E CDFl-St-CC-Cf' glQ h
DEC 101981 (412) 456 6000
- r;a-32kS. 43 82 15219 N
CO United States Nuclear Regulatory Commission
[
Region I R
s-C$fpp* '
\\-
631 Park' Avenue 9
pg King of Prussia, PA 19405 ATTENTION:
MR. BOYCE II. GRIER, DIRECTOR f, ( '
b*
,. j/
SUBJECT:
Beaver Valley Power St.ation - tinit No.
Docket No. 50-412
'w..--.
Seismic Calculations for Category I Structutes Significant Deficiency Report No. 80-07 Gentlemen:
Pursuant to the requirements of 10CFR50.55(e), the " Final Report on Seismic Calculations for Category I structures" is attached for your review.
If you have any questions concerning this report, we are available to meet with Nuclear Regulatory Commission personnel at their convenience.
DUQUESNE LIGI!T COM'ANY By_
EUJ. Woolever VICE PRESIDENT Enclosure cc:
Mr. V. Stello, Director (15)
Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 l b 1
s 8112230350 81121'0" PDR ADOCK 05000412 I t e
S POR l
, ~. _
WFR/baf bcct Messrs.
P. RaySircar J. J. Carey E. J. Woolever W. G. Logan D. H. Williams F. Salmon H. G. Frus H. A.
VanWassen R. J. Swiderski R. J. Washabaugh C. E. Ewing BV-2 Licensing File (MED-3rd Fl.)
W. F. Reimer
~
1 4
I FINAL REPORT ON i
SEISMIC CALCULATIONS FOR CATEGORY I STRUCTUPy AT
+
3EAVER VALLEY POWER STATION - UNIT NO. 2 1.0
SUMMARY
Review of design calculations for the Auxiliary Building (Category I) of Millstone Power Station - Unit No. 3 revealed that the analytical procedure, used in designing the structural system which transfers horizontal seismic forces down to the mat, was incomplete.
Beaver Valley Power Station - Unit No. 2 had used similar design procedures for the analysis of the following Category I structures:
f Auxiliary Building i
Control Room Extension Valve Pit Service Building Main Steam and Cable Vault Area Fuel and Decontamination Building Safeguards Building Diesel Gerserator Building 2.0 IMMEDIATE ACTION TAKEN l'
A preliminary review of the pertinent design calculations, for the BVPS-2 structures listed above was performed. The initial review indicated that no stractural deficiencies resulted from the analytical prreedure used.
I A subsequent detailed review of the design calculations for i
seismic loads has been completed. The detailed review verifies the results of the preliminary review, i e.,
no structural deficiencies resulted from the analytical procedure in question.
3.0 DESCRIPTION
OF DEFICIENCY The analytical procedurd used to design the st 20 r ur t_1 system for transferring horizontal seismic forces down.Lo the mat, was incomplete. The procedure used did not consider the cumulative effect of overturning moments resulting from horaguntal seismic loads.
The analytical procedure used to design the mat did include the cumulative effect of overturning moments.
i j-4w
,r r--,
=
-.w
-e
- e r-e
-m e4-
,,y,,n-z
-,w-
.,,c-
--.4----
~<.
e 4.0 ANALYSIS OF SAFETY IMPLICATIONS The Category I structures under consideration contain Category I nuclear safety-related equipment, piping, and instrumentation.
The analytical procedure used, could have resulted in some members of the structural system being stressed beyond code allowables. This condition could have caused damage to the Category I nuclear safety-related equipment.
5.0 CORRECTIVE ACTION TO REMEDY DEFICIENCY The designs of the Category I structures listed above were subjected to a detailed review. Each structure was reanalyzed to obtain the distribution of member forces resulting from the revised cumulation of overturning moments due to seismic loads.
The resultant member stresses were compared to the code allowables to determine adequacy of the design.
This detailed review concluded that no structural deficiencies resulted from the analytical procedure used.
6.0 ADDITIONAL REPORTS This is the final report on this topic.
i 1
C"
[L( !
=~
00'. ~0 l
l t
--