ML20039C887

From kanterella
Jump to navigation Jump to search
Advises of Costs for Review of CP Application.Invoice for Balance Due Will Be Issued
ML20039C887
Person / Time
Site: 05000376
Issue date: 12/14/1981
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Betancourt R
PUERTO RICO, COMMONWEALTH OF
References
NUDOCS 8112310063
Download: ML20039C887 (1)


Text

y DISTRIBUTION:

DEC f 4 fca Docket File /

PDR LPDR Docket ilo. 50-376 License Fee File Actual Manpower File RFonner, OELD Puerto Rico Water Resources Authority WOMiller, LFMB ATTil: Mr. R. Betancourt, Esq.

CJHolloway, LFMB GPO Box 4267 KLKohler, LFMB San Juan, Puerto Rico 00936 RMDiggs', LFMB LFMB R/F (2)

Gentlemen:

As indicated in our November 18, 1981 letter to Mr. Maurice Axelrad, of Lowenstein, tiewman, Reis and Axelrad, we have accumulated the manpower and contractual services costs expended for the review of the llorth Coast withdrawn application.

Under 10 CFR Part 170, it is Connission practice to recover review costs using the procedures of Footnote 3 to 10 CFR 170.21 when the review of the project is complete. Tne review of this project was completed ~as of February 18, 1931 the date the Atomic Safety and Licensing Board Panel dismissed the proceeding.

Accordingly, we have deter:ained the actual expenditures incurred for professional manpower and contractual support services from September 27, 197',, the date the application was amended to include the t' orth Coast (Islote) site to February 18, i

1981, tne date the Atomic Safety and Licensing Board Panel dismissed the proceedings. Actual cost incurred for the review was $C91,573.U Under the Conmission's regulations, we limit the charge for review to tnat which would be applied to tne construction permit under 10 CFR 170.21 A.1, that is $891,573.

$125,000 has already been paid as an application fee. The balance due for the review of the construction permit application is as follows:

Actual Cost

$891,b/3 Less Application fee -125.000 iI Balance Due liRC:

$766,573 Ue have notified the ARC Office of tne Controller to issue an invoice to PRWRA to cover the Conmission's review costs.

Sincerely, OMv1 %M;,

w aw

\\.

/

8112310063 e11214 William 0. Miller, Chief b[ O {6

-i g Q [/3 PDR ADOCK 05000 h.

License Fee Management 3ran g

.g.

Office of Administration

.t

-4 g

J cc: Mr. Maurice Axelrad tN U

[

df

)hf,N 7p m r [

Lowenstein,liewman, Reis and Axelrad A

/

1025 Connecticut Avenue, fl.W.

Wasnington, DC,20036 x[

/

L.FyBg,ADM,.,

,.LFMB ADf,1,

..LFMB,hdM

,,0%D,g,k o,,,cq sum KLR,u..hl er : vml

,,C,

,l oway,

,,W,0,M,i,,{,1 e r,,,,ggggnet,,

12/..ps../.81 12/..j..[./.81 12/...j.y_81 12/..(\\../81 oy nac ronu aia tio-aoi nacu o2o OFFICIAL RECORD COPY us.m o,_.m.a