Forwards Revision 1 of General Project Design Criteria for Recovery Facilities.Criteria Will Serve as Basis for Developing Majority of Sys & Specific Design Criteria Needed Through Course of Recovery
ML20039C722
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/22/1981
From: J. J. Barton
METROPOLITAN EDISON CO.
To: Barrett L
Office of Nuclear Reactor Regulation
Shared Package
ML20039C723 List:
References
LL2-81-0285, LL2-81-285, NUDOCS 8112300079
Download: ML20039C722 (1)


Text

__

RECE!Vgg

.g Metropolitan Edison Company 2

DEC2334 :.

Post Office Box 480 II Mukiletown, Pennsylvania 17057 L -

Q-. 49-Writer's Ovect D.al Number h

h December 22, 1981 LL2-81-0285

E arn sc&

O to

n:t U4

-< c o

n6 TMI Program Office m

E Attn:

Mr. Lake H. Barrett, Deputy Program Director U. S. Nuclear Regulatory Commission to 8

c/o Three Mile Island Nuclear Station a

y Middletown, Pennsylvania 17057 Vi

~

Dear Sir:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 General Project Design Criteria Attached is a copy of Revision 1 of our General Project Design Criteria (GPDC) for recovery facilities.

This revision supercedes Revision 0 that was transmitted to yua by our letter, LL2-81-0140, dated May 29.

1980. Your comments on Revision 0 transmitted to us via NPC/TMI-81-O',7 dated August 24, 1981 af fe.:ted Table 4.3 of the Mechanical section. These comments were received at the same time this revision was being issued, and are not incorporated into this revision. The disposition of these comments have been sent to you in our letter, LL2-81-0245, dated November 2, 1981 and changes to be incorporated will be included in Revision 2.

These general criteria will serve as a basis for developing the majority of system and facility specific design criteria that will be needed through the course of recovery. As we have previously discussed, we will be submitting system and facility specific design criteria to you for approval prior to developing more detailed designs.

The GPDC is provided to be used in conjunction with each facility design criteria when reviewing these documents.

In that this document reflects our general design approach, your review and approval of the General Section (Design Criteria 13587-2-L01-100) is requested. This will preclude our having to address these general criteria repetitiously with each new submittal.

You may also wish to review the remaining sections of the GPDC, and we will address any comments you have that may have generic applicability. Comments applicable only to any specific facility or system, however, should be handled as part of the NRC review and approval of that specific submittal.

Si

.e qly, s! " 3 0 qty y

?

/

/

l Q\\

f,/

?

f(Q 1

4 A P on t

gg Ac i > Director, TMI-2 l

JJB:JJB:djb Attachment cc:

Dr. B. J. Snyder, Program Director, TMI ogram Office 9112300079 811222

.sson Commny is a Memner at the G,nerM Pohac UtN Sgten PDR ADOCK 05000320 p

PDR l