Page 2 instrument system was described in correspondence dated October 15, 1980 and December 22, 1530 (S. L. Daltroff to D.

G.

Eisenhut).

The information regarding items II.K.3.22, II.K.3.25, and II.K.3.28'is presented in the enclosures with this letter.

A request for extending the implementation date on items II.K.3.22 and II.K.3.28 was submitted in correspondence dated December 23, 1981, for Peach Bottom Unit No. 3 and in correspondence dated September 4, 1981, for Peach Bottom Unit No. 2 (S.

L.

Daltroff to D.

G. Eisenhut).

Should you have any questions regarding these matters, please do not hesitate to cor. tact us.

- < i very truly yours,

,.[/ d_ et C k--[ '.J

/

V

.a 9

s#

a 4

e

m9. --

..s_-

..4-

+

s n

s

A t j 'j%

Docket Noc. 50-277 50-278

- t 73

~__9 3

M N

s.

x.

'N k,,

Enclo..su_r_e.'.l

,i,

~

NUREG'0737 Item II.K~.3'.22' Reg' uirements g

~K5E55aEE5 NEEcT5v5E"5ET555E5E"C5EE~~

q Isolation Coolin.g System Suction 1

k i

NRC REQUIREMENTS:

1

~The reactor core dsol'ation coolingS(RCIC) system suction x

shall automatically:switchover from the condensate storage tank' to the suppression pool..when the. storage tank-level is low.

The licensee was requested to implement the design changes, and

~

" provide an evaluation that demonstrates the acceptability of the Mitgication by January 1, 1982.

4 I-'

(

s gy n

v i

p

"(

p

, ~

\\

. RESPONSE'\\ ' \\

.s 4

x h.

>y

.L

\\; P

/

M.

N$his 'rei;iufr.e= eat'has -been implementsd on Peach Bottom-

,Jlnit*3, anduis sqheduleds to-betcompTeted*for Unit.2 during the A y ~ '.'qqtuelingAutaget scheduled to' start.CFebruarj 20,_1982.

The 6

modifiestion' involves the addition *o M wo1 condensate tank level M instruyinQ1 oops, eaph consisting.of. a transmitter and trip unit, f and, changes t o the controls for the* suppression pool suction 4.'\\valv;%

y ^u e.

v' 5

i 4

[^~

RCIb suppression-pool suction valves?MO 13-39 and MO 13-41 will open*whenever the condensate storsge tank level decreases

~

t to fi'elfeet above the bottom of the tank.'; Thid-corresponds to v

10,006fgallons M water available in the tank.

This.value was chosen,.to.duplidYte the automatic transfer %f the high-pressure cool'antiinjectirin. DIPCI) # system from the condensate st.orage tank to : the suppre.ssion pool on low" condensate : storage' tank level.

Since this; change converts.a manually-_ opened, containment-isolitlori vpi+;e *(iM.4MO '13-41) Dto an automatically-opened e,~ g

@sf9

~

s r

,p

+

f/

6 r_ ?

%Q_

yg %4, </

7. 4.

m a

h

+t N<

Q'._ _

2 %c' y.

& y M,Y4

~ -f '

y,_

. ' % 4,

As N

y'%-(

)

F

  1. c,%

jf f

VMi t,.--

4;'h,..%,

Ql Q

-\\

g y' Q--

[,;

,yr

x. -

~

_L

.q g..

$?#

h ly 0

&$$5 3'; -

l c

Page Two

-y valve,<the valve control circuit will include a signal to close the valve whenever an RCIC isolation signal or a low RCIC steam line pressure signal is present.

These signals will also close valve MO 13-39.

The new instruments will be physically separated from condensate storage tank level switches LS 23-74-and 23-75, which r

are used for the HPCI system automatis transfer.

The same standpipe used for the HPCI instruments is being used for the new RCIC instruments since the probability of blockage of this two inch line is considered to be low.

A further consideration that allows the use of this standpipe is the use of common suction piping from the condensate storage tank to the HPCI and RCIC systems.

The operator will be informed of low condensate storage tank level, trip unit power failure or card out of file, and trip unit in calibration mode or grocs failure by modifications to the circuits of existing annunciators for these conditions.

The design of this modification is in accordance with all criteria applicable to the RCIC system, including physical and electrical independence, quality assurance, testability, operator indication, termination by deliberate operator action, and environmental qualification.

Figure 1 provides a sketch of the new RCIC suction control system.

1

?)'..),

4 e

w F

d

i LL

..I I

l i

I 4

LISL LISL i

OPEN ON CONDENSATE STORAGE M

170 171 TANK-LOW LOW LEVEL l

PROVIDED NO AUTOMATIC j

CLOSURE SIGNALS EXISTS.

I LT LT l

170 171 CONDENSATE STORAGE CLOSE WHEN l

p 61039 & 41 TANK FULL OPEN i

I g

I i

I i

CLOSE ON LOW STEAM LINE- - - - -

PRESSURE OR RCIC Qr---OPEN ON REACTOR AUTO ISOLATION SIGNAL LOW LEVEL

{

g i

PROVIDED MG39 & 41 l

NOT FULLY OPEN X7 M

,,s RuS i

A Qs/

RmS hu j

i i

4 r--6--1 SUPPRESSION POOL.

vu uv o

RCIC V

C 10!!

RCIC SUCTION CONTROL SYSTEM FIGURE 1

Docket Nos. 50-277 50-278 E,n,clo,s,u,r,p_2 NUREG 0737, Item' II'.K'.3'. 28' Requirement:

~~~fdEffy ~QudffffdEtfdd~df ~AtItdmEtfd~~~

Depressurization Accumulators NRC REQUIREMENTS The nitrogen accumulators for the automatic depressurization system (ADS) valves'shall have sufficient capacity to cycle the ADS valves open five times at' design pressures.

The accumulators are also required to withstand a hostile environment and still perform their-function for 100 days following an' accident.

The licensee was requested to-provide an:

evaluation that demonstrates the acceptability of the modification by January 1, 1982.

RESPONSE

A long-term safety grade pneumatic supply will be' provided for the ADS valves to comply with the requirements of NUREG 0737, Item II.K.3.28.

The modification is expected to be complete on Peach Bottom Unit 3 by April 30, 1982, and on Unit 2 during the-refueling' outage scheduled to start February 20, 1982.

A split ring header will be installed inside containment with three (3) ADS valves connected to one section of the split header and the remaining two (2) ADS vclves connected to'the other section of the split header.

The source of safety-grade pneumatic pressure will.be a series of nitrogen cylinders located within the reactor building with a connection provided outside the reactor building for the installation of additional bottles, as required.

v w

n

Page Two Spare primary containment penetrations, two for each unit, will be modified to provide a permanent means of connection to each section of the new safety-grade pneumatic supply headers within each drywell.

Containment isolation will be provided for each new instrument gas supply line by a check valve and an automatic isolation valve outside primary containment.

The outer automatic valve ( SV-813 0

t, B, SV-9130 A,B) will be manually controlled from the control room and will automatically close if containment pressure exceeds pneumatic supply pressure or if gas flow becomes excessively high.

In order to provide the logic for containment isolation, a pressure transmitter will be installed in each pneumatic supply and'its signal compared to that of an existing drywell pressure transmitter.

Flow transmitters will be installed in the supply piping to monitor for excessive flow.

The automatic isolation valves associated with each ring header will be assigned to different electrical divisions.

Figure 2 provides a sketch of the new ADS accumulator nitrogen supply system.

sc-thInht.on Wlve. Ibn 1

v. $

[

y

  1. 3 ix; j

~

i

.i.

t l

(sv-aisoAsy-9130A) i i,

1%cb NUin0 8

w r* ?2;P%

3-345GGJ Ed.gvO.hTd,,g f{mm,Jg,

T

_.. 4, d m

O I-a d*

-G:#4'O

,H

, z,o N

.y

.iif)

^^^

ev.a.,,n;,.4y y

4

^

135'd' w

8 8

h >e mh I.,c., v. h F<

x r

(sv-8: sors)

SV-91308 8.oc % B wiJin 2 2 25E A,

Y'>2~YsGA)~

~ #

c *.% rs. 3

'A-s bsm M

s N *1016 El m o-Eiks$("N Suh 2

2 2 256C g 3*1*254 C J Accumu % c AUTOMATIC IEPRESSURIZATION ACCUMULATOR i

NITROGEN SUPPLY FIGURE 2

+

9 v

..----y.m..-

--,r,..

m - _,

r

- ~. -

/.

Docket Nos.-50-277 50-278 E,nc1,o,s,uge,'_3,,

NUREG' 0737'{ Them' II'.K'.3'. 2 5 Ef fect of ~C6Es~6f ~A.t C5EEEtfdg ~6uffent Power -

on Recirculatioa Pump. Seals Informal discussions between the NRC' staff and the BWR Owner's Group indicted that-the Owner's Group position on Item II.K.3.25, " Effects of Loss of Alternating Current Power on Recirculating Pump Seals", was not-adequate. -The staff's concern

~

centered on the~ fact thatLthe test-data referenced in-the Owner's Group. Report indicated a maximum pump seal leakage?of 70 gpm during a total' loss of seal cooling.

In response toeth'e NRC: concerns, the.BWR Owner's Group directed General Electric to transmit additional test' data to. the NRC which demonstrates that the~ seal leakage.is.much less than 70 gpm-(GE letter G-TMI-1-96 dated September 25, 1981).

Subsequent discussions with.the staff indicate that the transmitted data-

~

will be. sufficient.for their use in closingiout this task.

As noted in--the GE letter, each utility should confirm the' applicability of the supplemental information to their plant.

We have reviewed the information -contained Lin 'the - GE letter, conclude that it is applicable to-the Peach Bottom design, and Econsider it' appropriate for reference as part'of the Peach Bottom-

~

submittal (letter dated: June-29, 1981,;S.

L~.

Daltroff to D.

G.

Eisenhut).

l