Text
- -
9 b~3W M
G3 Portland ( encral Electric Company December 17, 1981 Trojan Nuclear Plant CPY-1013-819 p;
g n 'a c
P.O. Box 439 m
g M
Rainier, Oregon 97048 N
(503)556-3713 U
O
~
r.:
G
..a EOINEO Mr. R. H. Engelken, Director E
DEC33 g4 *HI US Nuclear Regulatory Corrnission Region V - Suite 260 1450 Maria Lane h
p'
~
Walnut Creek, California 94596 Itc
Dear Sir:
y l
Pursuant to STS paragraph 3.7.9.a the following information is provided:
While performing an IC-month inspection of penetration fire barriers (Trojan MP-12-13) it was discovered that some of the penetrations were either marginal, questionable, or not functional as 3-hour barriers. Upon receiving this information we followed the action statement as required.
Smoke detectors were verified operable and a roving fire watch was required to inspect all affected areas hourly.
This special report is being written to the commission pursuant to specifi-cation 6.9.2 outlining:
1.
action taken 2.
cause 3.
plans and schedule for restoring the fire barriers to functional status.
ACTION TAKEN:
Smoke detectors were ver.fied operable by the Operations group and a fire patrol was initiated to :nspect the affected areas horrly.
CAUSE:
Breaches were caused by the following:
1.
New penetrations not completed 2.
Damage by workmen working in area 3.
Grouting cracked or chipped 4.
Removal of existing conduit or cable from a 3-hour fire rated wall NOTE: Many of the penetrations had nicks and gouges less than 1/4" long.
8112290291 811217' g, g PDR ADOCK 05000344 S
-o Dece ber 17, 1791 CPY-1013-81 Page Two PLASS AND SCHEDULF.
As of this writ ng all penetrations have been repaired and are declared operable.
Sincerely, C. P. Yundt General Manager CPY/RPB:ga c: