ML20039B404

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 2904.2 Re Magitude of Release for Unit 2 & 1903-24 Re Oil Spill Prevention Control & Countermeasure Plan
ML20039B404
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/27/1981
From:
ARKANSAS POWER & LIGHT CO.
To:
NRC
Shared Package
ML20039B398 List:
References
NUDOCS 8112220672
Download: ML20039B404 (2)


Text

- - - _ _ _ _ - _ - - - _ _ _ -__ _ _ _ _ _ _ _ - _ _ - - - _ - - _ _ - - _ _ _ - _ - _ - _ - _ _ _ - - _

~ ' ~

_SO -3 L}

3p ARKANSAS PO'NER & LIGHT COMPANY Q. a.., y t i-d Arkansas Nuclear One TRANSMITTAL l FCRM NO. 1013.02H

-' Arkansas Nuclear Cne Russellville, Arkansas Date March 27, 1981 MEMCF GDUM .

.?V: HOLDERS OF SERIES 2904 - MAGNITUDE OF RELEASE PROCEDURE - UNIT 2 PROCEDURES 2904.01 -- 2904..U

~

'iROM: ANO DOC'.22...T mEi.,

SUPJECT: ANO MASTER Pl. ANT MANUAL The procadures, revisions, permanent changes, and/or te=porary changes listed below have been / /should be / /placed in your set of the plant manual.

PRCCEDURE 9 REV. # PERM. CHG. # TE'!P. CHG. # PROCEDURE TITLE 2904.02 1 MAGNITUDE OF RELEASE - UNIT 2 2904.02 2 MAGNITUDE OF RELEASE - UNIT 2 COPIES TO: .

w/o att: Word Processing 78-ANO Library w/att: 1-Control Room - Unit 1 84-Emergency Planning Coord.

3-Control Room - Unit 2 92-Training - NSC 14-Plant Admin. Mgr. 93- Ops. Tech.

19-Trng./Coun. Supv. 100-NRC Region 20-Trng. Coord. Ops. 101-NRC Region 27-Engr./ Tech. Supp. Mgr. 102-NRC Region 28-Tech. Anal. Supt. 103-NRC Washington (Info Only) 29-EP Supervisor / T4-NRC Washington 19-Trng./Coun. Supv.

32-Asst. HP Supv. 105-NRC Washington (Vandergrift)

SI-Emer. Kit 3 - ECC 106-NRC Washington 59-Admin. Copy 2nd Floor 107-NRC Washington 1 65-E=ergency Kit Loca-1 Office 108-NRC Washington b 90 109-NRC Washington I I Updated 66-ECC g 110-NRC Washington

. Clerk lil-NRC Washington ll2-NRC Washington-V G112220672 011215 PDR ADOCK 05000313 F PDR p

g ARKANSAS POWER & LIGHT COMPANY

[' G L

, t Arkansas Nuclear One

  • l FORM NO, TRANSMITTAL 1013.0211 Arkansas Nuclear One Russellville, Arkansas Date March 27, 1981 MEMORANDL?! _

.TO: HOLDERS OF SERIES 2904 - MAGNITUDE OF RELEASE PROCEDURE - UNIT 2 PROCEDURES 2904.01 -- 2904.XX

~

FROM: ANO DOCUMENT CONTROL

SUBJECT:

ANO MASTER PLANT MANUAL The procedures, revisions, permanent changes, and/or temporary changes listed below have been / /should be / /placed in your set of the plant manual.

PROCEDURE # REV. # PER'!. CHG. # TEMP. CHG. # PROCEDURE TITLE 2904.02 1 MAGNITUDE OF RELEASE - UNIT 2 2904.02 2 MAGNITUDE OF RELEASE - UNIT 2 COPIES TO:

w/o att: Word Processing 78-ANO Library w/att: 1-Control Room - Unit 1 84-Emergency Planning Coord.

3-Control Room - Unit 2 92-Training - NSC 14-Plant Admin. Mgr. 93- Ops. Tech.

19-Trng./Coun. Supv. 100-NRC Region 20-Trng. Coord. Ops. 101-NRC Region 27-Engr./ Tech. Supp. Mgr. 102-NRC Region 28-Tech. Anal. Supt. 103-NRC Washington (Info Only) 29-HP Supervisor 104-NRC Washington 19-Trng./Coun. Supv.

32-Asst. HP Supv. 105-NRC Washington (Vandergrift)

SI-Emer. Kit 3 - ECC 106-NRC Washington 59-Admin. Copy 2nd Floor 107-NRC Washington 65-Emergency Kit Loca-1 Of fice 108-NRC Washington p

g Updated 66-ECC 109-NRC Washington 110-NRC Washington Clerk ly -NRC Washington

/fl2-NRC Washington