Forwards QA Program Insp Rept 99900033/81-02 on 810921-25 & Notice of Nonconformance
ML20039D224
Person / Time
Issue date: 12/11/1981
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Bakos F
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20039D225 List:
References
REF-QA-99900033 NUDOCS 8112310438
Download: ML20039D224 (3)


Text

--

+

gcO D In Reply Refer To:

RIV Docket No. 99900033/81-02 e

n, e

RECEWED A

Westinghouse Electric Corporation Electro-Mechanical Division DEC3 0 M " C ATTN: Mr. F. R. Bakos E-General Manager a s,m* 885casam m

Cheswick Avenue

  • C Cheswick,PA 15204

'/

g Gentlement J

'This riifers to the QA program inspection conducted by Mr. W. M. McNeill of this f > office on' September 21-25,1981, of your facili1;y at Cheswick, Pennsylvania, J

['associatedskith the fabrication of pumps, control rod drives, and valves, and 4

t'o the discussion of our findings with you and members of your staff at the

', conclusion of theinspection.

AA i

' This inspection was made as a result of the issuance of 10 CFR Part 50.55(e) esports by Florida Power And Light Camp (St. Lucie, Unit 2) and SNUPPS (Wolf-creek and callaway, Units 1 and 2 concerning an identified potential 4 -- -

ifsilure of 3:. inch thru 18-inch gate valves to close under flew conditions at dximum pmssure differential. This inspection also was made to confirm that, in the areac inspected, your QA program is being effectively implemented. The

< inspection effort is not designed to assure that unique quality requirements 4mposed by a.:cusEomer are being achieved; nor to assure that a specific

a product, componer.t.. or service provided by you to your customers is of accep' table quality ibility for the quality of specific products, components, As you know, the NRC requires each of its licensees to assune' full respons s

i s or services procured from others. You should, themfore, not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his r

agents nor from taking effective corrective action in response to their

' ~ } findings.

Areas examined and our findings are discussed in the enclosed mport. Within

.p these areas, the inspection consisted of an examination of procedures and stepresentative records, interviews with personnel, and observations by the ynspector.

L3

~

s e

n

\\

t '^;,

8112310438 8112i1 PDR GA997 ENVWEST v

99900033 PDR

' l 1

1 s

3

...CS b.

..U.B....C[

.4.S.s........

'8M8.E..

N>

UPot ovs

'JEGjrgliar; JTColli WMMcNeill/ rih

""T27 781 -( 7:h27 SURNAME 87.

12rgyal" "12 87""

DATE) 4

......... 4

.. ~

.~.....

~ ~. ~ ~.

NNY." 3l8p8 ) ""

2*

OFFICIAL RECORD COPY

f Westinghouse Electric Corporation J i

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. The specific findings and mferences to the pertinent requirements are identified in the enclosure to this letter.

Please provide us within 30 days from the date of this letter a written state-ment containing: (1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the date your cormctive actions and preventive measums were or will be completed. Consideration may be given to extending your response time for good cause shown.

The msponse requested by this letter is not subject to the clearance pro-cedures of the Office of Management and Budget as mquired by the Paperwork Reduction Act of 1980, PL 96-511.

l In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this. office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) sub-mit'within 25 days from the date of this letter a written application to this office to withhold such information.

If your mceipt of this letter has been delayed such that less than 7 days are available for your review, please notify this office promptly so that a new due date any be established.

Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this ngard within the specified periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection,we will be pleased to discuss them with you.

Sincerely, I

Uldis Potapovs. Chief Vendor Inspection Branch i

Enclosures:

1.

Appendix A - Notice of Nonconformance t

"=-Mh " - I vti= 5p. ; M. 5 -00033/8 0?

-co.... 3... A pendix, C,,,, Inspect 1,on, Data She(ts,,(1,0,,pagesy),,,,

P "d *

.... - ~ ~ - -

. une ronu m oo..o sac" "

OFFICIAL RECORD COPY

Westinghouse Electric Corporation.

bec:

Chief. V&SPB, DR&RRI HQS (Reinmuth)

IE Files AE00 MSS QAB NRC:PDR Reg. Administrators I, II, III, V JEGagliardo,RIV ASE NBB&PVI 4

t f

E t

cmcEp 4

. ounnaur)

DATEk

( une ron si n o..o, unc- 02' OFFICIAL RECORD COPY -