ML20039B941

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Plant Emergency Procedures Manual,Including Procedures EP-8, Operation of Emergency Operations Facility, & EPP-8.1, Emergency Operations Director
ML20039B941
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 12/14/1981
From: Yundt C
PORTLAND GENERAL ELECTRIC CO.
To: Clark R
Office of Nuclear Reactor Regulation
Shared Package
ML20039B938 List:
References
CPY-994-81, NUDOCS 8112280079
Download: ML20039B941 (5)


Text

_ _.

mf iFGE W j%

Por:!and General Electric Company Troian Nu,! car Plant P O. Box 439 Rainier. Dreton 9704S December 14, 1981 (503) 556-3713 CPY-994-81 42 9

Director of Nuclear Reactor Regulations pg, EI'/Q D,

ATTN:

Mr. Robert A. Clark, Chief

  • O.

Operating Reactors

' 35 e O{g1 IIS$f,E '

Branch No. 3 Division of Licensing 7Qrg g 954 US Nuclear Regulatory Commission r4

\\

'Jashington, DC 20555 g

M sd

~~

Dear Mr. Clark:

SUBJECT:

TROJAN NtiCLEAR PLANT EMERGENCY PROCEDURES (COPIES 54-60, 62, and 63)

Enclosed is the second mailing of Transmittal #81-002 to the Trojan Nuclear Plant Emergency Procedures manual, to replace the transmittal of November 12, 1981 damaged in transit.

Please insert the changes as directed to update your manuals.

(Note that the total page count of the procedu.res includes maps and figures.)

Sincerely, C. P. Yundt General Manager CPY/

mae Enclosures c:

C. A. Olmstead tw/o Enc)

R. P. Barkhurst (w/o Enc)

I D. J. Broehl (w/o Enc)

G. A. Zic=erman (w/o Enc)

B. D. 'Jithers (w/o Enc)

File 91.1 N

f fu fR $V

)k

~ 112280079 811222 '

8 PDR ADOCK 05000344 F

PDR

.. ~..

.__w.

-n,

~~.+.-

m-

-o ae ew,e

-e-

.=e -w

~

REGULATORY INFCRMATIOW OISTRIBUTICN SYSTEM (FINS)

ACCESSION NdR: 5412;C00 2

00C.DATE: 01/12/14 NOTARIZEC: NC DOCKET #

FACIL:50-344 Trojan Nuclear Plant, Portlana General Electric 05000344 AUTM. NAPE AUTHUR AFFILIATION YLNCT,C.P.

Portlano General Electric Co.

/,

RECIP.NAME RECIPIENT AFFILIATION CLAAK,R.A.

Operating Reactors Branch 3

SUBJECT:

Forwarcs Central Files versien of revisee plant operatlns manual raciological emergency rescense plan implementing erecedures,irclucing Procedures EP-8 re operating of emergency coerations facility. Receipt fores encl.

w SihRS DISTRIBUTION CODE: X005S COPIES RECEIVED:LTR _bENCL).,

SIZE:.,d.,fdh.h TITLE: Energ Plan (CF Avail)

NCTES:

RECIPIENT COPIES RECIPIENT CCPIES ID CODE /NARE LTTR ENCL 10 C00E/NANE LTTR ENCL

,ACTICA:

ORd s3 BC 1

0 TRAPPELL,C.

01 1

1 INTERNAL: fnsidkQ 02 1

1 FEYA-REP DIV 09 1

1 IE' 06 2

1 IE/DEP OIR 1

0 IE/CEP/EPCB Oo 1

1 IE/0EP/EPle 03 3

3 NRR/OSI/RAB 1

0 REG FILES 07 1

1 4

?

"f -

TOTAL NUMBER OF, COPIES HEGUIREC: LTTR 13 ENCL 9

~

TROJAN NUCLEAR PLANT TRANSMITTAL NO.81-002 Date 12/11/81 Copy No. 54-60 6 62-63 Page 1 of 4 TO:

Director of Nuclear Reactor Regulation ATTN: Mr. Robert A. Clark Branch No. 3 Divisien of Licensing US Nuclear Regulatory Commission Washingcon, DC 20555 FROM:

A. M. Puzey

SUBJECT:

Troian Nuclear Plant Emertencv Procedures Enclosed are changes to your copy of Volume 4. Section 3, of the Trojan Plant Operating Manual. These pages are to be inserted in your==i=1 in accordance wi h the instructions below.

Please acknowledge receipt by completing the lower portion of this trans-

~

i nitcal and return it to the address inel4cated.

Enclosure (s) ws..wcucNS POR FILING a

Remove Insert Procedure /Page Revision Procedure /Page Revision EP-8 1-20 2

EP-8 1-20 3

EP-8 (Retain Figure 8.5)

EP-8 Figure 8.6 EP-8 Figure 8.6 (8/81)

EP-8-1:

1-2 0

EP-8.1 1-2 1

EP-8.2 1 of 1 0

EP-8.2 1-2 1

EP-8.3 1 of 1 0 (Deleted)

EP-8.4 1 of 1 0

EP-8.4 1 of 1 1

EP-8.5 1 of 1 0

EP-8.5 1 of 1 1

EP-8.6 1 of 1 0

EP-8. 6 1 of 1 1

EP-8.7 1 of 1 0

EP-8.7 1 of 1 1

EP-8.8 1-2 0

EP-8.8 1-2 1

EP-8.9 1 of 1 0 (Deleted)

Copy No. u e;0 & 62-63 Tr=" =1 teal No.81-002 ACKNOWLEDGMENT Page 1 of 4 I hereby acknowledge receipt of the r-hanges to the Trojan Plant Operating Manual Emergency Procedures, Volume 4. Section 3.

Signature of Copy Holder Data Return To:

Office Supervisor Trojan Nuclear Plant P. O. 3ox 429 vn4miar. CR 97048

--m----

nw.,

m.

-,,,,~-,-,,,n

-w-

~~

rn- - - -

e

--,--w a

TROJAN NUCL:_AR Pl. ANT TRANSMITTAL NO. 81-no2 Data 12/11/81 Copy No. 54-60 & 62-63 Page 2 of 4 0:

Director of Nuclear Reactor Regulation ATTN; Mr. Robert A. Clark Branch No. 3 Division of Licensing US Nuclear Regulatory Conmission Washington, DC 20555 YROM:

A. M. Puzey S&'IC:':

Troian Nuclear Plant Easrxency Procedures Enclosed are changes to your copy of Volume 4. Section 3, of the Trojan Plant Operating Mamam1 These pages are to be inserted in your manual in accordance with the instructions below.

Please acknowledge receipt by completing the lower portion of this trans-

=1ttal and retnrn it to the address indirated.

Inclosure (s)

I E.wcaaONS FOR TILING Remove Insert Precedure/?ase Revision Proceeure/Page Revision EP-8.10 1 of 1 0 (Deleted)

EP-8.ll 1 of 1 0

EP-8.ll 1-3 1

EP-8.12 1 of 1 1

EP-8.12 1 of 1 2

EP-8.13 1 of 1 0

EP-8.13 1 of 1 1

EP-8.14 1 of 1 0

EP-8.14 1 of 1 1

EP-8.15 1 of 1 0

EP-8.15 1 of 1 1

EP-8.16 1 of 1 0

EP-8.16 1 of 1 1

EP-8.17 1 of 1 0

EP-8.17 1 of 1 1

EP-8.18 1-2 0

EP-8.18 1 of 1 1

EP-8.19 1-2 0

EP-8.19 1-8 1

EP-8.20 1-3 0

Tr= m ittal No. gi_nne Copv No. et_cn t 62-63 Page 2 of 4 I hereby acknowledge receipt of the changes to the Trojan P'lant Operating Man 1al Emergency Procedures, Voluna 4, Section 3.

Signatura of Copy Holder Data Return To:

Offica Supervisor Trojan Nuclear Plant P. O. Box 429 9mi,4ar, OR 97048

TROJAN NllCLEAR PLANT TRANSMITTAL NO.81-002 Data 12/11/81 Copy No. 54-60 & 62-63 Page 3 of 4 TO:

Director of Nuclear Reactor Regulation ATTN; Mr. Robert A. Clark Branch No. 3 Division of Licensing US Nuclear Regulatory Comnission Washington, DC 20555 FROM:

A. 3. Puzay SULIZCT:

Troian Nuclear ?lant Emerzency Procedures Inclosed are changas to your copy of Voluna 4, Section 3, of cha Trojan

?lant Operacing Manual. These pages are to ha inserted in your manual in accordance with esa inst =ue:1ons below.

Plamas acznowledge receipt by complacing the lower po d on of this trans-ni: a1 and return it to the address indicated.

Inclosura(s) asm.acNS TUR FMG Remove Insert

?rocedura/? age Revision Procacura/Pasa Rae.sion EP-10.1 1-18 0 (Deleted)

EP-10.2 1-2 2 (Deleted)

EP-10.3 1-2 2 (Deleted)

EP-10.4 1-2 1 (Deleted) l l

EP-10.5 1 of 1 1 (Deleted)

EP-12 1-18 1

EP-12 1-15 2

EP-12 (Retain Figure 12.1)

EP-12 Figure 12.2 EP-12 Figure 12.2 (8/81)

EP-12 Figure 12.3 EP-12 Figure 12.3 2 (pg. 18 of 18)

EP-12 Figure 12.4 (Deleted) l EP-12 Figure 12.5 (Deleted) l EP-23.1 1-31 0 (Deleted)

T *"* :t1L No 81-007 Copy No. u An A 62-63 ACZ30E*N Page 3 of 4 hereby ack=owledge receipt of cha changas to the Trojan 51anc Operating Mammi. Emergency Proceduras, Voluma 4. Section 3.

Signacura of Copy Holdar Dace Return To:

Offica Supare.sor Trojan Nuclear Plant

?

0. Box 429

TROJAN NUCLEAR PLANT TRANSMITTAL NO.81-002 Date 12/11/81 Copy No. 54-60 & 62-63 Pe;;c 4 of 4 TO:

Director of Nuclear Reactor Regulation ATTN; Mr. Rob u A. Clark Branch No. 3 Division of Licensing US Nuclear Regulatory Commission TJashington, DC 20555 FROM:

A. M. Puzey SU3 JECT:

Treian Nuclear Plant Emerzen n Procedures Enclosed are changes to your copy of Volume 4, Section 3, of the Trojan Plant Operating M ->=1 These pages are to be inserted in your

===1 in accordance with the instructions below.

Please acknowledge receipt by completing the lower par-ad of this tranp-cittal and return it to the address indicated.

Enciosure(s)

INSTRUCTIONS FOR FJG Remove Insert Procedure /Page Revision Procedure /Page Revision EP-30 1-31 0

EP-30 Figure 30~1 Amend. 1 (8/81) l EP-30 Figure 30-2 Amend. 1 (8/81)

=

(Two sided sheet)

EP-Table of Contents EP-Table of Contents (11/17/81)

NOTE 1.

Maps do not have page numbers but are included in total page count.

2.

Retain Figure 8.5 of EP-8; and Figure 12.1 of EP-12.

l 3.

Current Table of Contents is furnished as indicated above.

Copy No. 54-60 & 62-63 Transmiccal No. 81- 002 G OUT.EDCMENT Page 4 of 4 I hereby acknowledge receipt of the changes to the Trojan Plant Operating Manual Emergency Procedures, Volume 4, Section 3.

1 Signature of Copy Holder Date

/

Retur: To:

Office Supervisor Trojan Nuclear Plant P. O. Box 439 d

.