ML20039D006
| ML20039D006 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 12/22/1981 |
| From: | Baer R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20039A116 | List: |
| References | |
| REF-SSINS-6820 IEB-80-11, NUDOCS 8112310208 | |
| Download: ML20039D006 (1) | |
Text
.po urg jo, UNITED STATES y
g NUCLEAR REGULATORY COMMISSION g
- y WASHINGTON, D. C. 20555 SSINS #6820 DEC ? ' 1981 MEMORANDUM FOR
R. L. Spessard, Director, Division of Resident and Project Inspection, Region III FROM:
R. L. Baer, Chief, Reactor Engineering Branch, Division of Resident and Regional Reactor Inspection, IE
SUBJECT:
TECHNICAL REVIEW 0F RESPONSES, IE BULLETIN 80-11, MASONRY WALL DESIGN In ray memorandum of September 22, 1981, I indicated that the Structural Engineering Branch (SEB) has retained Franklin Research Center (FRC) to perform the technical evaluation of licensees' responses to IE Bulletin 80-11. Enclosed for your information is one copy each of the Interim Technical Evaluation Reports (ITERs) issued by FRC for the following plant:
l Interim Technical Evaluation Report for Duane Arnold Energy Center Please note that the additional information required from the licensees will be obtained by the SEB, NRR.
If you have any questions, please contact Prafull Kakkad of my staff.
t,cd
[ Mt6W Re ert L. Baer, Chief Reactor Engineering Branch Division of Resident and Regional Reactor Inspection, IEnh
Enclosure:
As stated sO
- 3..
i cc: w/o enclosure h, i u N
DECS 01931" h Reg dd nistrators,
/
A. W. Dromerick, IE
'n t,
E. J. Gallagher, IE
'c
u' P. Kakkad, IE
~
,O' D. Jeng, NRR
\\'r i
1 K. C. Leu, NRR CONTACT:
P. B. Kakkad, IE 49-24805 8112310208 811222 DRADOCK05000g C 24 1981