Metropolitan Edison Company Post Office Box 480 g
Middletown, Pennsylvania 17057 Writer's Direct Dial Number November 2, 1981
?.lL 303 Mr. R. C. Haynes, Director Region 1 Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission King of Pruosia, PA 19406
Dear Sir:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Inspection Report 50-289/80-06 The enclosed information is being submitted to comply with Sub-Article IWA-6220 of ASME Section XI.
The examinations were conducted in accordance with Amendment 54 to our Technical Specifications which upgraded the Inservice Inspection Program to the requirements of ASME Section XI, 1974 Edition through the Summer 1975 Addenda.
Additional examinations were performed in accordance with the requirements of ASME Section XI, 1970 edition with the Winter 1970 Addenda which was referenced in our Technical Specifications prior to the issuance of Amendment 54.
This submittal also includes examinations of items that were previously examined in 1979 but had to be reexamined this year because of the problems with the administration of the ISI Program, that were identified in NRC investigation report 50-289/79-10.
Because TMI-Unit 1 has been out of service continuously for more than one year, and in accordance with the option of ASME Section XI, Sub-paragraph IWA-2400, which permits plants that are out of service continuously for one year or more to extend the inspection interval, this inspection interval will be extended for an equivilent period. Thus the second 3 1/3 year inspection period examinations which were to have been completed by May 2,1981 wil.1 be extended accordingly.
This report was to have been submitted ninety (90) days after completion of the examinations, but as noted in our letter of June 17, 1980 (TLL 279) we.
stated that we would not consider the examinations completed until the items of concern ident ttled in che NRC Inspection Report 50-289/80-06 which speci-fically relate to the 1979 reexamination /1980 examinations were resolved.
F112230344 811214 fJR ADOCK 05000289 O
PDR Metropohtan Ed> son Company is a Member of the Gene'al Pubbc Ut6 tees System
Mr. R. C. Ilaynes LIL 303 All items of concern related to NRC Inspection report 50-289/80-06 have now been satisfied.
Sincerely,
)
/
\\
- 11. D.
u ill Director, TMI-l llDil:CDC:vj f Enclosure cc:
Mr. J. Claar, Chief, Boiler Division, Pennsylvania Dept. of Labor and Industry Mr. David B. Eggleston, Regional Manager, liartford Steam Boiler Inspection and Insurance Co.
I l
(
i e
METROPOLITAN EDISON DATA REPORT FOR INSERVICE INSPECTIONS Page 1 of 14 1979 R:examinstion/1980 Extmination FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPFCTIONS As required by the Provisions of the ASME Code Rules 1.
Owner Metropolitan Edison Company Reading. Pa.
(Name and Address of Owneri 2.
Plant Three Mile Island Nuclear Generating Station, Middletown, Pa.
(Name and Address of Plant) 3.
Plant Unit 1
4.
Owner Certificate of Authorization (if req.)
N/A 5.
Commercini Service Date 9-2-74 6.
National Board No. for Unit N/A 7.
Components Inspected Manufacturer Component or Manu fac turer or Ir.staller State or National Appurtenance or Installer Serial No.
Province No.
Board No.
Pressurizer Babcock & Wilcox 620-0005-59 B103810 110 P. O. Box 1250 Lynchburg, VA 24505 Steam Generator Babcock & Wilcox 620-0005-55-2 B103812 112 "B"
P. O. Box 1250 Lynchburg, VA 24505 Reactor Coolant United Engineers N/A Pa Special N/A Piping System and Construction 4177 (UE&C) 1401 Arch Street Philadelphia, PA Core Flood United Engineers N/A Pa Spceial N/A Piping System and Construction 4177 (UE&C) 1401 Arch Street Philadelphia, PA Decay Heat United Engineers N/A Pa Special N/A Piping System and Construction 4177 (UE &C) 1401 Arch Street Philadelphic, PA Note:
Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 in. x 11 in., (2) information in items 1 through 6 on this data report is included on each cheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Page 2 of 14 METROPOLITAN EDISON DATA REPORT FOR INSERVICE INSPECTIONS 1979 Rsexamination/1980 Examinstion 1.
Owner Metropolitan Edison Company
-Reading, Pa.
2.
Plant Three Mile Island Nuclear Generating Station, Middletown, Pa.
3.
Plant Unit 1
4.
Onwer Certificate of Authorization (if req.) N/A 5.
Commercial Service Date 9/2/74 6.
National Board No. for Unit N/A Components Inspected (Con't)
Manu fac turer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No.
Province No.
Board No.
Make-up United Engineers N/A Pa Special N/A Piping S stem and Construction 4177 f
(UE&C) 1401 Arch
- Street, Philadelphia, PA Main Steam United Engineers N/A Pa Special N/A Piping system and Construction 4177 (UE&C) 1401 Arch Street, Philadel-phia, PA Feedwater United Engineers N/A Pa Special N/A Piping System and Construction 4177 (UE&C) 1401 Arch
- Street, Philadelphia, PA Hydrogen Purge United Engineers N/A Pa Special N/A Piping System and Construction 4177 (UE6C) 1401 Arch Street Philadelphia, PA RC Spray and United Engineers N/A Pa Special N/A Surge and Construction 4177 Piping system (UE&C) 1401 Arch
- Street, Philadelphia, PA Steam Generator Babcock & Wilcox 62-0005-35-1 B103811 111 "A"
P. O. Box 1250 Lynchburg, VA 24305
Page 3 of 14 METROPOLITAN EDISON DATA REPORT FOR INSERVICE INSPECTIONS 1979 Reexamination /1980 Examination FORM NIS-1 (back) 8.
Examination Dates 02-21-30 to 08-06-80 _9. Inspection Interval from 09-02-74 to 09-02-84 plus the time out of service (IWA-2400).
- 10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.
See Supplement A
- 11. Abstract of Conditions Noted.
See Supplement B
- 12. Abstract of Corrective Measures Recommended and Taken See Supplement C We certify that the statements made in this report are correct and the corrective measures taken conform to the rules of the ASME Code,Section XI.
Date October 7.
19 81 Signed Met-Ed By Owner
//
Certificate of Authorization No. (if applicable) _ N/A Expiration Date.
N/A CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of PfuMA and employed by 9 5 6 JC f ][ (O.
of u pl?r FC R O _ ( c O O. have inspected the components described in this Owners' to OE-Ob Eg and state that to the best of Data Report duri'ng the period 02-31 80 1
my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Ouners' Data Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage, or a loss of any kind arising from or connected with this inspection.
Date OCrOS CR 9 19 8 i c,_-
l
,a. ( oysto Commissions PA3934
~I nspector's Signature National Board, State, Province and No.
i Page 4 of 14 METROPOLITAN EDISON DATA REPORT FOR INSERVICE INSPECTIONS 1979 Reexamination /1980 Examination 1.
Owner Metropolitan Edison Company Reading, Pa.
2.
Plant Three Mile Island Nuclear Generating Station, Middletown, Pa.
3.
Plant Unit 1
4.
Owner Certificate of Authorization (if req.)
N/A 5.
Commercial Service Date 9/2/74 6.
National Board No. for Unit N/A SUPPLEMENT A ABSTRACT OF EXAMINATIONS An Inservice Inspection (ISI) of selected components of the safety c1cas systems at Metropolitan Edison Company's (Met-Ed) Three Mile Island Nuclear Station, Unit I (TMI-I) was performed during the period 02/21/80 to 08/06/80. The components / welds examined were selected in accordance with Section 4.2 of the TMI-I Technical Specification, with Section XI of the ASME Boiler as Pressure Vessel code, 1974 Edition including the Summer of 1975 Addenda as modified by the TMI-I Technical Specification with the proposed inservice inspection program submittals to NRC dated August 17, 1977, September 17, 1977, October 20, 1979 and with the results of the meeting with NRC Licensing Dept. on October 17 and 19, 1978. The selection was based on the procedures specified in TMI-I Surveillance Procedure 1300-1, " Inservice Inspection Plan."
Manual Ultrasonic (UT), and visual techniques (VT) were used in the performance of the ISI examinations.
In addition to the exams mentioned above, UT examinations were performed for which no credit will be taken because the full weld and related volume was not inspected.
These examinations will be rescheduled and reperformed prior to the expiration of the second 3 1/3 year inspection period which is within the prescribed time interval.
METROPOLITAN EDISON DATA REPORT FOR INSERVICE INSPECTIONS 1979 Reexamination /1980 Excmination 1.
Owner Metropolitan Edison Ceepany Reading, Pa.
2.
Plant Three Mile Island Nuclear Generating Station, Middletown,- Pa.
3.
Plant Unit 1-4 Owner Certificate of Authorization (if req.)
N/A-5.
Commercial Servi:e Date 9/2/74 6.
National Board No. for Unit N/A 1979 Reexamination LIST OF EXAMINATIONS UT = Ultrasonic Test PT = Liquid Penetrant Test MT = Magnetic Farticle Tesc VT = Visual Test Inspection Section XI Re ference Item Inspection P rocedure Number Number Description Method Number 1
B2.1 PR-010-C VT 1300-IJ VT 1300-IV11 2
B2.1 PR-012-C UT 1300-1J VT 1300-1V11 j
3 B2.1 PR-013-L UT 1300-1J l
VT 1300-1V11 4
B2.1 PR-014-C UT 1300-1J VT 1300-1V11 5-20 B2.5 Pressurizer Heater Bundle Muts UT 1300-1T-PRH Q through PRH Q b
b 24 B3.2 SG-004-N Inner Radius UT 1300-1L 25 B3.2 Sg-008-N Inner Radius UT 1300-1L 26-41 B3.4 Steam Generator "B" Lower Primary Head UT 1300-1T Manway Nuts SGs-17-Q through SG Q b
42 B4.1 RC-134 UT 1300-1H VT 1300-1V23 43 B4.5 RC-064-L UT 1300-1E ns VT 1300-IV23 i
44
-B4.5 RC-065-L UT 1300-1E VT 1300-IV23 45, B4.5 RC-090 UT 1300-1E I
VT 1300-1V23 s
-46 B4.5 RC-151-L UT 1300-1E VT 1300-1V23
METROPOLITAN EDISON DATA REPORT FOR INSERVICE INSPECTIONS 1979 Reexamination /1980 Examination 1.
Owner Metropolitan Edison Company Reading, Pa.
2.
Plant Three Mile Island Nuclear Generating Station, Middletown, Pa.
3.
Plant Unit 1 4.
Owner Certificate of Authorization (if req.)
N/A 5.
Commercial Service Date 9/2/74 6.
National Board No. for Unit N/A_
LIST OF EXAMINATIONS (continued)
Inspection Section XI Reference Item Inspection Procedure Number Number Description Me th od Number 47 B4.5 RC-152-L UT 1300-1E VT 1300-1V23 48 B4.5 RC-091 UT 1300-1E VT 1300-IV23 49 b4.5 RC-092 UT 1300-1E VT 1300-IV23 50 B4.5 RC-093-L UT 1300-1E VT 1300-1V23 51 B4.5 RC-094-L UT 1300-1E VT 1300-1V23 52 B4.5 RC-043 UT 1300-1E VT 1300-1V23 53 S4.5 RC-170-L UT 1300-1E VT 1300-iV23 54 B4.5 RC-171-L UT 1300-1E VT 1300-1V23 55 B4.5 RC-135-L UT 1300-1E VT 1300-1V23 56 B4.5 RC-136-L UT 1300-1E VT 1300-1V23 57 B4.5 RC-047 UT 1300-1E VT 1300-1"?.3 58 B4.3 CF-027 UT 1300-1E E'
VT 1300-1V23 59 B4.5 CF-028 UT 1300-1E os VT 1300-1V23 o
60 B4.5 CF-030 UT 1300-1E VT 1300-IV23 61 B4.5 DH-038 UT 1300-1E VT 1300-IV23
METROPOLITAN EDISON DATA REPORT FOR INSERV2CE INSPECTIONS F179 Reexamination /1980 Examination 1.
Owner Metropolitan Edison Company Reading, Pa.
2.
Plant Three Mile Island Nuclear Generating Station, Middletown, Pa. _
3.
Plant Unit 1 4.
Owner Certificate of Authorization (if req.)
N/A 5.
Commercial Service Date 9/2/74 6.
National Board No. for Unit N/A LIST OF EXAMINATIONS (continued)
Inspection Section XI Re fe rence Item Inspection Procedure Number Number Description Method Number 62 B4.5 DH-039 UT 1300-1E VT 1300-IV23 63 B4.5 DH-040 UT 1300-1E VT 1300-1V23 64 B4.5 DH-041 UT 1300-1E VT 1300-IV23 65 B4.5 MU-069 UT 1300-1E VT 1300-1V23 66 B4.5 MU-070 UT 1300-1E VT 1300-1V23 67 B4.5 MU-087 UT 1300-1E VT 1300-1V23 68 B4.5 MU-088 UT 1300-1E VT 1300-1V23 69 B4.5 MU-122 UT 1300-1E VT 1300-1V23 70 B4.5 MU-123 UT 1300-1E VT 1300-1V23 71 B4.5 MU-124 UT 1300-1E VT 1300-1V23 72 B4.5 MU-125 UT 1300-1E VT 1300-1V23 o
73 B4.5 MU-127 UT 1300-1E VT 1300-1V23 74 B4.5 MU-128 UT 1300-1E VT 1300-1V23 S
75 B4.5 MU-173 UT 1300-1E s
VT 1300-1V23 76 B4.5 MU-174 UT 1300-15 VT 1300-IV23
~.
METROPOLITAN EDISON DATA REPORT FOR INSERVICE INSPECTIONS
~
1979 Reexamination /1980 Examination
~.
1.
Owner Metropolitan Edison Company Reading, Pa.
2.
Plant Three Mile Island Nuclear Generating Station, Middletown, Pa.
3.
Plant Unit 1 4.
Owner Certificate of Authorization (if req.)
N/A 5.
Commercial Service Date 9/2/74 6.
National Board No. for Unit N/A LIST OF EXAMINATIONS (continued)
Inspection Section XI Reference Item Inspection Procedure
-Number Number Description Method Number 77 B4.5 MU-175 UT 1300-1E VT 1300-1V23 78 B4.5 MU-176 UT 1300-1E VT 1300-IV23 79 B4.5 MU-177 UT 1300-1E VT 1300-1V23 80 B4.5 MU-178 UT 1300-1E VT 1300-IV23 81 B4.5 MU-179 UT 1300-1E VT 1300-1V23 82 B4.5 MU-180 UT 1300-1E VT 1300-1V23 83 B4.5 SP-006 UT 1300-1E VT 1300-1V23 84 34.5 SP-007 UT 1300-1E VT 1300-1V23 i
85 B4.5 RC-206 VT-1300-IV23 86
~
B4.5 RC-207 UT 1300-1E VT 1300-1V23 87 B4.5 RC-208 UT 1300-1E VT 1300-1V23 88 B4.5 RC-209 UT 1300-1E 7
VT 1300-IV23 89 C1.1 WG-82-A.
UT 1300-1K co 2
90 C1.2 WG-23-A (x y)
-1300-1K o.
91 C2.1 F W-W-1 UT 1300-1E 92 C2.1 F W-W-2 UT -
1300-1E Z
93.
C2.1 HP-W-5 UT 1300-12 94
_C2.4 MS-V-19C Flange Bolting (MS-1 UT 1300-1T thru MS-12)
_VT 1300-Iv33
METROPOLITAN EDISON DATA REPORT FOR INSERVICE INSPECTIONS 1979 Reexamination /1980 Examination 1.
Owner Metropolitan Edison Company Reading, Pa.
2.
Plant Three Mile Island Nuclear Generating Station, Middletown, Pa.
3.
Plant Unit 1 4.
Owner Certificate of Authorization (if req.)
N/A 5.
Commercial Service Date 9/2/74 6.
National Board No. for Unit N/A 1980 Examinations LIST OF EXAMINATIONS UT = Ultrasonic Test PT = Liquid Penetreant Test MT = Magnetic Particle Test VT = Visual Test Inspection Section XI Reference Item Inspection Procedure Number Number Description Method Number 1
B2.2 PR-003-N UT 1300-1J 2
B4.5 RC-063 VT 1300-1V23 3
B4.7 RC-112-B VT 1300-1V23 4
B4.10 MUH-59 VT 1300-1V25 5
B4.10 MUH-60 VT 1300-IV25 6
B4.10 MUH-61 VT 1300-1V25 7
B4.10 MUH-62 VT 1300-1V25 8
B4.10 MUH-63 VT 1300-1V25 9
B4.10 MUit-64 VT 1300-1V25 10 B4.10 MUH-65 VT 1300-1V25 11 B4.10 MUH-66 VT 1300-1V25 12 B4.10 MUH-67 VT 1300-1V25 1
13 B4.10 MUH-68 VT 1300-1V25 14 B4.10 MUH-69 VT 1300-1V25 15 B4.10 MUH-203 VT 1300-1V25 16 B4.10 MUH-204 VT 1300-1V25 17 B4.10 MUH-205 VT 1300-1V25 18 B5.3 RC-P-1A Flange Bolt #23 VT 1300-1V29 2
19 B5.3 RC-P-1A Flange Bolt #24 VT 1300-1V29 20 C2.6 DHH-171 VT 1300-1V36 e
21 C2.6 DHH-108A VT
'1300-1V36 o
22 B4.5 RC-210 UT 1300-1E 23 B3.4 Steam Generator "B" Upper and Lower UT 1300-1T 5
Primary Head Manway Studs SGb-01M through SG -32M b
Page 10 of 14 METROPOLITAN EDISON DATA REPORT FOR INSERVICE INSPECTIONS 1979 Reexamination /1980 Examination 1.
Owner Metropolitan Edison Company Reading, Pa.
.2.
Plant Three Mile Island Nuclear Generating Station, Middletown, Pa.
3.
Plant Unit 1 4..
Owner Certificate of Authorization (if req.)
N/A 5.'
Commercial Service Date 9/2/74 6.
National Board No. for Unit N/A JT?.TUS OF EXAMINATIONS REQUIRED DURING INTERVAL t
i i
This report covers the following:
1.
Twenty-five percent of the Class 1 and 2 examinations required during the second 3-1/3 year period.
2.
No Class 3 examinations are included in this report.
i 1,
I a
1
- E*
~ METROPOLITAN' EDISON DATA REPORT FOR INSERVICE INSPECTIONS 1979 Reexamination /1980 Examination 9
1.
Owner Metropolitan Edison Company Reading, Pa.
2.
Plant Three-Mile Island Nuclear Generating Station,-Middletown, Pa.
- 3... Plant Un t-1 4.
Owner Certificate of Authorization (if req.)
N/A' i
- 5.
- Commercial Service Date 9/2/74-6.
National Board No. for Unit
-N/A-FUPPLEMENT B l
ABSTRACT OF CONDITIONS NOTED 1.0 EXAMINATION
SUMMARY
1.1 General During the period of February 21, 1980 to August 6,1980, Nuclear Energy Services, 'Inc _ (NES) and GPU Nuclear Corp. performed nondestructive examinations j I
. on selected components of Three Mile Island Nuclear Station, Unit 1, (TMI-I) pressurized wat'er reactor system. The items examined:
- 1. were selected and 2.
2 any indications noted were evaluated /dispositioned, in accordance with the following governing documents:
~
1.
TMI-I Technical Specification, Section 4.2.
s
.v.
2.
ASME Boiler and Pressure Ve~ssel Code,Section XI, " Rules for Inservice I
Inspection of Nuclear Reactor Coolent Systems, "1974 Edition including the Summer of'1975 Addenda, as modified by the TMI-I Technical Specification.
3.
TMI-I Proposed Inservice Icapection Program Submittal to the NRC dated August 17, September 30, 1977 and October 26, 1979.
4.
TMINS Unit-1 Inservice Inspection (NDE Portion) Project Organizational Responsibilities Document (ISI PORD).
~
Representative samples of the components and/or areas as listed in the following paragraphs, were examined with nondestructive testing (NDT) techniques.
The examinations were performed, to the extent possible, in accordance with the requirements of Appendix I of Section XI of the ASME Boiler and Pressure Vessel Code 1974 Edition through Summer 1975 Addenda, and Section V of the ASME Boiler and Pressure Vessel Code, 1974 Edition through Summer 1975 Addenda. Nondestructive tests performed included Manual Ultrasonic (UT) and Visual (VT) techniques. The various examinations were conducted as defined in specific written procedures applicable to the respective' examination areas. The applicable procedures were revised and/or prepared lur Metropolitan Edison and NES prict to the outage and
' conform to the extent -practiedl with the requirements of the applicable sections of the ASME Boiley and Pressure Vessel Code.
j Prior to and during the ISI performance, third party inspections were performed by personneb representing the Hartford Steam Boiler Inspection and Insurance Company.
i Reviews were. conducted by a consultant to GPU Service Corp. at Level III of all ISI l
data generated 'tyr NES during 'the; performance of the examinations.
l s'
s
?
c 1
METROPOLITAN EDISON DATA REPORT FOR INSERVICE INSPECTIONS 1979 Reexamination /1980 Examination 1.
Owner Metropolitan Edison Company Reading, Pa.
2.
Plant Three-Mile Island Nuclear Generating Station, Middletown, Pa.
3.
Plant Unit 1-4.
Owner Certificate of Authorization (if req.)
N/A 5.
Commercial Service Date 9/2/74 6.
National Board No. for Unit N/A 1.2 Ultrasonic-Examination Summary Ultrasonic examinations (UT) were performed as described in Supplement A.
All recordable indications were determined to be not reportable.
1.3 Visual Examination Summary Visual examinations (VT) were performed on the components listed in Supplement A, no reportable conditions were noted.
2.0 DISCUSSION 2.1 General This report section describes the equipment and examination techniques used during this Inservice Inspection (ISI) Program, and provides a discussion of significant examination details and results. Test data (instrument calibration data and examination results) are on file at the TMI-I site. The following items are required for documentation of the ISI:
1.
An itemization of the specific components / welds examined. This information is presented in Supplement A.
2.
No new ultrasonic calibration standards were used during the outage 3.
The various nondestructive examinations were conducted in accordance with procedures prepared specifically for the TMI-I ISI Program. Approved procedure copies are on file at the TMI-I site.
4.
Several types of certifications required are also on file at the TMI-I site:
- a. Personnel Qualification Certificates.
Examination personnel were certified in accordance with established NES and Met Ed -
GPU Service Corp. certification procedures and "SNT-TC-1A, American Society for Nondestructive Testing Recommended Practice."
l
- b. Instrument Certifications.
l
- c. Material Certifications.
l l
d Ultrasonic Transducer Certifications.
Page 13 of 14 METROPOLITAN EDISON DATA REPORT FOR INSERVICE INSPECTIONS 1979 Reexamination /1980 Examination 1.
Owner Metropolitan-Edison Company Reading, Pa.
2.
Plant Three Mile Island Nuclear Cenerating Station, Middletown, Pa.
3.
Plant Unit 1 4.
Owner Certificate of Authorization (if req.)
N/A 5.
Commercial Service Date 9/2/74 6.
National Beard No. for Unit N/A 2.2 Equipment
- 1. Ultrasonic The ultrasonic inst run.ents and search units (ultrasonic transducers) used during the ISI examinations are identified in inspection data on file at the TMI-I Site.
The ultrasonic instruments were certified as calibrated in accordance with approved calibration procedures. Performance characteristics of the ultrasonic transducers are also documented.
2.3 Examination Techniques
- 1. Visual (VT)
Areas requiring visual examination were examined in accordance with procedures provided by Metropolitan Edison Co., (Met Ed).
Specific procedures, applicable to each item or category of items, defined areas of examination and data recording documentation methods.
- 2. Ultrasonic (UT)
Ultrasonic examinations were performed in accordance with Met-Ed Procedures prepared specifically for the TMI-I Program.
2.4 Calibration Standards The ultrasonic calibration standards used during the examinations were selected from the TMI-I calibration standard inventory.
Paga 14 of 14 METROPOLITAN EDISON DATA REPORT FOR INSERVICE INSPECTIONS 1979 Reexamination /1980 Examination 1.
Owner Metropolitan Edis C ompany Reading, Pa.
e-2.
' Plant Thiae Mile Island Nuclear Generating station, Middletown, Pa.
3.
Plant Unit 1 4.
Owner Certificate of Authcrization (if req.)
N/A 5.
Commercial Service Date 9/2/74 6.
National Board No. for Unic N/A SUPPLEMENT C ABSTRACT OF CORRCCTIVE MEASURES RECOMMENDED AND TAKEN 1.
During the course of the examinations a number of nonconforming conditions were identified and are documented in the following.
Nonconformance Reports (NCR's): These NCR's are nn file with the inspection date package.
These NCR's have been resolved and closed out in accordnnce with the TMI-I Quality Assurance Program.
2.
A UT examination of the Pressurizer Heater Bundle Nut PRH Q identified a b
recordable indication. The n.ut was replaced. The defective nut was examined by Meta 11ographic Techniques in'the GPUSC System Laboratory (See Lab Report
- 66143), and found to have both rounded and linear inclusions. These inclusions
)
were manufacturing defects.
}