e LOUISIANA f 242 ouAnonoE S1nar POWE R & L1G HT/ P O BOX SOO8. NEW ORLEANS LOUIS!ANA 70174. (504) 366-2345
$$El$dYS December 21, 1981 G D McLENDON Senior Vice Prescent W3K81-0458 Q-3-A33
^?
M A
G 9:
Mr. John T. Collins, Regional Admi.nistrator, Region IV b
RECEnfED U. S. Nuclear Regulatory Commission 2
9 DEc3021 > :
Office of Inspection and Enforcement g
611 Ryan plaza Drive, Suite 1000 gp aggagemeut '0 Arlington, Texas 76012 mmER f 8 1,
- /
SUBJECT:
Waterford SES Unit 3 Docket No. 50-382 Interim Report of Significant Construction Deficiency No. 35
" Material Properties of Tube Track and Welded Fittings"
Reference:
LP&L Letter W3K81-0402 to USNRC dated November 4, 1981
Dear Mr. Collins:
In the referenced letter, LP&L notified the NRC that a final report of Significant Construction Deficiency No. 35 would be submitted by December 15, 1981.
As of this date, the J. C. White Company has not fully responded to the Ebasco New York Quality Assurance Facility Audit. This should be resolved in the very near future.
In addition to the original material problem identified by Ebasco, another item of concern has been identified. This item relates to the possibility of tube track configurations not conforming to instrumentation installation details.
Evaluation of the Wyle Lab seismic qualification report is to be performed by Ebasco Engineering.
Due to the added delay caused by this engineering evaluation, a final report will be submitted to the NRC by March 15, 1982.
[F [
8112310520 811221 PDR ADOCK 05000382 V(gg S
.)
e Mr. John T. Collins Regional Administrator, Regin IV If you have any questions, please let us know.
Very truly yours A,d.h1'f,
,G. D. McLendon Senior Vice President GDMcL:LLB:ned cc:
- 1) Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
- 2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20535
-.