ML20039B827
| ML20039B827 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/27/1981 |
| From: | ARKANSAS POWER & LIGHT CO. |
| To: | NRC |
| Shared Package | |
| ML20039B825 | List: |
| References | |
| NUDOCS 8112230623 | |
| Download: ML20039B827 (2) | |
Text
.
7 ARKANSAS POWER & LIGHT COMPANY c
3 ia ^
Arkansas Nuclear One 1"%6
' T".ANS!GTTAL l FCRM NO.
1013.02H 2
Arkansas Nuclear One Russellville, Arkansas Date Acril 27, 1981 g,e,f
~
H,$
'j
\\
YA Ne.
1,.
N
~
MEMOR N g) y,;4y gjgg1,pg
.~ l
.TO:
HOLDERS OF SERIES 1903 _
EMERGENCY PLAN ihkmes.,ma-m p/
N PROCEDURES 1903.01 -- 1903.XX
~2, e
~
FROM:
ANO DOCOENT CONTR01 N
SUBJECT:
ANO MASTER ?LANT M.GUAL
~
The procedures, evisions, permanent changes, and/or te=porary changes listed
/
below have been /
/should be
/placed in your set of the plant msnual.
PROCEDURE 4 REV. #
PERM. CHG. #
TEMP. CHG.J PROCEDURE TITLE 1903.01 1
Organization & Use 'of the Emergency Plan Implementing Pr,ocedures 1903.23 1
Personnel Emergency i
l l
I l
COPIE'; TO:
w/o att: Word Processing 59-Admin. Copy 2nd Floor i
om w/att: 1-Control' Room - Unit 1 65-Emer. Kit - Local Office 3-Control Room - Unit 2 66-ECC
>N 6-Ops./Maint. F i.
78-ANO Library 88 14-Plant Admin. Mgr.
81-Burne Supversor l
Q 17-Human Resources Supv.
S2-Guardhouse I
u 18-Emp./Coun. Supv.
84-Emergency Planning Coord.
P l@
i Om 19-Trng./Coun. Supv.
88-Auxiliary Operators i
g; 20-Trng. Coord. Ops.
92-Trng. - NSC ou 25-Security Coordinator 93-Ops. Tech.
MQ 27-Eng./ Tech. Supp. Mgr.
100-NRC Region 108-NRC Washington 20 ;
28-Technical Anal. Supt.
101-NRC Region 109-NRC Washi:.gton 29-Health Physics Supv.
102-NRC Region 110-NRC Washington 32-Asst. Health Pbysics Supv.
M3-NRCWashington ill-NRC Washington 48-Planning & Seneduling 104-NRC Washiagton ll2-NRC Washingter 49-Eser. Kit 1 - Control Room 105-NRC Washington (Info Only l
50-E=er. Kit 2 - 1st Floor 106-NRC Washiageon 19-Trng. Ccun.Supv.
SI-Emer. Kit 3 - ECC 107-NRC Washington (Vandergrift)
Updated _
C '" C ',' - d i n '
r w
v j g ARKANSAS POWER & LIGHT COMPANY rc,t ra Arkansas Nuclear One n
c
' TRANSMITTAL _
l FCRM NO.
1013.02H N
l I
Arkansas Nuclear One Russellville, Arkansas Date Anril 27, 1981
~
MEMORANEUM
.TO:
HOLDERS OF SERIES 1903 -
EMERGENCY PLAN PROCEDURES 1903.01 -- 1903.XX
~
FROM:
ANO DOCUMENT CONTROL
SUBJECT:
ANO MASTER PLANT MANUAL
~
The procedurn, rerisions, permanent changes, and/or temporary changes listed
/
below have been /
/should be Q/placed in your set of the plant manual.
PROCEDURE #
REV. #
PERM. CHG. #
TEMP. CHG. #
PROCEDURE TITLE 1903.01 1
Organization & Use 'f the o
Emergency Plan Implementing i.
~
Pr,ocedures 1903.23 1
Personnel E=ergency COPIES TO:
w/o att: Word Processing
.T9-Admin. Copy 2nd Floor t
w/att: 1-Control' Room - Unit 1 65-Emer. Kit - Local Office 3-Control Roco - Unit 2 66-ECC 6-Ops./Maint. Mgrs.
78-ANO Library 14-Plant Admin. Mgr.
81-Burns Supversor 17-Human Resources Supv.
82-Guardhouse 18-Emp./Coun. Supv.
84-Emergency Planning Coord.
19-Trng./Coun. Supv.
88-Auxiliary Operators 20-Trng. Coord. Ops, 92-Trng. - NSC 25-Security Coordinator 93-Ops. Tech.
27-Eng./ Tech. Supp. Mgr.
100-NRC Region 108-NRC Washington 28-Technical Anal. Supt.
101-NRC Region 109-TtC Wash!ngton 29-Health Physics Supv.
102 ':Kr. Region 110-NRC Washington 32-Asst. Health Physics Supv.
103-h2'; Washington ill-NRC Washington 48-Planning & Scheduling 104-NRC Washington gl2-NRCWashington 49-Emer. Kit 1 - Control Room 105-NRC Washington (Info Only 50-Emer. Kit 2 - 1st Floor 106-NRC Washington 19-Trng. Coun.Supv.
SI-Emer. Kit 3 - ECC 107-NRC Washington (Vandergrift)
Updated