lu ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One O EMERGENCY PLAN PROCEDURE FORM 1000.06A C'lGAN. AND USE OF THE EMERG. PIAN IMPLEMENTING PROCEDUKES 1903.01 Rev. 2

.i h#

sb amw RECORD OF CHANGES AND REVISIC:lS

=

w

~ '(fi pe,c.s nevision cs ~ae e as nevision ca sae oe navisics cs ~as the 1 2 2 2 3 0 4 2 5 1 O

s

  • aA !!882 J ab8sia Oe eon .

-e g pgg , -_.- _/v.

7 ei

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY ORGANIZATION AND USE OF EMER-  !

. PLAN GENCY PLAN IMPLEMENTINC PROCEDURES 1903.01 fs, PAGE 1 of 5

( ) ARKANSAS NUCLEAR ONE aevisioN CHANGE 2 DATE DATE 6/22/81 l l

1.0 PURPOSE The purpose of this procedure is to:

1.1 Describe the organization of the Emergency Plan Implementing procedures.

1.2 Describe the relationship of the Emergency Plan Implementing Procedures to other plant procedares.

1.3 Describe a method for making use of the Emergency Plan b; i m o ~ ry - , Implementing Procedures in the event of an emergency.

2.0 SCOPE The organizational guidance contained in this procedure applies to Unit One and Unit Two procedures that would involve response indicated in the ANO Emergency Plan.

3.0 REFERENCES

I 3.1 References Used in Procedure Preparatica:

ID

( ,) 3.1.1 Arkansas Nuclear One Emergency Plan 3.2 References Used in Conjunction with this Procedure:

3.2.1 1000.08, " Regulatory Reporting and Communication" 3.2.2 1000.21, "Public Communications" 3.2.3 1202 Series Procedures - Emergency Operating Procedures (Unit 1) 3.2.4 1203 Series Procedures - Abnormal Operating Procedures (Unit 1) 3.2.5 1602 Series Procedures - Radiation Protection Procedures 3.2.6 1043 Series Procedures - Security Administration Procedures v.

3.2.7 1903 Series Procedures - Emergency Plan Implementing Procedures 3.2.8 1104 Series Procedures - Magnitude of Release Procedureu 3.2.9 2202 Series Procedures - Emergency Operating Procedures (Unit 2) 3.2.10 2203 Series Procedures - Abr.ormal Operating Procedures (Unit 2) 3.2.11 1023 Series Procedures - Human Resources Administration

. Procedures 3.3 Relc;ed ANO Procedures:

3.3.1 Arkansas Nuclear One Fire Plan l

l ,_ 3.3.2 Arkansas Nuclear One Industrial Security Plan 1 i l N.)\

1 1 -

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

. ENERGENCY ORGANIZATION AND USE OF EMER-PLAN GENCY PLAN IMPLEMENTING PROCEDURES 1903.01 PAGE 2 o '. 5

(^1 v/

ARKANSAS NUCLEAR ONE aEvisioN CHANGE 2 oATE e/22/81 DATE 4.0 DEFINITIONS 4.1 Emergency Action Level - A classification of unusual or emergency situatic's (required by the NRC for nuclear power plants) which puts pos ible unusual or emergency situations into one of four categories. These categories are:

Unusu.1 Event Alert Site Emergency General Emergency

>de' iX ~ . . ~ ,

For each category, the Emergency Plan and Emergency Plan Implementing Procedures describe the actions to be taken to respond to the unusual or emergency situtation.

4.2 Initial Response Organization - The emergency response organization, primarily composed of plant staff personnel, which must be able to augment the onsite plant personnel within 60 minutes of being notified.

5.0 RESPONSIBILITIES O) t

\. J As described in Section'6.0.

6.0 DISCUSSION 6.1 Organization of the Emergency Plan Implementing Procedures 6.1.1 The Arkansas Nuclear One Emergency Plan describes g!nerally the provisions taken and commitments made to cope with unusual or emergency situtations. The Jetails of implementation of the Emersency Plan, e.g., names and telephone numbers, specific items of equipment,and supplies, inventory lists, and . , ,

~

step-by-step instructions and checklists :re contained in the Emergency Plan Implementing Pro-cedures.

6.1.2 The 190X.XX series of procedures have been designated as Emergency Plan Implementing Procedures. Within this series designator, subjects and responsibilities for the Emergency Plan Implementing Procedures have been sub-divided as follows:

A. 1903.XX - The Emergency Planning Coordinator has primary responsibility for these proceduree. This series of procedures contains the majority of the

"-x details of implementation of the Emergency Plan.

LJ l

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TlTLE: NO:

- EMERGENCY ORGANIZATION AND USE OF EMER-PLAN GENCY PLAN IMPLEMENTING PROCEDURES 1903.01 PAGE 4 of 5

(^'; ARKANSAS NUCLEAR ONE REVISION 2 DATE 6/22/81 Nd CHANGE DATE 6.2 Relationship of the Emergency Plan Implementing Procedures to Other Plant Procedures 6.2.1 Activation of the Emergency Plan does not supersede the use of other plant procedures. Rather, the Emergency Plan implementing Procedures are intended to supplement normal plant procedures and do not supersede other plant procedures unless they specifically state so.

6.2.2 Operations personnel actions to recognize and recover from unusual or emergency condicians are contained in U/' AA46 :

s. Emergency Operating Procedures, 1200 and 2200 series procedures. The 1903.1X procedures contain the guidance for classifying unusual or emergency conditions into Emergency Action Levels for purposes of the emergency organization response.

l

~

6.2.3 Requirements for radiological monitoring and personnel exposure limits are contained in the Technical Analysis Procedures, 1600 and 2600 Series Procedures. However, in the event of an emergency, allowable exposure limits may be increased above the normal radiation exposure f ~3 limits in accordance with the requirements contained (v ) in procedure 1903.33, "Re entry Guidelines".

6.2.4 The participation of the security force in the overall emergency response is described in the Emergency Plan Implementing Procedures. However, sensitive details of the response of the security force to an emergency are contained in the Security Plan Implementing Procedures (1043 Series Procedures).

6.2.5 Communications with the media in the event of an emer-gency shall be in accordance with procedure 1000.21, "Public Communications.". ,

6.2.6 Preparation and review of written reports to the Nuclear Regulatory Commission to close out an emergency shall be in accordance with Procedure 1000.08, " Regulatory Reporting and Communication".

6.2.7 Training of Arkansas Nuclear One personnel on their emergency-related responsibilities and drills and exercises to maintain emergency readiness shall be in accordance with l the 1023 Series Procedures.

6.2.8 The pisnt response to a fire shall be in accordance in s

Procciore 1903.22, " Fire or Explosion".

v l

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuc! oar One O-s DIERGENCY PLAN FORM 1000.06A DIFRGENCY RESPONSE ORGANIZATION 1903.50 REV. 2

..=-

n UN A@dM kg On s

!;Q:aq c4G&x ~Lw.a c RECORD OF CHANGES AND REVISIONS i

PAGE REVISION CHANGE PAGE REVISION CHANGE PAGE REVISION CHANGE 1 2 2 2 -

3 2 4 2 5 2

  • 6 2 7 2 3 8 2 9 2 10 2

! 11 2 .I -

12 2 13 2 14 2 ,,

15 2 t

O

= npg 3~. c.. ~ . g

.A,E A-)A 7 70 y>

. PLAN T MANUAL SECTION: PROCEDURENICRK PLAN TITLE: N C.

, EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1003.50 PAGE 1 of 15

(,,) ARKANSAS NUCLEAR ONE 2EvisioN 2 DATE 6/29/8_1_ _

\_/ CitANGE DATE 1.0 PURPOSE The purpose of this procedure is to describe the division of responsibilities of the AP&L Emergency Response Organization (ERO). Portions of this augmented Emergency Response Organization may be act.ivated for Unusual Events and Alerts.

The entire organization would be activated for Fite and General Emergencies.

2.0 SCOPE This ' procedure is applicable to emergency situations involving Unit One and/or Unit Two.

ma +..p 3.0 n k ,REFER

+ ENCES

-,:~-,,

3.1 Ref erences Used in Procedure Preparation:

3.1.1 Arkansas Nuclear One Emergency Plan.

3.2 References Used in Conjunction with this Procedure:

None 3.3 Related ANO Procedures:

<- s 3.3.1 Procedure 1303.51, " Turnover of Responsibility to the

( ,

) Emergency Response Organization".

4.0 DEFINITIONS 4.1 Emergency Response Organization (ERO) - The AP&L emergency response organization, composed of plant and General Office personnel, which is ac ivated to augment the resources of the Inftial Response Organiz-ation for more serious events. A diagram of this organization is shown in Attachment 1.

4.2 Initial Response Organization (IRO) - The emergency response organization, primarily composed of pland personnel, which must be able to report to the plant within 60 minutes tof being notified. A diagram of this organi-zation is shown in Attachment 2. This organization is composed of the Operations Staff on duty, the Duty Emergency Coordinator, the Shift Technical Advisor and the Plant Emergency Response Teams.

4.3 Onsite Technical Support Center - The location within the ANO Admini-stration Building equipped with inscrumentation and communication systems and facilities useful in monitoring the course of an accident; this center is located in the 4th floor Planning & Scheduling area.

4.4 Onsite Operational Support Center - The ANO Administration Building; g the normal work location for an individual is used as the reporting area in this center with the following exceptions:

[~'T 1

l

\_/

.~ .

. PLANT M ANUAL SECTION: PROCEDUREMIORK PLAN TITLE: NO:

, EMERGE"CY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 2 of 15 '

O'

\ ~/

ARKANSAS NUCLEAR ONE aavision CHANGE 2 DATE DATE 6/29/81 4.4.1 Planning & Scheduling Supervisor - 4th floor conference room.

4.4.2 Radwaste Coordinator - individual's supervisor's office in the Administration Building.

4.4.3 Emergency T am Personnel.

A. Evacuation - (Material Management Personnel) Main Guard Station; (Training Personnel) Emergency Control Center

, , . ;,: o ., , , , ; ._ B. Fire - 2nd floor conference room.

C. Medical - First Aid Room /2nd Floor Break Room.

D. Radiation - (Onsite Team) 1st floor classroom (and adjacent. offices).

E. Recovery - same as 4.4.3.D.

4.5 Emergency Control Center (ECC) - a near-site facility located ap--

proximately 0.65 miles northeast of the reactor buildings (the ANO

-) Training Facility).

5.0 RESPONSIBILITIES h0TE: Unless otherwise indicated, a position should be filled by AND personnel bearing the same title.

5.1 The Emergency Response Organization is dividied into four sreas of resp <,nsibility: recovery, technical support; communications, and (non-technical) support. Recovery is directed by the Recovery Manager with advice and support from the Incident Response Director. Support of the Recovery Manager may be provided both onsite and offsite a:.d is the responsibility of t' e .Encident Response Director.

5.2 The Incident Response Director (IRD) is the individual responsible to Arkansas Power & Light corporate management for overall direction of the response to an incident. As such, he is responsible for assuring the continuity of resources (technical, administrative and matc rial) required for continuous operations of the Emergency Response Organiza-tion for a protracted period. The Incident Response Director is the primary authority for the Company and must approve public information releases prepared by AP&L. In the absence of the Incident Response Director, the Technical Support Manager shall assume his duties.

This position should be filled by the Senior Vice President of Energy Supply.

t l v

i

, PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 3 of 15 I) v ARKANSAS NUCLEAR ONE REVISION 2 DATE 6/29/81 CHANGE DATE 5.3 Two assist:.nts are assigned to the Incident Response Director. In addition, the Assistants to the Intiabnt Response Director are re-sponsible for preparing and distributing periodic progress reports to the entire Emergency Response Organization in order to assure that each portion of the organization is working with current and consistent information. The Assistants to the Incident Response Director also coordinate responses to requests for information by non-AP&L groups (local, state, federal, other Utilities, etc.). In the absence of the Incident Response Director and the Technical Support Manager, an Assistant to the Incident Response Dircetor assumes the d, ties of the Incident Response Director.

, die.,;+*"'

These positions should be filled by the Director of Technical and Environmental Services and the Director of Fossil Operations.

5.4 The Recovery Manager assumes the duties of the Duty Emergency Coordi-nator and has authority.t.o take any action he deems necessary to place the plant in a safe configuration. The Recovery Manager has the re-sponsibility for decisions regarding emergency operocions at the plant.

In the absence of the IRD, the Technical Support Manager and the Assistants to the IRD, the Recovery Manager assumes the duties of the Incident Response Director.

/N

('-') The Operations Manager, the Maintenance Manager, the Maintenance Super-intendents, and their ataffs report to the Recovery Manager to assist him in planning and directing corrective and recovery actions. The Emergency Recovery Team is assembled by the Recovery Manager and functions under his directica. In the absence of the Recovery Manager, the Operations Manager, the Maintenance Manager or the Operations Superintendent of the unaffected unit (in that order) assumes the duties of the Recovery Mac,ger.

This position should be filled by the ANO General Manager.

5.5 The Operations Manager is responsible for assisting the Recovery Manager in planning and direct lng cor rective or recovery actions.

In the absence of the Recovery Manager, the Operations Manat,er assumes the duties of the Recovery Manager.

5.6 The Maintencnce Manager is responsible for assisting the Recovery Manager in planning and directing corrective or recovery actions.

In the absence of the Recovery Manager and the Operations Manager, the Maintenance Manager assumes the duties of the Recovery Manager.

l D lG I

. _ . PLANT MANUALSFCTION: PROCEDURER/ORK PLAN TITLC NO:

EMERGENCY PLAN LMERGENCY RESPONSE ORGANIZATION 1903.50 r PAGE 4 of 15 O N/

ARKANSAS NUCLEAR ONE aev'sioN CHANGE 2 DATE DATE 6/29/81 5.7 The Maintenance Superintendents are responsible for necessary repairs and installation of plant equipment modificatio_ns and assistance in directing the Emergency Recovery Team.

5.8 The Planning and_ Scheduling Supervisor is responstole for coordinating the activities of plant personnel not assigned to specific teama.

5.9 The Operations Superintendent is the primary authority i,n the Control Ecom of his designated unit. He shall determine plant conditions, make recommendations and provide updates to the Recovery Manager.

In the absence of the Recovery Manager, Operations Manager, and the

, - i. w ,4 a re ,s Maintenance Manager, the Operations Superintendent of the unaffected unit shall assume the duties of the Recovery Manager.

5.10 The Shift Technical Advisor shall assist the Shift Operations Super-visor in the Control Room of the affected Unit to follow the course of the emergency and mitigate its consequences.

5.11 The Technical Support Manager is responeible for technical support activities. He is also responsible for coordinating AP&L off site radiological monitoring efforts with the Arkansas Department of Health and Nuclear Regulatory Commission. In the absence of the 7s Incident Response Director, the Technical Support Manager assumes

(

%j

) nis duties.

This position should be filled by the Assistant Vice President of Nuclear Operations.

5.12 The Nuclear and Engineeril 2 Support Superintendent is responsible for providing advice on plant design and coordinating engineering ac-tivities in the areas of analysis, design modifications and system response.

This position should be filled by the ANO Engineering and Technical Support Manager. t 5.13 The Health Physics and Chemistry Superintendent is responsible for supervising onsite health physics and chemistry activities. These activities include onsite radiological monitoring, decontamination, initial dose assessment calculations, initial magnitude of radio-logical relense calcul-t4,ns, primary side chemistry raatrol and sampling, and secondary side chemis ry control and sampling.

This position should be filled by the ANO Technical Analysis Super-intendent.

['N

\ )

t_-

l l

l 1

1 l

PLANT k ANUAL SECTION PROCEDUREWORK PLAN TITLE: NO: l l

, EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 i es PAGE 5 or 15 J

b'

) ARKANSAS NUCLEAR ONE REVISION CHANGE 2 DATE DATE o/29/81 5.14 The Engineering Resources Coordinator is responsible for coordinating the engineering support of the Nuclear Steam Supply System vendors, Architect / Engineer, Middle South Services, Nuclear Regulatory Commission, other utilities, and consultants.

This position should be filled by the Diractor of Generation Engineer-ing.

5.15 The Licensing Coordinagor is responsible for coordinating activities to respond to Nuclear Regulatory Commission requests.

.. u q g 7 This_ position should be filled by the Manager of Licensing.

5.16 The Nuclear Support Supervisor is responsible for coordinating activi-ties related to nuclear engineering and reactor physics.

This position should be.Eilled by the AN0 Plant Analysis Superintendent.

5.17 The Site Engineering Supervisor is responsible for coordinating engi-neering activities at the site.

This position should be filled by the Plant Engineering Superintendent.

n

()

5.18 The Dose Assessment Supervisor is responsible for calculating magnitude of radiological releases and doses to individuals offsite.

This position should be filled by the Manager or Technical Analysis.

5.19 The Onsite Monitoriag and Health Physics Supervisor is responsible for monitoring onsite radioactivity levels, monitoring personnel exposures and directing Health Physics activities onsite. The Onsite Radiological Section of the Emergency Radiation Team reports to him following activation of the Emergency Response Organization.

This position should be fihled,by the ANO Health Physics Superintendent.

5.20 The Radiochemistry Supervisor is responsible for sampling and analysis of primary plant coolant and liquid and gaseous radioactive wastes.

5.21 The Chemistry Supervisor is responsible for sampling and analysis of secondary plant fluid systems.

5.22 The Offsite Monitoring Supervisor is responsible for directing AP&L offsite radiological monitoring activities. This effort shall be supplemented by AP&L laboratory personnel from the Technical Analysis Section of the Technical and Environmental Services Department, located in Little Rock. The Offsite Radiological Monitoring Section of the

~ Emergency Radiation Team reports to him following activation of the

\

(v '} Emergency Response Organization.

l This position should be assigned by the Dose Ascessment Supervisor from personnel in *he Technical & Environmental Section Laboratory.

l l

PLANT MANUAL SECTION: PROCEDUREf3ORK PLAN Til LE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 6 of 15

('"'>

N/

ARKANSAS NUCLEAR ONE REVISION CHANGE 2 DATE 6/29/81 DATE 5.23 The hadwaste Coordinator is responsible for the packaging, transport-ing, and disposing of radioactive wastes.

5.24 The Support Superintendent is responsible for coordinating non-technical support. He reports directly to the Incident Response Director.

This position should be filled by the Director of Administrative Services and Project Support.

5.25 The Logistics and Procurement Coordinator is responsible for obtaining any additional facilities, equipment, supplies and transportation re-cw w e w An -quired to support the Emergency Response Organization.

This position should be filled by the ANO Administrative Manager.

5.26 The Financial Services Coordinator is responsible for maintaining the payroll, and any other roqcired financial assistance.

This position should be filled by the Manager of Financial Services.

5.27 The Office Services Coordinator is responsible for word processing, drafting, maintaining files and documentation in the Little Rock

,- s General Office.

i )

'~' -

This position should be filled by the Office Services Coordinator.

5.28 The Site Security Coordinator is responsible for controlling access to the plant and to the Emergency Control Center. He is responsible for personnel accountability within 1he exclusion area and at the Emergency Control Center. He shall also coordinate Arkansas Power &

Light security efforts with local law enforcement authorities. The Emergency Evacuation Team reports to him following activation of the Emergency Response Organization.

5.?9 Tha Facilities Maintenance icoordinator is responsible for repairs and maintenance of the Emergency Control Center and of the equipment and facilities which have been brought in to promote recovery from the incident. He should work clocely with the Logistics and Procurement Coordinator to obtain any waterials or additional facilities requested of him.

This position should be filled by the ANO Plant Services Supervisor.

/h k

v

1 l

PLANT MANUAL SECTION: PROCEDUREN/ORK PLAN TITLE: NO:

, EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 7 of 15 I O' '

ARKANSAS NUCLEAR ONE lPAGE REVISION 2 DATE 6/29/81 CHANGE DATE 5.30 The Emergency Services Coordinator is responsible for problems which are not immediately related to plant operations, such as a fire or medical emergency. The plant Emergency Fire and Emergency Medical Teams report to him following activation of the Emergency Response Organination. The Emergency Services Coordinator should work closely with the Recovery Manager.

This position should be filled by the ANO Safety and Fire Prevention Coordinator.

5.31 The Site Office Services Coordinator is responsible for documentation ew 3 '.CA . M of. decisions and events, as well as word processing, drafting, main-taining files, etc., onsite.

This. position should be filled by the ANO Of fice Services Supervisor.

5.32 The Corporate Security Coordinator is responsible for security of the Arxansas Power & Light General Office and executives. He may also be required to implement security for AP&L community offices and far other plant sites.

This position should be filled by the Manager of Corporate Security.

(n)

'~' 5.33 The Communications Superintendent is responsible for releases of in-formation by Arkansas Power & Light. He should provide for recording discussions between the Incident Response Director and the Recovery Manager, the Nuclear Regulatory Commission, the Technical Support Manager, and the Support Superintendent. He shall then prepare in-formation from these discussions for release and obtain approval for release of any information from the Incident Response Director.

The Communications Superintendent, as the media spokesman for Arkansas Power & Light shall then deliver this information to the Governmental Advisory Coordinator and Utility Advisory Supervisor, and then to the TV, radio, had. press at interviews or conferences as scheduled by the Media Relations Coordinator. In the absence of the Communications Superintendent, the Media Relations Coordinator assumes his duties.

This position should be filled by the Vice President of Corporate Communications.

5.34 The Media Relations Coordinator is responsible for coordinating media requests for information or interviews, and for scheduling interviews, press conferences, etc., for the Communications Super- )

intendent. i l

~'

This position should be filled by the As..iw'. ant Manager of Communi-

/h cations.

u.Y l

l

l PLANT MANUAL SECTION: PROCEDUROWORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 l PAGE 8 of 15 '

C' ARKANSAS NUCLEAR ONE Revision 2 DATE s/29/8i s_/ CHANGE DATE 5.35 The Utility c.dvisory Supervisor is responsible for releasing informa-tion to Arkansas Power & Light employees, other utilities, and utility information service organizations such as Atomic Industrial Forum, Electric Power Research Institute, Edison Electric Institute, and the Institute of Nuclear Power Operations.

This position should be filled by the designated Communications Editor.

5.36 The Governmental Advisory Coordinator is responsible for assisting the Governmental Advisory Coordinator by informing the elected AA 244w- mofficials in the communities and counties in the area of the plant.

He is also responsible for ensuring that a representative of the l Arkansas Power & Light organization is dispatched to each principal offsite governmental emergency operations center (e.g., County Emergency Operations Center) to provide coordination with govern-mental groups. .

This position should be filled by the Director of Public Affairs.

5.37 The Local Advisory Supervisor is responsible for assisting the Govern-mental Advisory Coordinator by informing the elected officials of 73 the communities and counties in the area of the plant. He is also

(

responsible for ensuring that a representative of the Arkansas Power

& Light organization is available to each principal offsite govern-mental emergency operations center (e.g. County Emergency Operations Center) to provide assistance to the governmental groups.

1 This nosition should be filled by the Western District Manager. '

5.38 The Decision Secretary assists the Emergency Response Organi-zation in decision-making by summarizing alternatives and their consequences.

This position should be fihled.by the Director of Generation Technology.

5.39 The Planning and Scheduling Coordinator is responsible for pre-i parina schedules to coordinate and track the progress of Emergency I Resp ase Organiza ion activities in response co an incident.

This position should be assigned by the Support Superintendent.

rN (v)

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: N O.

, EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 9 of 15 Ig) 'd ARKANSAS NUCLEAR ONE REVISION 2 DATE 6/29/8i CHANGE DATE

6.0 DESCRIPTION

6.1 Changes to the division of responsibilities of the Emergency Response Organization as described in Section 5.0 may be made as necessary at the time of an incident with the approval of the Incident Response Director.

6.2 The locations from which the members of the Emergency Response Organi-zation are intended to normally function following an incident are identified in Attachment 3.

& . ;A % D6.3 :A matrix of responsibilities of the Emergency Response Organization versus position is provided in Attachment 4.

, 7.0 ATTACIDiENTS AND FORMS 7.1 Attachment 1 - Emergency. Response Organization 7.2 Attachment 2 - Initial Re ,ponse Organization 7.3 Attachment 3 - Primary Locations of Emergency Response Organization Members 7.4 Attachment 4 - Responsibilities Matrix for the Emergency Response Organization.

t.

l O

V

.rg p}

(

'%.}

?

t fg

' -.j

) -

L. ,

R

~

AP&L CORPORATE

~

c O 4

es .

MAN?.GEMENT gg m4

'O > > x M z w DECISION INCIDEhT ASSISTANTS TO THE

$ f.2 M $ >E SECRLTARY RESPONSE INCIDENT RESPONSE u) 9 K MZ $

DIRECTOR DIRECTOR Mb i

ob > Q p PIANNING & "

RECOVERY TECIINICAL i

E-g Z :-4m ya SCHED.SUPV. MANAGER SUPPOR'I SUPPORT sus. ~ > -4 MANAGER

[

p O z

I OPERATIG5'.; l I

MAINT.

I HP & CllEM.

I NUCLEAR & ENGR.

d COMMUNICATIONS PLANNING &l O MANAGER l MANAGER SUPT. SUPPORT SUPT. SUPT. - SCIIEDULINC Z i I I I I _ l COORD.

[ 3 O

OPERATIONS-SUPT.

I. & C.

SUPT. -

NUCLEAR SUPPORT -

MEDIA RELATIONS 10GISTICS &

PROCUREMENT FACILITIES MAINTENANCE b "2 3

M

.y.

SUPV. COORD. COORD. COORD.

F m x m L_

SHIFT OPERATIONS -

ELECT.

MAINT.

ONSITE MONITOR &

SITE ENGINEERING UTILITY FINANCIAL EMERGENCY k s5 Z g ADVISORY y QmA SERVICES SERVICES SUPV.

p. HP SITV. SUPV. SUPV. COORD. COORD.

x m DPERATORS MECH.

MAINT.

RADCHEM.

SUPV.

ENGINEERING GOVT. OFFICE SITE OFFICE $ b2 SUPT.

RESOURCES CGORD.

ADVISORY COORD.

SERVICES COORD.

SERVICES COORD.

2 ]

g g

A SHIFT CHEMISTRY l N

  • cn r LICENSING LOCAL SITE CORPORATE ADMINISTRATIVE SUPV. COORD. , ADVISORY SECURITY SECURITY O ASSISTANT lSUPV. COORD.

O E >"

> $ 0 $

(GGRD.

I z w m > g SHIFT i I I O g g DOSL PERSONNEL SITE EMERGENCY m z N TECHNICAI. -

ASSLSLMEMT ACCOUNTABILITY ACCESS CONTROL CENTEI< ,g fLIISOR SUPV. SUPV. SUPV. ACCESS SUPV. o a M O O Z m

~

RADWASTE OFFSITE O O COORDINATOR MONITORING SUPERVISOR D D m m s 2 m E

__ _.. s o s

CO W

- O

. PLANT MANUAL SECTION: PROCEDURElWORK PL AN TITLE: NO:

, EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 11 of 15 O .

AHKANSAS NUCLEAR ONE aEvisioN CHANGE 2 DATE DATE 6/29/81 ATTACIRIENT 2 Initial Response Organization i

Duty

. ;p. A c.; h f-yn '

, Emergency Coordinator Shift Shift Emergency Technical _3perations Response Advisor Supervisor Team Leaders O

i Shift Operations Emergency Administrative Staff Response Assistant Team Members

- - - - - - - Interface as appropriate O

l PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

EMERGENCY PUl? EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 12 of 15 O'V ARKANSAS NUCLEAR ONE aEvisiDN CHANGE 2 DATE 6/29/s1 DATE _ l 1

l ATTACHMENT 3 Page 1 of 2 <

Primary Locations of Members of the Emergency Response Organization NOTE: In the event the Onsite Technical Support Center or the Onsite Operations Support Center must be evacuated, personnel in these centers will be relocated to the Emergency Control Center.

%  %  % w

~ x%:.! "r  ? "-- z z .U U N N 8 8 55, ed 5 b 5

%  % wul gu gu O Mg a a H -H zu a zw OM ON w% w H 0:: wO g >wU H H  % h Aw k-POSITION TITLE 5E Ua

$E Ua d$

oe oOm wU

<o UwO Ops. Superintendent X X Shift Ops. Supervisor X X fm Shift Technical Advisor

  • X -

'v) f Shift Administrative Assistant X X Operations Personnel X X Recovery Manager X Maintenance Mana er X Operations Manager X Tech. Support Manager X IIP & Chemistry Superintendent X Nuclear & Engr. Support Superintendent X ,,

Dose Assessment Supervisor X Maintenance Superintendents X Nuclear Support Supervisor X Site Engineering Supervisor X i

Onsite Monitoring & HP Supervisor X Radchem. Supervisor (. X Chemistry Supervisor X Radwaste Coordinator X Emergency Services Cocrdinator X V Site Security Coordinator X Site Of fice Services Coordinator X ,

  • The Shift Technical Advisor functions in the Control Room of the affected Unit.

. PLANT MANUAL SECTION: PROCEDURETWORK PLAN TITLE: NO:

1

, EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 13 of 15 ID' ) ARKANSAS NUCLEAR ONE aEvisioN 2 DATE 6/29/81 CHANGE DATE ATTACIDIENT 3 Page 2 of 2 a

I 5 05 5 0 5 5  :=i e MG W t =

e e 80 Ed sd 8 30 a a "s s Wa a W5 e~ e" HE H5 se & C0"

.z,x. , m ., _

m.,.,  % Gt a2 ut 2a a2 ut Gt z, de ea ds

,g 5 5 ui arm POSITION TITLE uo uo om om wu <a uwo Recovery Team X Evacuation Team X

~

Fire Team X Medical Team X Onsite Radiological Monitoring X Section of the Radiation Team Incident Response Director (IRD) X Asst. to the Incident Response X Director Decision Secretary X Support Superintendent X Communications Superintendent X Media Relations Coordinator X Governmental AJ7isory Coordinator X Local Advisory Coordinator , - X ;4 Offsite Monitoring Section of the Radiation Team X Engineering Resources Coordinator X s Licensing Coordinator X Logistics & Procurement Coordinator X Corporate Security Coordinator X Financial Services Coordinator X Office Services Coordinator X Facilities Maintenance Coordinator X Utility Advisory Supervisor X

PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

. EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZ.iTION 1903.50 PAGE 14 of 15

(,,,) ARKANSAS NUCLEAR ONE _R EVISIO N 2 DATE 6/29/81 w-- CHANGE DATE ATTACHMENT 4 Page 1 of 2 Respansibilities Matrix for the Emergency Response Organization ACTIVITY RESPONSIBILITY A. Command and Control

1. Overall Incident Response Director
2. Corrective & Recovery Actions Recovery Manat,er

- J J fr . -seg ;43. -Offsite Radiological Monitoring Dose Assessment Supervisor 4, Engineering and Technical Technical Support Manager Support Activities

5. Non-technical Support Activities Support Superintendent
6. Communications Communications Superinten-dent B. Warning and Evacuation
1. Onsite Radiological Monitoring Onsite Monitoring and Health Physics Supervisor feg 2. Predicting Offsite Doses Dose Assessment Supervisor

() 3.

4.

Exclusion Area Evacuation Site Access Control Site Security Coordinator Site Security Coordinator

5. Notification of State and Local Incident Response Director /

Emergency Response Groups Recovery Manager

6. Liability Claims Financial Services Coordinator C. Communications
1. Communications with the NRC Incident Response Director
2. Communications with State Governmental Advisory Government Agencies ,
Coordinator . ; .,
3. Communications with Local Local Advisory Supervisor Government Agencies
4. Communications with other Utility Advisory Supervisor Utilities, EPRI, EEI, INPO, etc.
5. Communications with the Media Media Relatio'is Coordinator
6. Approval of Public Information Incident Response Director Releases D.

\__ J

. PLANT MANUAL SECTION: PROCEDUREAVORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 15 of 15 O

\_ /

ARKANSAS NUCLEAR ONE aevision CHANGE 2 caTE DATE 6/29/81 ATTACHMENT 4 (cont.) Page 2 of 2 ACTIVITY RESPONSIBILITY D. Emergency Facilities

1. Procurement Logistics & Procurement Coordinator
2. Maintenance Facility Maintenance Coordinator

, jty n ;3. Access Control Site Security Coordinator

4. Space Allocation Support Superintendent E. Emergency Services
1. Fire Fighting _ Emergency Services Coordinator
2. Medical Support Emergency Services Coordinator F. Engineerint Support s

) 1. Coordination with NSSS suppliers, Engineering Resources A/E's, vendors, consultants Coordinator

2. Onsite Engineering Support Site Engineering Supervisor
3. Nuclear Engineering and Analysis Nuclear Support Supervisor
4. General Office Engineering Nuclear & Engineering Support Superintendent
5. Design Records Site Office Services Coordinator G. Recovery and Corrective Actions
1. Planning , , Recovery Manager
2. . '. .

Equipment Manipalation Ops. Superintendent

3. Radwaste IIandling Radwaste Coordinator
4. Repairs Maintenance Manager and f Maintenance Superintenjents
5. Radiological Exposure Control Onsite Monitoring and s

llealth Physics Supervisor ll . Chemistry and Samp13 3

1. Primary Side Radiochemistry Supervisor
2. Secondary Side Chemistry Supervisor v

. -- x -

j, 7 ARKANSAS poi /GR & LIGHT COMPANY r,n, _r n s '., Arkansas Nuclear One o

) . mLE TRANSMITTAL l FORM NO. 1013.021I Arkansas Nuclear One Russellville, Arkansas Date Juiv 4 1981 MEMORANDUM TO: HOLDERS OF SERIES 2904 - MAGNITUDE OF RELEASE PROCEDURE - UNIT 2

, PROCEDURES 2904.01 - 2904.r

WhN& iOjk&Qc%y FROM: ' ANO DOCUMENT CONTROL

SUBJECT:

ANO MASTER PLANT MANUAL The procedures, revisions, permandn't changes, and/or temporary changes listed below have been / uld be / /placed in your set of the plant manual.

PROCEDURE # REV. # PERM. CHG. # TEMP. CIIG. # PROCEDURE TITLE A 2904.02 2 PC-1 Magnitude of Release - Unit 2 b

COPIES TO: '

w/o att: Word Processing b -

w/att: 1-Control Room - Unit 1 ' 78-ANO Library 3-Control Room - Unit 2 84-Emergency Planning Coord.

6-Ops. Manager 92-Training - NSC 10-Mgr. Special Projects 93-Ops. Tech 14-Plant Admin. Mgr. 100-NRC Region 19-Trng./Coun. Supv. 101-NRC Region 27-Engr./ Tech. Supp. Mgr. 102-NRC Region 28-Tech. Anal. Supt. 103-NRC Washington 29-HP Supt. 104-NRC Washington 32-HP Supervisor 105-NRC Washington 59-Admin. Copy - 2nd Floor 106-NRC Washington 62-Director of Nuclear Ops. 107-NRC Washington p 108-NRC Washingtcn

('j Updated 109-NRC Washington (INFO. ONLY)

Clerk 110-NRC Washington 19-Trng./Coun. Supv.

bdT1-NRC *iashington (Vandergrift) 112-NRC Washington 117-Mgr. Tech. Analysis

M ARKANSAS POWER & LIGHT COMPANY

_ Arkansas Nuclear One

(_/ MAGNITUDE OF RELEASE PROCE1'RE FORM 1000.CSA

, MAGNfTUDE OF RELEASE - UNIT 2

4. 2904.02 REV. 2 t,.

e i k U e'N5 RECORD OF CHANGES AND REVISIONS d PAGE' - REVISION CHANGE PAGE REVISION CHANGE PAGE REVISION CHANGE 1 1 20 0

~

2 1 21 0 3 1 22 0 4 2 PC-1 23 0 24

( 5 1 0 6 1 25 0 7 0 8 J ,

9 1 -

10 0 11 1 '

12 2 13 2 i 14 2 15 1 16 1 17 1 18 0 epyg ,

- - . ~ . . ,

Aee _ eA1E 9Nn s

o o PLANT M ANUAL SECTION: PROCEDURENVORK PL AN TITLC NO:

MAGNITUDE OF RELEA iE PROCEDURE MAGNITUDE OF RELEASE - UNIT 2 2904.02 PAGE 4 of 25

l. ARKANSAS NUCLEAR ONE Revision - 2 oATE CHANGE PC-1 DATE 3/25/81 6/26/81 Indication Allowable Deviation Wind Direction 120 degrees Wind Speed 120%

00 1 New Atmospheric Stability Category At i New Atmospheric Stability Category CPM 120%

Flow Rate 120%

B. When the data recorded changes more than the allowable deviation and a new projection is made on that data, identify the data by checking the parenthetic box "()"

in the top of that column on Form 2904.02A.

~m!,"

"* 8.'0

  • D,ATA 'C0lWERSION 8.1 Complete Form 2904.02B to determine the Pasquil Atmospheric Stability Category, wind speed and prevailing wind direction. If site meteoro-logical data is un-available, limited meteorological data may be ob-tained from the following groups:

NOTE: If the Pasquil Atmospheric Stability Category cannot be obtained, substitute in category G (most conservative).

8.1.1 NationalWeatherService(meteorologist-in-Charge)t_(( If

', o r

~

or ,(recording)].

' )'

8.1.2 KARV Radio s .

8.1.3 MSS Dispatcher.

8.2 Complete Form 2904.02C to determine the gaseous release rate.

9.0 DETERMINATION OF DOSE RATE AND MAXIMUM PERT!ISSIBLE CONCENTRATION AT THE EXCLUSION AREA BOUNDARY >

9.1 Complete Form 2904.02D to calculate the following information:

9.1.1 Whole body dose rate at the Exclusion Area Boundary.

9.1.2 ChildthyroiddoIgrhte'at the Exclusion Area Boundary.

9.1.3 The ratio of the actual to the maxic.ami permissible concen-tration of Xe-133.

9.2 Summarize the results of the projected whole body and child thyroid dose _ rates and the ratio of maximum permissible concentration de-terminations on Form 2904.02E, specifying a downwind distance of 0.65 miles.

9.3 If an Emergency Action Level is NOT indicated, return to Section 7.0.

New data should be taken as specified by the Duty Emergency Coordina-tor.

I 9.4 If an Emergency Action Level is declared (initial projection only),

identify the meteorological and effluent monitor data on Form 2904.02A which was used in making the projection by checking the parenthetic i box "()" at the top of that column.

1

5

,'];7 ARKANShS 10WER & LIGi-iT COMPANY c r. tr Arkansas Nuclear One nmt.d a TITLE:

TRANSMITTAL l FORM NO. 1013.02H Arkansas Nuclear One Russellville, Arkansas Date Julv 2. 1981 .

MEMORANDUM -

TO: HOLDERS OF SERIES 1903 - EMERGENCY PLAN PROCEDURES 1903.01 - 1903.xx FROM: ANO DOCUMENT CONTROL

SUBJECT:

ANO MASTER PLANT MANUAL The procedures, revisions, permanent changes, and/or temporary changes listed below have been / L. Nhould be / /placed in your set of the plant manual.

PROCEDURE # REV. # PERM. CHG. # TEMP. CHG. # PROCEDURE TITLE Q, 1903.30 1 Plant Evacuation 1901.31 1 Exclusion Area Evacuation 1903.70 1 Russellville Fire Department COPIES TO:

w/o att: Word Processing 78-ANO Library w/att: *1-Control Room - Unit 1 81-Burns Sup2rvisor

  • 3-Control Room - Unit 2 82-Guardhouse 6-Ops. Manager 84-Emergency Planning Coord.

10-Mgr. of Special Projects 88-Auxiliary Operatcrs - Unit 1 14-Plant Admin. Mgr. 92-Trng. - NSC 17-Human Resources Supv. 93-Ops. Tech.

19-Trng./Coun. Supv. 96-Remote Shutdown Panel - Unit 1 25-Security Coordinator 97-Remote Shutdown Panci - Unit 2 27-Engr./ Tech. Supp. Mgr. 100-NRC Region 28-Technical Anal, Supt. 101-NRL Region 29-Health Physics Suot. 102-NRC Region 32-Health Physics Suov. 103-NRC Washington 110-NRC Washington

'O 35-Chem./Env. Supv. 104-NRC Washington L&if-NRC Washington 48-Planning & Scheduline 105-NRC Washington 112-NRC Washington

,. *59-Admin. Copy - 2nd Floor 106-NRC vashington 115-Auxiliary Ops.-Unit :

72-Security Trng. Supv. 107-NRC Washington 117 Mgr. Tech. Analysis Updated 108-NRC Washington (INFO ONLY)

Clerk 109-NRC Fashington 19-Trng. Coun. Supv.

(Vandergrift)

p.

/p ARKANSAS POWER & LIGHT COMPANY

's Immme Arkansas Nuclear One EMERGENCY PLAN FORM 10CO.CEA PLANT EVACUATION sANg_

1903.30 REV. 1 b ,(

ik'e.

s w ju ft ,

y f; hok ""6SI , o3'

//

NE% i  ! E a h:

a auau m,f'?fl(?da uu;9 73; rr

\. -

(.gj  ? RECORD OF CHANGES AND REVISIONS O PAGE PEVIS!ON CHANGE PAGE REVISION CHANGE PAGE REVISION CHANGE 1 1 2 1 3 1 4 1 l 5 1 0

O APPROV D BY p APPROVAL DATE g- -

<es ..m.~.ee., <

7/3/#/

l s

. l l

l PLANT MANUAL SECTION: PROCEDURUNORK PLAN TITLE: NO:

EMERGENCY PLAN PLANT EVACUATION 1903.30

["

  • PAGE 1 of 5 U ARKANSAS NUCLEAR ONE aevisioN i oAre 6/isfai CHANGE DATE 1.0 PURPOSE The purpose of this procedure is to provide the symptoms for which a Plant Evacuation should be declared and the subsequent actions to be taken by plant personnel.

2.0 SCOPE This procedure is applicable to emergency situations involving Unit One' and/or Unit Two.

3.0 REFERENCES

3.1 References Used in Procedure Preparation:

3.1.1 Arkansas Nuclear One Emergency Plan 3.2 References Used in Conjunction with this Procedure:

I 3.2.1 1903.10, " Emergency Action Level Response" gs 3.3 Related ANO Procedures:

L]

3.3.1 1903.23, " Personnel Emergency" 3.3.2 1903.40, " Duties of the 3mergency Evacuation Team" 4.0 DEFINITIONS 4.1 A Plant Evacuation is the orderly withdrawal of all personnel from the protected area except those personnel required to respond to the situation.

4.2 Tne Protected Area is the area encompassed by physical barriers and to which access is controlled (i.e., the security fence).

4.3 Onsite Technical Support Center - The location within the ANO Admin-istration Building equipped with instrumentation and communication systems and facilities useful in monitoring the course of an accident; this center is located in the 4th floor Planning & Scheduling area.

4.4 Onsite Operational Support Center - the ANO Administration Building; the normal work location for an individual is used as the initial reporting area in this center with the following exceptions:

4.4.1 Planning & Scheduling Supervisor - Fourth Floor Conference Room.

() 4.4.2 Radwaste Coordinator - individual's supervisor's office in the Administration Building.

l

PLANT MANUAL SECTION: PROCEDUP.E/ WORK PLAN TITLE: NO:

_, EMFRGENCY PLAN PLANT EVACUATION 1903.30

(~3

  • PAGE 2 of 5 U ARKANSAS NUCLEAR ONE aEvisioN 1 care 6/isfai CHANGE DATE 4.4.3 Emergency Team Personnel A. Evacuation-Main Guard 5*,ation (Material Management Personnel); Emergency Control Center [ Secondary Operational Support Center (Training Personnel)].

B. Fire - 2nd floor conference room C. Medical - First Aid Room /'ad floor break room -

D. Radiation - (r..uite team) 1st floor classroom (and adjacent offi esi E. Recovery - same as 4.4.3.D 4.4.4 Operations Personnel - Operations Manager's office 5.0 RESPONSIBILITIES 5.1 The affected unit's Shift Operations Supervisor is responsible for declaring a Plant Evacuation when any of the symptoms contained in 73 Section 6.0 occur.

V 5.2 The Duty Emergency Coordinator is responsible for coordinating activities associated with a Plant Evacuation (to include informing the Duty Emergency Coordinator / Recovery Manager of personnel account-ability results).

5.3 Security Personnel are responsible for evacuation and personnel account-ability following a Plant Evacuation.

5.4 The Emergency Evacuation Team is responsible for assisting Security Personnel (as directed) in evacuation and personnel accountability; the Materials Management personnel may assist with assigned duties onsite, as necessary; the Training personnel may assist with assigned duties off-site, as necessary.

5.5 The Emergency Medical Team is responsible for aiding and decontaminating injured personnel identified during a Plant Evacuation.

6.0 SYMPTOMS 6.1 Unevaluated general area radiation levels exceeding 2.5 mrem /hr outside of the controlled access areas which are not attributed to any cause other than a possible radiological incident.

6.2 Unevaluated airborne radioactivity in excess of 1 x 10 -9 pCi/cc measured outside of the controlled access areas.

b

6.3 An uncontrolled toxic gas leak where the hazard is not confined to a local area and the conditions continue to increase in severity.

. m PLANT M ANUAL SECTION: PROCEDUP,EtNORK PLAN TITLE: !40: I EMERGENCY PLAN PLANT EVACUATION 1903.30

m. PAGE 3 of 5 U ARKANSAS NUCLEAR ONE aevisioN CHANGE 1 oaTE DATE 6/1sfai 7.0 IMMEDIATE ACTIONS 7.1 Any person who identifies any of the emergency conditions descrioed in Section 6.0 shall notify the affected unit's Shift Operations Supervasor immediately.

7.2 Upon verification, the Shift Opera'. tons Supervisor shall contact, by the most expedient snins, the following groups, as necessary, and provide them with designated assembly area, evacuation route (s-)

(based upon symptoms and prevailing wind direction) and protective measures, as necessary:

7.2.1 Main Guard Station 7.2.2 Emergency Evacuation Team NOTE: The evacuation announcement should include evacuation routes and designated assembly area (*.his announcement should be repeated several times, if possible).

7.3 The Shift Operations Supervisor shall declare a Plant Evacuation over 7s the Public Address System and sound the plant evacuation alarm.

t /

7.4 Shift Operationc Personnel on duty should report to the Control Room.

8.0 FOLLOW UP ACTIONS 8.1 Determine if any Emergency Action Level criteria have been exceeded.

(Refer to 1903.10, " Emergency Action Level Response").

8.2 Shift Operations personnel which are onsite but not on duty should 4

report to the Control Room from the appropriate response center.

8.3 Personnel other than Shift Operations Personnel in the Controlled Access Areas shall proceed to the Controlled Access points and monitor themselves, if possible, prior to exiting.

I 8.4 Security / Emergency Evacuation Team personnel should take the following actions:

8.4.1 At. sign personnel to perform the following tasks:

A. Advise exiting personnel of the designated evacuatior.

l routes and assembly areas.

l B. Direct personnel to the designated assembly area.

C. Advise (by the most expedient means) non-ANO personnel

(\~')

within the affected portions of the Exclusion Area to evacuate.

6

PLANT MANUAL SECTION: PROCEDUREN/ORK PLAN TITLE: NO: l

' l EMERGENCY PLAN PLANT EVACUATION 1903.30 1

'N' PAGE 4 of 5

[V ARKANSAS NUCLEAR ONE asvisics i o*TE 6f15/81  :

' CHANG 4 DATE D. Set up road Llocks to limit access to the plant site.

E. Provide security, as necessary, at the designated assembly area.

8.4.2 Security personnel shall, upon ANO personnel clearing each applicable area, lock up their post, as necessary, and then assemble at the Main Guard Station (or as directed) for '

further instructions.

8.5 Personnel other than the emergency response personnel shall proceed to their respective Guard House and then to the designated assembly area (the Emergency Control Center unless directed otherwise).

8.6 Emergency response personnel shall report to their pre-assigned I, assembly areas unless directed otherwise. A list of reporting individuals should be provided to the Technical Support Center for accountability purposes (refer to 1903.10, Attachments 1-8 for the applicable rosters, as necessary).

8.7 Security / Evacuation Team personnel shall account for personnel re-

,ew maining onsite by the most expedient means available and report the

(_) accountability results to the Technical Support Center as soon as it is complete.

8.8 When the plant is determined to have returned to a condition where the Plant Evacuation is no longer required, the Duty Emergency Coordinator may terminate the Plant Evacuation.

9.0 EVACUATION OF TIIE ONSITE TECllNICAL SUPPORT CENTER AND OPERATIONAL SUPPORT CENTER The Onsite Technical Support Center and the Onsite Operational Center are not evacuated in the event of a Plant Evacuation. The Onsite Radiological Monitoring Section shall monitor radiation levels while the centers remain occupied. However, if the following symptoms are observed, actions shall be taken in accordance with Section 9.2 and 9.3.

9.1 Symptoms 9.1.1 Area radiation monitor alarm indicates radiation levels above 2.5 mR/hr.

9.1.2 NMC alarm indicating particulate airborne of 450 CPM above background or gaseous airborne of 10 CPM above background.

(Assuming installed iodine cartridges are removed and analyzed every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.)

V

. e e

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE- NO:

EMERGENCY PLAN PLANT FVACUATION 1903.30

/~h'

" PAGE 5 of 5 ARKANSAS NUCLEAR ONE arv3 ion CHANGE i oATE 6/isesi ; ,

DATE j 9.2 Immediate Action 9.2.1 Notify the Duty Emergency Coordinator / Recovery Manager of the above alarms.

9.3 Follow-Up Actions I 9.3.1 The Onsite Radiologrcal Monitoring Section shall increase surveillance of NMC and iodine cartridge to once per hour.

9.3.2 Reset Area Monitor alarm to 100 mR/hr and evaluate pro-jected personnel accumulated dose rates versus projected stay time at those levels.

NOTE: Necessary respiratory protection equipment should be obtained from the Onsite Radiological Monitoring Section of the Emergenc3 Radiation Team.

9.3.3 If the iodine concentration exceeds 1x10' pCi/ce, re-spiratory protection or evacuation is required. 3 g-) 9.3.4 If the radiation level is greater than ICE mR/hr but less (m,/ than 1 R/hr:

A. 30 minutes may be allowed to determine if it is a temporary conoition or a long-term condition.

B. If it is determined that a temporary condition exists, evaluate the projected personnel accumulated dose.

C. If it is determined that a long-term condition exists, evacuation of the Onsite Technical Support Center and Operational Support Center will be required.

9.3.5 If radiation levels reach 1 R/hr, immediate evacuation of the Onsite Technical Support Center and Operational Support Center is required.

9.3.6 If the Technical / Operational Support Centers are evacuated, Security personnel shall take the following actions:

A. Lock the entrances to the plant.

B. Dispatch Security officers, as necessary, to the Control Room to aid in access control to the plant.

C. Set up security posts, as necessary, to control access s to the plant area.

) -

J t 10.0 ATTACl[MENTS AND FORMS , f 4 i

None '

9t ARKANSAS POWER & LIGHT COMPANY 3, Arkansas Nuclear One O s i

FORM 1CCO.06A DIEP{CJi'LAN cx EXCLUSION AREA EVACUATION .

t; 1903.31 REV. 1 .?

+% %dhr$,2

%zWh3" u%f~

.' s .,s i

1

~ ~

t ,q i :I c I { /

_w ae -

p x:

W>h RECORD OF CHANGES AND REVISIONS g PAGE REVISION CHANGE PA GE REVISION CHANGE PAGE REVISION CHANGE 1 1 2 1 3 1 0 5 O

^""" ""9/ d'O

, ,u~..,,~..,

4 m

/

^""F,"'///

s

PLANT M ANdAt SECTION: PROCEDUREN10RK PLAN TITLE: NO:

EMERGENCY PLAN 1_ EXCLUSION AREA EVACUATION 1903.31

/,.h*

3 PAGE 1 of 3

'J ARKANSAS NUCLEAR ONE aevisioN ~~ t DATE CHANGE DATE 6/17/81 l

1.0 PURPOSE The purpose of this procedure is to provide the symptoms for which an Exclusion Area Evacuation should be declared and the subsequent actions to be taken by plant personnel.

2.0 SCOPE This procedure is applicable to emergency situations involving Unit One*

anh or Unit Two.

3.0 REFERENCES

3.1 References Used in Procedure Preparation:

3.1.1 Arkansas Nuclear One Emergency Plan.

3.2 References Used in Conjunction with this Procedure:

3.2.1 1903.10, " Emergency Action Level Response"

(")

y 3.3 Related ANO Procedures:

3.3.1 1903.40, " Duties of the Emergency Evacuation Team" 3.3.2 1903.30, " Plant Evacuation" 4.0 DEFINITION 4.1 An Exclusion Area Evacuation is the orderly withdrawal of personnel from that portion of the Exclusion Area which is affected by an emergency condition as described in Section 6.0.

4.2 The Exclusion Area is that area surrounding ANO within a minimum radius of 0.65 miles of the reactor buildings and controlled to the extent necessary Sy AP&L during periods of emergency.

5.0 RESPONSIBILITIES 5.1 The affected unit's Shift Operations Supervisor is responsible for declaring an Exclusion Area Evacuation when any of the symptoms contained in Section 6.0 occur. The Duty Emergency Coordinator /

Recovery Manager is responsible for declaration if the Emergency Response Organization has been activated.

O

\_/

  • .. s PLANT M ANUAL SECTiON: PROCEDURE / WORK PLAN TITLE: NO:

~~

EMERGENCY PLAN EXCLUSION AREA EVACi'JsTION 1903.31

/ ** r O ARKANSAS NUCLEAR ONE PAGE aEvisiON 2 of 3 1 DATE 6/17/81 CHANGE DATE 5.2 The Duty Emergency Coordinator / Recovery Manager is responsible for coordinating emergency-related activities follering the declaration of an Exclusion Area Evacuation.

5.3 Set rity Personnel are responsible for evacuation and persc nnel

n. countability following an Exclusion Area Evacuation.

5.4 The Emergency Evacuation Team is responsible for assisting Security personnel as directed in evacuation and personnel accountability.

5.5 The Emergency Medical Team is responsible for decontaminating and aiding injured contaminated personnel identified during an Exclusion Area Evacuation.

6.0 SYMPTOMS 6.1 An Exclusion Area Evacuation will be initiated if it is determined that personnel within the Exclusion Area could:

6.1.1 Receive a whole body dose of 0.5 Rem or a thyroid dose of 1.0 Rem (over a period of 12 months as a result of the

) incident).

(~/

x-  ;

6.1.2 Receive an exposure to a toxic gas.

7.0 IMMEDIATE ACTIONS 7.1 Any person who ident.i fies any of the emergency conditions described in Section 6.0 should notify the affected unit's Shift Operations Supervisor.

7.2 Upon verification, the Shift Operations Supervisor shall contact by the most expedient means the following groups, as necessary, and pro-vide them with Designated Assembly Area, Evacuation Route (s) (based upon symptoms and prevailing wind lirection) and protective measures, as necessary:

7.2.1 Main Guard Station.

7.2.2 Emergency Evacuation Team (if onsite).

NOTE: The evacuation announcement should include evacuation routes and designated assembly area.

7.3 The Shif t tyerat. ions Supervisor shall declare an Exclusion Area Evacuatioa over the public address system (and sound the plant evacuation alarn, as necessary).

p

\.

.4,,

PLANT M ANUAt SECTION: PROCEDURE! WORK PLAN TITLE: NO:

EMERGENCY PLAN EXCLUSION AREA EVACUATION 1903.31

/ j' PAGE 3 ci 3

'" ARKANSAS NUCLEAR ONE aEvisiON 1 DATE 6/17/8i CHANGE DATE 7.4 Shif t Operations personnel on duty should report te the Control Room.

8.0 FOLLOW-UP ACTIONS 8.1 Detcrmine if any Emergency Action i.evel criteria have been exceeded (Refer to 1903.10, " Emergency Action T.evel Response").

8.2 Shift Operations Personnel which are onsite but not on duty should-report to the Control Room from the appropriate response center.

8.3 Security / Evacuation Personnel shall direct personnel within the  !

affected areas to evacuate and, if necessary, proceed to the de-signated assembly area (normally, the Emergency Control Center).

Evecaateo plant personnel should remain at the assembly area for personnel accountability and monitoring, as necessary, until further instructions are received (visitors should be requested to remai1 for monitoring and/or to receive further instructions).

8.4 If additional emergency response personne' are required, they should be contacted, as needed, by the most expeuient means avai:ac' le and pg provided with a description of the situation and required response.

8.5 When the plant conditions are determined tc. have returned to a condition where the Exclusion Area Evacuation is no longer required, the Duty Emergency Coordinator / Recovery Manager may terminate the Exclusion Area Evacuation.

9.0 ATTACHMENTS AND FORMS None

^

f '

l N.))

1 l

l I

l l

7 ARKANSAS POWER & LIGHT COMPANY

! '/ .

Arkansas Nuclear One j

O. EMERGENCY PLAN PROCEDURE FORM 1000 06A l , 'i- RUSSEL1VILLE FIRE DEPARTMENT

\

l 1903.70 Rev. 1 i b[Qhyf(S'd O

<cA C^n%>

j ' k$j'A yr

'\

< e c [k;- el lq - if S?p. M/ #

@ ?' ,f3

~

3

'J NOC:mi.,r,,i..:]..;.w;D ddd GU2nad ;d 7 ,r,,/[f Ao ,l s rl

{ W

] RECORD OF CHANGES AND REVISIONS j PAGE REVISION CHANGE PAGE REVISION CHANGE PAGE REVISION CHANGE j 1 1 2 1 1

O i

l i

}

}

i 4

l.

O APPROVED BP 8g h, $U APPROVAL CATE 7fe/8/

/ - tv..,

v N h,

  • PLANT M ANUAL SECTION: PBOCEDU8E/ WORK PLAN TITLE: NO:

EMERGENCY PLAN RUSSELLVILLE FIRE DEPARTHENT 19C3.70 PAGE 1 of 2

) ARKANSAS NUCLEAR ONE aEvisioN t oATE 6/23/81 g CHANGE DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the Emergency Plan related response of the Russellville Fire Department should their assis-tance be required at Arkansas Nuclear One.

2.0 SCOPE This procedure is applicable to emergency situations requiring offsite -

firefighting assistance.

3.0 REFERENCES

3.1 References Used in Procedure Preparation:

3.1.1 State of Arkansas Emergency Operations Plan, Annex V -

Arkansas Nuclear One Radiological Incident Response Plan.

3.1.2 Arkansas Nuclear One Emergency Pl*.u.

3.1.3 Letter of Agreement between the Russellville Fire Department and Arkansas Power & Light Company -

3.2 References Used in Conjunction with this Procedure:

3.2.1 Pre-Fire Plans 3.3 Related ANO Procedures:

3.3.1 1903.22, " Fire or Explosion".

4.0 DEFINITIONS None 5.0 INSTRUCTIONS 5.1 Should the assistance of the Russellville Fire Dep3-tment be required at Arkansas Nuclear One, the Russellville Fire Department shall be called at 1

5.2 Provide the Fire Department with the following information, if known:  ;

l l 5.2.1 Description of the fire 5.2.2 Location of the fire 5.2.3 Number of applicable pre-fire plan, if known

~)

5.2.4 Access point, if other than the North Gate

^ '

PLANT MANUAL SECTION:

PROCEDU'1E/ WORK PLAN TITLE: NO:

EMERGENCY PLAN RUSSELLVILLE FIRE DEPARTMENT 1903.70

) F ARKANSAS NUCLEAR ONE PAGE

Revision CHANGE 2 of 2 1 DATE 6/23/8r DATE 5.3 The Russellville Fire Department may verify the authenticity of the request by calling the applicable Arkansas Nuclear One Control Room:

5 3.1 Unit One ,~~~ \~

l 5.3.2 Unit Two -! i l __i 5.4 On arrivtag, the Russellville Fire Department should report to the North Cate, unless otherwise instructed. -

5.5 Notify Security that the Russellville Fire Department has been called and inform them of the proper access point. Security guards should meet the fire trucks and escort them through the plant gates and to the scena of the fire.

5.6 At the scene of the fire, the Russe 11viile Fire Department shall coordinate its activities with the AND Emergency Fire Tcam Leader.

In the absence of the Emergency Fire Team Leader, the Fire Department shall request and coordinate the support of other fire departments.

5.7 If the Russellville Fire Department and ANO personnel require f arther assistance to fight a fire, the Russellville Fire Department saould request and coordinate the support of other fire departments.

5.8 If a fire occurs in a radiation area, ANO personnel trained in radie ~ on protection shall be available to assist the fire-fighting personnel. Fire-fighters should follow the instructions given by these ANO personnel for their protection.

6.0 ATTACPf!ENTS AND FORMS None l

w

^"

,(;7 ARKANSAS i30\NER & LIGHT COMPANY

'a tr nr.mg$ Aricansas Nuclear One

/mC j inte TRANSMITTAL l FORM No. 1013.02H Arkansas Nuclear One Russellville, Arkansas Date June 30, 1981 .

MEMORANDUM -

l TO HOLDERS OF SERIES 1903 ~ - EMERCENCY PLAN PROCEDURES 1903.01 - 1903.xx FROM: ANO DOCUMENT CONTROL

SUBJECT:

ANO MASTER PLANT MANUAL c.-

The procedures, revisions, permanent changes, and/or temporary changes listed

~ ~

below have been / "'7should be / /placed in your set of the plant manual.

PROCEDURE # REV. # PERM. CHG. # TEMP. CHG. # PROCEDURE TITLE 1903.10 2 Emergency Action Level Response U,-y(,

COPIES TO:

w/o att: Word Processing 78-ANO Library w/att: *l-Control Room - Unit 1 81-Burns Supervisor

  • 3-Control Room - Unit 2 82-Guardhouse 6-Ops. Manager d4-Emergency Planning Coord, 10-Mgr. of Special Pro jects 88-Auxiliarv Duerators - Unit 1 14-Plant Admin. Mgr. 92-Trng. - USC 17-Human Resources Supv. 93-Ops. Tech.

19-Trng./Coun. Supv. 96-Remote Shutdown Panel - Unit 1 25-Security Coordinator 97-Remote Shutdown Panel - Unit 2 27-Engr./ Tech. Supp. Mgr. 100-NRC Region 28-Technical Anal. Supt. 101-NRC Region i

l 29-Health Physics Suot. 102-NRC Region l 32-Health Physics Suov. 103-NRC Was51ngtor 110-NRC Washington 35-Chem./Env. Supv. 104-NRC Wat'aington vati-NRC Washing, con

)

k'_i 48-Planning & Scheduling 105-NRC Was.11ngtnu 112-NRC Washington

, . *59-Admin. Copy - 2nd Floor 106-NRC uasaington 115-Auxiliary Ops.-Unit 2 72-Security Trng. Supv. 107-NRC Washington ll7 Mgr. Tech. Analysis Updated 108-NRC Washington Clerk 109-NRC Washington (INFO ONLY) 10-Trng. Coun. Supv.

[Vandergrift)

ARKANSAS POWER & LIGHT COMPANY

' Ark *ansas Nuclear One sEMERGENCY PLAN PROCEDURE FORM 1000.06A c:%

%(lf,4p EMERGENCY ACTION LEVEL RESPONSE Page 1 of 2

^J WD 1993.10 REV. 2 hs

.Qygp%%

x, '

. 3 ,

k

( c& ' .N'*

a e i RECORD OF CHANGES AND REVISIONS PAGE REVISION CHANGE PAGE REVISION CHANGE PAGE REVISION CHANGE 1 2 19 2 37 2 2 2 20 2 38 2 3 2 21 2 39 2 4 2 22 2 40 2 5 2 23 2 41 2 l

f'1 V I 6 2 24 2 42 2 7 2 25 2 43 2 8 2 26 2 44 2 9 2 27 2 45 2 10 2 28 2 46 2 31 2 29 2 47 2 12 2 30 2 48 2 13 -  ? 31 2 49 2 14 2 32 2 50 2 15 2 33 2 51 2 16 2 34 2 52 2 17 2 35 2 53 2 18 2 36 2 54 2 e

APPROVED BY;0 P O K!?nd A4ch1 APPROVAL DATE /4 ri < ,ct~,m o4~.ccm g;j';f/g/A7/

v N

ARKANSAS POWER & LIGHT COMPANY h

Iw

' Arkansas Nuclear One j (3 '

D EMERCENCY PLX4 PROCEDURE FORM 1000.06A EMERGENCY ACTION LEVEL RESPONSE Page 2 of 2 fg 1903.10 FEV. 2 1p:.

@9)Y yp d.fc , / 9 hehil]UIfi3f((h } $dl]}: N ///

3

, Q g'; ,p RECORD OF CHANGES AND REVISIONS MPAGE REVISION CHANGE ' PAGE REVISION CHANGE PAGE REVISION CHANGE 55 2 56 2 57 2 58 2 4

59 2 O 60 2 61 2 O

E no-g 9 ,9 g g 3 ,

u -

_.w. - ,

A av;A v/ r/

7-2 s

    • PLANT MANUAL SECTION: PROCEDUREN/ORK PLAN TITLE: NO:

I FMFDCFMcV PTAM a FWRGENCY ACliUN LEVEL RESPONSE 1903.10

[m u PAGE 1 of 61 c5'm ARKANSAS NUCLEAR ~ ONE O. acwsmN _2 one CHANGE 08/10/81 DATE 1.0 PURPOSE This procedure defines conditions requiring respense, delineates responsi-bilities for action and establishes required actions for each of four "Emer-gency Action Levels (EAL's)".

2.0 SCOPE This procedure is applicable to Units 1 and 2 in all modes; it does not in-clude specific plant casualty procedures or systems operations requirements, but rather provides administrative processes only. ,

This procedure describes actions for events which meet the criteria for the Emergency Action Leveh only.

3.0 DESCRIPTION

3.1 This procedure is divided in four sections arranged in order of in-creasing severity, each defining and setting response requirements for individual EAL's. Each section is broken down into four subsections which include EAL classification criteria, personnel responsibilities and required actions, termination or escalation guidance and applicable p forms.

. \j 3.2 This procedure is divided into the following sections:

SECTION TITLE PAGE 3.2.1 6.0 Ucusual Event 4 3.2.2 7.0 Alert 14 3.2.3 8.0 Site Emergency 25- .

3.2.4 9.0 General Emergency 38

4.0 REFERENCES

4.1 References Used in Procedure Preparation:

4.1.1 Arkansas Nuclear One Emergency Plan 4.2 References Used in Conjunction with this Procedure:

4.2.1 1903.32, " Area Evacuation" 4.2.2 1904.02(2904.02), " Magnitude of Release - Unit 1 (2)"

O -

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 i PAGE 20161 Og -

ARKANSAS NUCLEAR ONE aEvisioN 2 oArE oefiofs1 CHANGE DATE 4.3 Related ANO Procedures:

4.3.1 1043.06, " Bomb Threat" 4.3.2 1202.40, " Refueling Accidents" 4.3.3 1202.44, " Natural Emergencies" 4.3.4 1903.20, " Toxic Gas Release"

  • 4.3.5 1903.21, "Arkla Natural Gas Line Rupture" 4.3.6 1903.22, " Fire or Explosion" 4.3.7 1903.23, " Personnel Emergency" 4.3.8 1903.40, " Duties of the Emergency Evacuation Team" 4.3.9 1903.41, " Duties of the Emergency Fire Team" 4.3.10 1903.42, " Duties of the Emergency Medical Team" rx 4.3.11 1903.43, " Duties of the Emergency Radiation Team" U M 5.0 DEFINITIONS 5.1 Emergency Action Levels (EAL's) - A system of classification of unusual or emergency situations which categorizes the spectrum of possible emer-gency situations into four groups. Each classification is associated with a particular set of actions to be taken to cope with the situa-tions included in that classification. The emergency action levels are graded to allow a situation to be escalated or de-escalated from one level to another should the severity of the situation change. The four emergency action levels are:

Unusaal Event Alert Site Emergency General Emergency 5.2 Unusual Event - This is the least severe of the four Emergency Action Levels. It includes thore situations which, unless complicated by ou 1r factors, pose no haca to the public but for which contact is estaoiished with state and federal officials to provide th.-m with current information on unusual events which are occuring or have occurred at ANO. Typically these situations are brought under control  :

and terminated in less time than it takes to activate the emergency response organization. One of the purposes for this Emergency Action 7-(_j Level is to provide a random, unscheduled test of the communication j link hetween the plant and state and federal officials.

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN ' s EMERGENCY AJTION LEVEL RESPONSE 1903.10

  • ~

y PAGE 3 of 61 O ARKANSAS NUCLEAR ONE _ REVISION CHANGE 2 DATE DATE 06/10/81 5.3 Alert - This Emergency Action Level includes those situaticns for which plant, state and federal cfficia!L are notified in order to assure that emergency persornel are available to respond should the situation be-come more serious. These situatio..s, unless upgraded to a more severe Emergency Action Level, pose no harm to the public but confirmatory radiation monitoring by the state may be desired in orec to vegify that no harm has occurred.

5.4 Site Emergency - This Emergency Action Level includes these situations for which plant, state and federal officials are mobiliz.ed so that emer-gency response centers are man:ted, and personnel required for evacuation of near site areas are available should the situat4cn become more serious. Situations classified under the Site Ener3cacy Action Javel should also be those for which it is prudent to prsvide early warning to the population within the Emergency Planning Zone so they may be in a state of readiness should the situation become more serious.

5.5 Gegyv.11 Emergency - This is the most severe of the f our Emergency Action Levels. This Emergency Action Level includes chose situations for which plant, state'and federal officials are notified so they may take predetermined protective actions, such as sheltering or evacuation of the public, in order to minimize the potential for radiological 7s exposure of the public. For these situations, early warning is pro-(j vided to the population within the Emergency Planning Zone so they may be ready to take protective action.

5.6 Emergency Planning Zcue (EPZ) - The EPZ considered by this procedure is the Inhalation Zone - that area within approxicately a 10 mile radius of ANO.

5.7 Onsite - The area within the Exclusion Area Boundary.

5.8 Offsite - Those areas not covered by Section 5.7.

5.9 Onsite Technical Support Center - The location within the ANO Admin-istration Building equipped with instrumentation and communication sys-tems and facilities useful in monitoring the course of an accident; this center is located in the 4th floor Planning & Scheduling area.

5.10 Onsite Operational Support Center - The ANO Administration Building; the normal work lacation for an individual is used as the reporting area in this center with the following exceptions:

5.10.1 Planning & Scheduling Supervisor - Fourth Floor Conference Room 5.10.2 Radwaste Coordinator - individual's supervisor's office in the Administration Building.

p

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN s EMERGENCY ACTION LEVEL RESPONSE 1903.10

-s PAGE 4 of 61 U ARKANSAS NUCLEAR ONE TevisioN CHANGE 2 oATE DATE 08/10/81 5.10.3 Emergency Team Personnel A. Evacuation - Main Guard Station (Material Management Personnel); Emergency Control Center [ Secondary Operational Support Center (Training Personnel)]

B. Fire - 2nd floor conference room C. Medical - First Aid Room /2nd floor break room '

D. Radiation - (onsite team) 1st floor classroom (and adjacent offices)

E. Recovery - same as 5.10.3.D 6.0 UNUSUAL EVENT 6.1 Classification Criteria 6.1.1 Projected summed releases from either unit exceed IMPC for one hour at the site boundary assuming annual average X/Q and actual wind speed.

/~s

() 6.1.2 Abnormal RCS Conditions:

A. Margin to saturation of the ACS as indicated on margin-to-saturation meters or as calculated is less than 20 F for greater than 5 minutes.

D. RCS steady-state I dose equivalent activity in excess of the allow 3ble Technical Specification limit.

C. Failure of the pressurizer relief valve to re-close after lifting.

D. Plant transients which result in emergency core cooling systems actuation.

I 6.1.3 Ongoing security compromise on site, but outside the Protected Area Security Fence. Attempted entry or sabotage which has been stopped before an Alert, Site Emergency or General Emer- l gency can be declared. l 6.1.4 Rapid depressurization of the steam generator secondary sys-tem which results in automatic steam generator secondary l isolation.

o)

[

PLANT MANUAL SECTION: PROCEDUREN/ORK PLAN TITLE: NO:

EMEFGENCY PLAN EMERGENCY ACTION LEVEL REE20NSE 1903.10

-m PAGE 5 01 61 U ARKANSAS NUCLEAR ONE aEvisiON CHANGE z o>rE DAYE uoriu/ 61 6.1.5 Reactor shutdown required by the Limiting Conditions for Operation of the unit's Technical Specifications.

6.1.6 Loss of ability to assess off-site radiological doses, or loss of radio communication with off-site agencies.

6.1.7 The occurrence of other unusual events:

A. Fire in a vital area not under control within 10 minutes.

B. Aircraft crash onsite.

C. Train derailment onsite.

D. Explosion on site resulting in equiptent damage and/or I personnel injury requiring hospitalization.

E. Toxic or flamraible gas release onsite or affecting the site which requires a plant evacuation.

F. Medical emergency which requires transporting a radio-logically contaminated individual from the site to an s offsite hospital.

G. Any tornado causing facility damage.

6.2 Personnel Responsibilities and Required Actions For the Unusual Event Emergency Action Level, the follcwing actions shall be taken by members of the Initial Response Organization, as described in the Arkansas Nuclear One Emergency Plan:

6.2.1 Shift Operations Supervisor A. Once the Shift Operations Supervisor has determined that the Unusual Event Emergency Action Level should be declared, he shall:

1. Assure the appropriate procedures are being imple-mented to mitigate the consequences of the Unusual Event.
2. Implement the Unusual Event Emergency Action Level notifications, and record these notifications as shown on 7orm 1903.10A of this procedure.

l l

l l

I

PLANT MANUAL SECTION: PROCEDURFMORK PLAN TITLE: NO:

, EMERGENCY PLAN '

EMERGENCY ACTION LEVEL RESPONSE 1903.10 f s PAGE O 01 6L U ARKANSAS NUCLEAR ONE navisiON CHANGE 2 oAre DATE cofiufs1

3. Continue to monitor plant conditions in order to determine if upgrading to a higher Emergency Action Level becomes necessary.
4. Direct the activities of the Initial Response Organ-ization (if activated) until relieved by the Duty Emergency Coordinator.
5. Direct operations personnel and unit operations.

6.2.2 Shift Technical Advisor A. The Shift Technical Advisor shall assist the Shift Operations Supervisor in incident assessment.

6.2.3 Shift Administrative Assistant A. When directed by the Shift Operations Supervisor the Shift Administrative Assistant shall initiate the Un-usual Event Shift f.dministrative Assistant Notification List and Record, Forni 1903.10B of this procedure. The Shift Administrative Assistant shsll also respond to g3 incoming calls to the control room during the incident

() for_ notification authentication.

D. In the absence af the Shift Adminstrative Assistant, the Shift Operations Supervisor shali appoint an in-dividual to initiate the Unusual Event Shift Adminis-trative Assistant Notification List and Record. If additional assistance is needed, the Shift Operations Supervisor r c/ appoint individuals to assist in per-forming notifications.

C. The Shift Administrative Arcistant shall assist opera-tions personnel as directed by the Shift Operations Supervisor.

6.2.4 Duty Emergency Ccordinator A. If not on site, and if deemed necessary, the Duty Emer-gency Coordinator may report to the site to direct any necessary emergency response operations, so as to free the Shift Operations Supervisor to direct reactor opera-tions.

r^g

. /

l PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

l EMERGENCY PLAN ' 4 EMERGENCY ACTION LEVEL RESPONSE 1903.10 i

PAGE 7 of 61

(_ _ )'

ARKANSAS NUCLEAR ONE aEvisioN 2 oATE 06/10/81 CHANGE DATE B. The Unusual Event Duty Emergency Coordinator Notifi-cation List and Record, Form 1903.10C of this procedure, shall be initiated by the Duty Emergency Coordinator.

C. At the termination of the event, the Duty Emergency Coor-dinator shall verbully close out the event and prepare a written summary for Plant Safety Committee review, in accordance with Section 6.3 below.

6.3 Termination or Escalation of ,F3;f tency Action Level 6.3.1 The Unusual Event Emergency Action Level may N. terminated by the Duty Emergency Coordinator after review of the event and implementation of appropriate corrective action.

6.3.2 The Unusual Event Emergency Action Level may be escalated to a higher Emergency Action Level if the Criteria of Sections 7.0, 8.0, or 9.0 are met.

6.3.3 The Unusual Event Emergency Action Level may be closed out after being terminated by a verbal summary from the Duty Emer-gency Coordinator to offsite authorities who were contacted 7 _. during the event. A written summary of the event shall be

( ,) transmitted to the NRC and appropriate off-site authorities.

6.4 Forms 6.4.1 The following forms describe the notifications aad records to be made by the appropriate individuals for the Unusual Event Emergency Action Level. Date the form where indicated (if the date changes before the form is complete, indicate the new date on the appropriate initial / time line). As notifica-tions are completed, initial and time should be placed on the line in the right hand margin by each step. Other pertinent data (e.g. person contacted) may also be noted adjacent to each step, as appropriate.

6.4.2 Form 1903.10A - Unusual Event Shif t Operations Supervisor Notification List and Hecord.

6.4.3 Form 1903.10B - Unusual Event Shift Administrative Assistant Notification List and Record.

6.4.4 Form 1903.10C - Unusual Event Duty Emergency Coordinator Notification List and Record.

/~T .

(-)

l

~.  :- ,

PLANT M ANUAL SECTION: PROCEDUREN/ORK PLAN TITLE: NO-m....... *

- EMERGENCY PLAN

. EMERGENCY ACTION LEVEL RESPONSE 1903.10 )

PAGE 8 of 61  !

O.m ARKANSAS NUCLEAR ONE aEvisioN CHANGE 2 o TE DATE oo/1ofe1 r

-~+~ ~ ~ . , . , , .

- ARKANSAS POWER & LIGHT COMPANY . . . . . . . . . . _ . _

Arkansas Nuclear One .

TITLE.

EMERGENCYACTIONLEVF{ESPONSE l FORM NO.1903.10A REV . # ' TC .?

UNUSUAL FV1.NT Page 1 of 2 SHIFT OPERATIONS SUPERVISOR NOTIFICATION LIST AND RECORD DATE

'_

  • INITIALS / TIM _E s

..r~

1. Unusual Event Emergency Action Level has been declared /

-based on the following conditions (List):

N &/N i .

2. Direct the Shif t Technical Advisor to the Control Room. / i
3. Direct the designated Shift Administrative Assistant to /

initiate the notifications specified on Form 1903.10B (the order of notification may be re-arranged as necessary).

Assign personnel to assist, as necessary.

4. If a radiological release *is involved: ..

4.1 Direct apprcprice personnel to perform the calcul - / _

ations per 1%4.02 (2904.02), " Magnitude of Release -

Unit i (2)".

4.2 Provide radiological release information to the per-sonnel responsible for making follow-up reports (SAA, TSC, ECC, ETC).

' * *

  • A 4.3 Direct the implementation of appropriate onsite pro-tective actions.
5. Direct operating personnel to closely monitor plant para-meters, (particularly those which are associated with the need to escalate to a higher Emergency Action Level).
6. Perform the duties or the Duty Emergency Coordirator until relieved of thos2 responsibilities (refer to Form 1902.10C).

<. v

7. $ = &I ' '

4

~ g: .

~ -

",% @'* - emte s %* o%es '. d.ne ,% -J . .',.s,,y,_.,;._,g,., , , ,

A.- --r. . ~- ,. ___ ,

    • 'Nh* . . . .. ,

AJ PLANT M ANU AL SECTICN: PROCEDURElWORK PLAN TITLE: N2 numm c n1

, H '

_ , , ,,, ,, , r.

~. <r.n. . c_r u. c_v. m. w.

s rvronr*my AcTTON TIVEL RESPONSE

-- 1903.10 p

N-(') (

ARKANSAS NUCLEAR ONE aEvisioN CHANGE 2 DATE DATE 06/10/81 I

. ~ . . .~, . . ~ . . . ..

~ ~ '""

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One -

4 TITLE: EMERGENCY ACTION LEVEL RESPONSE l FORM NO. 1903.10A REV . # ' PC #

Page 2 of 2 DATE INITIALS /ilME

7. Maintain a log of the incident (this may be delegated to other persocnel as available).
8. At the termination of the event, this Notification List and Record should be turned over to the Duty Emergency Coordinator.

i.? yip,rA um-d :2,-c _

SHIFT OPERATIONS SUPERVISUR

\ l' SG D

O

' %W veG

_v -- -a- .2 1

l I

. c ~- ~;,y ... <.

=

e a , -= e.= w ,c- .=m t w e,- s ,en-em ,o . #' g s .-,e ym en% s e. e, g g , g , pgp

.M ey e e 9',- j_y g pp g -y gery  %, y a e q, e,q W , -g ,* [e *, f ,f*du.am e .

~ e

v PLANT MANUAL SECTION: PROCEDURENIORK PLAN TITLE- NO:

. ,. =

r. i

, , , , . , _ 4

- -DidRn.uce - - - - nr ur ..

..',. s rwencrwy Ac'rTON LEVEL RESPONSE 1903.10 PAGE 10 of 61 1 N- ARKANSAS NUCLEAR ONE aEvtmoN 2 oA1E 06/10/81 CHAN2E-DATE f

I

. . . , , - m

.m_ ., , . -

,, _. , _ , ~~' ~

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One -

TITtt EMERGENCY ACTION IIVEL RESPONSE l FORM No. 1903.10B REV. f PC f '

UNUSUAL EVENT Page 1 of 2 m h, SHIFT ADMINISTRATIVE ASSISTANT NOTIFitATION LIST AND RECORD DATE j _, , - INITIALS / TIME ,

1.

- Complete as much of Form 1903.10M, "EAL Notification" as available informati.o. and time allows.

NOTE:

The order of notification may be rearranged as dictated gg y by the situation with approval af the Shift Operations Supervisor. These, groups should be contacted by the most.

expedient meacs available (paging, contacting appropriate response center for relaying information, direct phone call, radio contact, etc.). The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appropriate response center has not been manned, etc.

2.

Provide followingthe initial information on Farm 1903.10M to the groups:

2.1 Duty Emergency Coordinator (a duty roster is main- .

..' tained in the chif t Supervisor's office; refer'to /

s ' i.N >$

~

i Attachment 1.for telephone numbers as necessary)*.'

2.2 Nuclear Regulatory Commission (Hotline; o'r (8 f the region office is contacted, request that this ~ /

  • s formation be forwarded to the Bethesda Emergency Operations Center)).

~.

2.3 Arkansas Department of Health' (or contact '

e the OES at /

o< via the OES radio channel and ,

ow 4 request them ti notity the Health Department)]. ~

='~

i_

2.4 Emergency Te:.ms requiring immediate response only (refer to the individual attachmeat for call list if tearn per-sonnel are not currently ot ite):

NOTE:

The following minimum information should be proviied to the team leader: affected unit, EAL declared, appropriate plant conditions / parameters, required response.

2.4.1 Security Personnel t

- . / or Evacuation /

Team (Attachment 2) "g .g. a jf -$

N .a.**

3 '

, , v: ,

'? 4 v

  • 4 I

l l

l 9:s , . .

..v. ..~.~c . u...---  :.~m - ~, s . .~ -~ . . ~ . ~. n - ~ m ~ . +~~ ' . & "w.'*w K~. M ~ ' * * ** v' # '~^*&'"

e --. -.. . .

, Pt. ANT M ANUAl. SECTION: PROCEDUREAYORK PLA N TITLE: NO:

4 ai H grencevcv . - - - . -or w N ncFNcv AcTTON LEVEL RESPONSE 1903.10 PACE '11 of 61 ARKANSAS NUCLEAR ONE

' O' aEvisioN CHANGE 2 oarE DATE 06/to/8t r

  • NM W . W4 w .a w - ,

-- ARKANSAS POWER & LIGHT COMPANY . . . . . . . . . . .

Arkansas Nuclear One .

tiitt EMERGENCY ACTION LEVEL RESPONSE l FORM NO.1903.108 REV . #

  • PC f _

Page 2 of 2

r. DATE

.e

,' INITIALS / TIME 2.4.2

~

Fire Team (Attachment 3) /

.n 2.4.3 Medical Team (Attachment 4) / I 2.4.4 Radiation Team (Attachment 5) /

.. 2.5 Little Rock Control Cen'.ct . ~ , or cucact /

MNT*

either the OES or the M35 Dispatch Center ar.d - - - - ' -

. request them to notify the LRCC).

2.6 General Manager

( h-" > /

2.7 NRC Resident Inspectors (either one): /

2.7.1 W.D. Johnson # ~~'t 2.7.2 L.J. Callan-s-----_. 1

3. Provide updates, as necessary, to the following groups: s ,.
s.  ;; d*;..

1: 3.1 Duty Emergency.Coordinatot

. 3.2 Nuclear Regulatory Commissi>n ,,

3.3 Arkansas Department of Health J. Little Rock Control'- Center

4. At the termination of the event, this form and other applicable '

%m 4 infermation should be turned over to the Duty Emergency Coordinator. ,, ,_(_

Shtft Administrative Assistant

- e .. .

. : v.* - . 'I , -

-.7 ,,,

.C Q. ' *K .

(. .);' . . . '

- ~ . - E eh .e ce . A = w..g ,,,g , ,yp , _

~ e

  • ~ *s .

v PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE:

. . . m NO:

m ,

1 m nm.ru mw '

. . ,;. a . ..

. ,www= -- - .'.

"IERGENCY m'IM TFVFT. RESPONSE

- 1903.10

() PAGE N- 17 of 61 ARKANSAS NUCLEAR ONE aevisio" CHANGE 9 oATE 06/1o/81 DATE r

. . ~ - -.

m,_

_ ,.. ARKANSAS POWER & LIGHT COMPANY . . . . . . , . . . .

Arkansas Nuclear One ,

TITLE. EMERGENCY ACTION LEVEL RESPONSE l FOPM NO.1903.10C REV. f A PC #

1:NUSUAL EVENT Page 1 of 2 DUTY EMERGENCY COORDINATOR NOTIFICATION LIST AND RECORD -

~

DATE _

INITIALS / TIME

1. Notified that an Unusual Event Emergency Action Level has / ,

been declared, based on the following conditions (List):

~

N@h sed -

{ a. ,

2. If on-site, or if deemed necessary to report to site, /

record the time that the Shift Operations Supervisor was relieved of Duty Emergency Coordinator respaasibilities.

3. If a radiological release is involved: ,

' ,' N 3.1 Relieve the Shift Operaticas Supervisor of _respon- / ,. [de;.c. - ,

?; sibilities .for calculating the magnitude of radio-logical release. ,,

^

4. Provide updates to the following groups, as necessary: .

4.1 General Manager'

~_ /

4.2 NRC Resident Inspector (initially contacted) ,

. we, o -.gg 4.2.1 W.D. Johnson ,

I 4.2.2 L.J. Callan

5. At the termination of the event, provide a verbal summary to:

5.1 F.. clear Remlatory Commission (Hotline; l

  • L . __ s

7 5.2 Arkansas Department of Health /

I.?. .'..t7 ' '.M . . _ . . ,

.c .,

9 .b. g 4

t ~

o l

l t

b. '-%

.A, . .,..-..g ..y ,.,4 . . . , , , , , , _

i -

. PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

_ m r, ' j e .-

rwncvvcV PT AN e M RGENCY ACTION LEVEL RESPONSE 1903.10 3 -- -

PAGE '13 of 61 N- ARKANSAS NUCLEAR ONE n/

'v REVISION CHANGE 2 DATE DATE 06/10/81

---.- . _s _ . t -

~~

ARKANSAS POWER & LIGHT COMPANY ~^ " '

Arkansas Nuclear One TITLE EMERCENCY ACTION LE'JL RESPONSE l FORM NO. 190:. 10C REV. #4 PC #

Page 2 of 2 DATE

~

INITIALS / TIME

6. Provide a written swmnary of the event to the groups indicated in step 5.0. .- ,,-

DUTY EMI.RGENCY COORDINATOR

,qgi fj ._ ---

('S L)

I es 4

ru n%:,-- ~w_ aw N D

't) * .

,.,,%...,7 .,.....,y, _m, , , , ,. . . ,, , ,_ , , , ,

-. o

- l PLANT MANUAL SECTION: PROCEDUREMORK PLAN TITLE: NO:

M c Y rurnerucv nriu

. ~~~rurocrv y AcTTOV TIVEL RESPONSE 1903.10 i

PAGE 14 of 61 n

N/

N- ARKANSAS NUCLEAR ONE Revision CHANGE 2 oATE DATE 06/10/81 7.0 ALERT 7.1 Classification Criteria 7.1.1 Pr9jected summed releases from either unit exceed 10 times MPC for one hour at the site boundary assuming annual average X/Q and actual windspeed.

7.1.2 Abnormal RCS conditious:

  • A. Margin to saturation of the RCS as indicated on installed instrumentation or as calculated is less than 20*F for 10 minutes with no indicatich for immedi:te recovery.

B. RCS I dose equivalent activity is greater than 100 pCi/gm. -

C. RCS leakage is greater than normal makeup capacity.

D. Inability to make or maintain the reactor suberitical when intended.

gy 7.1.3 Ongoing security threat within the protected area sacurity

(,) fence, but outside of plant buildings.

7.1.4 Evacuation of the Control Room required.

7.1.5 Loss of all redundant means of core cooling.

7.1.6 All safety-related annunica_ tors lost for more than 5 minutes when above cold shutdcwn.

7.1.7 The occurrrence of other unusual events: .

A. Earthquakes resulting in 0.lg trigger alarms actuation.

B. Lake Dardanelle level is greater than or equal to 350' $

(above sea level) 7.1.8 Radiation levels at two or more area radiation monitors in the Reactor Building increase by 2,000 mR/hr, or radiation levels at two or more arca radiation monitors in the Auxi-liary Building or the Fuel Building increase by 100 mR/hr due to a severe degradation in the control of radioactive materials.

O 9 1

l 1

PLANT M ANUAL SECTION: PROCEDURETWORK PLAN TITLE- NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10

-3 PAGE 15 of bl U ARKANSAS NUCLEAR ONE aEvisioN CHANGE 2 DATE DATE 06/10/81 7.2 Personnel Responsibilities and Required Actions For the Alert Emergency Action Level, the following actions shall be taken by members of the Initial Response Organization, as defined in the Arkansas Nuclear One Emergency Plan:

7.2.1 Shift Operations Supervisor A. Once the Shift Operations Supervisor has determined that the Alert Emergency Action Level should be placed into effect, he shall:

1. Issure the appropriate procedures are being imple-mented to mitigate the consequences of the unusual plant conditions.
2. Implement the Alert Emergency Action Level notifi-cations, and record these notifications as shown on Form 1903.10D of this procedure.
3. Continue to monitor plant conditions in order to determine if upgrading to a higher Emergency Action 73 Level becomes necessary.

L)

4. Direct the activities of the Initial Response Organi-zation until relieved by the Duty Emergency Coordin-ator.
5. Direct Operations personnel and unit operations.

7.2.2 Shift Technical Advisor A. The Shift Technical Advisor shall assist the Shift Operations Supervisor in incident assessment.

7.2.3 Shift Administrative Assistant A. When directed by the Shift Operations Supervisor, the Shift Administrative Assistant shall initiate the Alert Shift Administrative Assistant Not'fication List and Record, Form 1903.10E of this procedure. The Shift Administrative Assistant shall also respond to incoming calls to the control room during ihe incident.

(A.)

1 l

PLANT M ANUAL SECTION: PROCtLURE/ WORK PLAN TITLE: N O-q ,

mmnor nr .e J- i

- mu-m.ure~ - ~

rurocrvrv ArTT AM T_FVET. RFSPONSE

- - - 1903.10 PAGE 16 of 61 O N- ARKANSAS NUCLEAR ONE aevision 2 o^TE xJ 06/10/81 CHANGE DATE B. In the absence of the Shift Administrative Assistant, the Shift Operations Supervisor shall appoint an individual to initiate the Alert Shift Administrative Assistant Notification List and Record. If additional assistance is needed, the Shift Operations Supervisor may appoint individuals to assist in performing notifi-cations.

C. The Shift Adminstrative Assistant shall assist operations personnel as directed by the Shift Operations Supervisor.

7.2.4 Duty Emergency Coordinator A. If not on site, the Duty Emergency Coordinator shall re-port to the site when notified of an Alert. He shall direct emergency response operations so as to free the Shift Operations Supervisor to oversee reactor operations.

B. The Duty Emergency Coordinator shall initiate the Alert Duty Emergency Coordinator Notification List and Record, Form 1903.10F of this procedure.

g 7.2.5 Emergency Response Team Leaders

,(-

A. The Emergency Response Team L'eaders or Alternates are notified by the Shift Administrative Assistant that an Alert has been declared.

B. For situations requiring the support of a particular Emergency Response Teagy the Team Leader or Alternate shall be requested to call out and assemble the team.

The Team Leader or Alternate shall report to the Duty Emergency Coordinator when the team is assembled'.

C. For situations not requiring the immediate support of an Emergency Response Team, the Team Leader or Alternate .

shall contact the other team members and appraise them of the situation. The team members shall remain on call until notified that the Emergency Action Level has been terminated.

7.3 Termination or Escalation Of Emergency Action Level 7.3.1 The Alert Emergency Action Level may be de-escalated to a lower Emergency Action Level or be terminated by recovery from the event.

(

U .

-_ a-w g--

i f PLANT MANUAL SECTION: PROCEDURE! WORK PLAN TITLE: NO:

EMERGENCY PLAN .

. EMERGENCY ACTION LEVEL RESPONSE 1903.10 F PAGE 17 of 61

(?-') ARKANSAS NUCLEAR ONE aEvisiaN CHANGE 2 oATE DATE Oef10/81 7.3.2 The Alert Emergency Action Level may be escalated to a higher Emergency Action Level if the criteria of Sections 8.0 or 9.0 is met.

7.3.3 The Alert Emergency Action Level may be closed out after being terminated by a verbal summary to offsite authorities who were contacted during the event. A written summary of the event shall be transmitted to the NRC and appropriate off-site authorities.

7.4 Forms 7.4.1 The following foras describe the notifications and records to

'ae made by the appropriate individuals for the Alert Emergency Action Level. Date the form where indicated (if the date changes before the form is complete, indicate the new date on the appropriate initial / time line). As notifications are complete 1, initials and time should be placed on the line in the right hand margin by each step. Other pertinent data (e.g. person' contacted) may also be noted adjacent to each step, as appropriate.

p, 7.4.2 Form 1903.10D - Alert Shift Operations Supervisor Notification U) List and Record.

+

7.4.3 Form 1903.10E - Alert Shift Administrative Assistant Not;fi-cation List and Record.

7.4.4 Form 1903.10F - Alert Duty Emergency Coordinator Notification List and Record.

I l

i l k-l l

l l

l l

I

f:.

PLANT M ANUAL SECTION: PROCEDUMORK PLAN TlTLE.

NO:

.] rirrocreev rn w N 9CFNcV ACTTON LEVEL RESPONSE 1903.10

- - ~ - - --- '

PAGE n

V' Eric ARKANSAS NUCLEAR ONE aEvisioN 18 of 61 2 DATe 06/10/81 CHANGE DATE I

%. , ._ m_ _ ..

_n ... ,

ARKANSAS POWER & LIGHT COMPANY - . - -

Arkansas Nuclear One l TITLE: EMERGENCY ACTION LEVEL RESPONSE l FORM NO- 1903.100 REV. #' PC #

ALERT Page 1 of 2 SHIFT OPERATIONS SUPERVISOR NOTIFICATION AND RECORD DATE i .s~

INITIALS / TIME

1. The Alert Emergency Action Level has been declared based

/

on the following conditions (List):

M(4,*.E tv-fd QJ

2. Direct the Shift Technical Advisor t, the Control Room. , /

3.

Direct the Shift Administrative Assistant to n.itiate the /

the notifications specified on Form 1903.10E (the order of notifications may be rea ranged as necessary). Assign personnel to assist, as necessary.

4. Ifaradiologicalreleaseisinvolved(unlessp[evjously 4

relieved of this responsibility): ..

4.1 Direct appropriate personnel to perform the calcul- /

ations per 1904.02 (2904.02), " Magnitude of Release -

Unit I (2)"

4.2 Provif radiological release information to the per-

  • sonnel respon.sible for making follow-up reports (SAA, TSC, ECC, ETC.). i mw. Aw J ' - - - - - =-

4.3 Direct the implementation of appropriate onsite pro- I tective actions.

5. Notify tne Duty Guard Sergeant at the Main Guard Station to /

dispatch a guird to provide access to the Technical Support Center and Emergency Control Center. )

l

,'+'."

l

.]

' R3 ~[ y-O $ -

l O .

l l

1 We .w . en

. , e- me=== sn . moem.=**"i*,n' .v.

  • &+* %'e= 1. OFQM@b'm%. *j'T' *** ' . T
  • M' 0 "" # ^* * -

e q

PLANT MANUAL SECTION: PROCEDUREN.'ORK PLAN TITLE: NO:

r ,.

m

( l rm n crecy -

      • ? d ' '

~~' - ' ~or w '

FMFRCFMCY ACTTON LEVEL RESPONSE 1903.10 PAGE 19 of 61 n"

V

"E:95 -

ARKANSAS NUCLEAR ONE Revision CHANGE 2 oATE 06/10/81-i DATE 1 I l

.__ -e-ww w.c- .-

m ARKANSAS POWER & LIGHT COMPANY

~

g TITLE:

Arkansas Nuclear One EMERGENCY ACTION LEVEL RESPONSE l FORM NO.1903.100 REV. f' ?C #

lage 2 of 2 DATE

  • INITIALS / TIME
6. Notify onsite personnel that an Alert has been declared a d _ /

and describe the nature of the alert.

7. Direct operating personnel to closely monitor plant para-meters (particularly those identified with the need to escalate to a higher Emergency Action Level).

" , , 8. Perform the duties of the Duty Emergency Coordinator until

' M? '*l relieved of those responsibilities (refer to Form 1903.10F).

9. Maintain a log of the incident (this may be delegated to other personnel as available).
10. At the termination of the Emergency Action Level, this Notification List and Record should be turned over to the Duty Emergec:y Coordinator.

SHIFT OPERATIONS SUPERVISOR a; -

e.

b 8

. .m. 4 , . _ . ~ . _ _ . - -

u_ s l ,c. '.

.'e*e c n':

~

"' * \ e d ,ev m powas g ,;w - _ . m , eyA--o,., pp y g p y =

,q4,_ y,, , y g y' ,

,_ e -- -.

-M * -:- .

PLANT M ANUAL SECTION: PROCEDUREN/ORK PLAN TITLE:

._ = NO:

.... m

. lkI l

rurocrucv nr- - m e m- v -

vvvocvvev AcTmN LEVEL RESPONSE 1903.10 PAGE 20 of 61 l Edu -

ARKANSAS NUCLEAR ONE REVISION '

2 DATE 06/10/81

- CHANGE DATE f

l

-.. " " ' " ' ' ~

ARKANSAS POWER & LIGHT COMPANY

'~

' Arkansas Nuclear One -

l flite: EMERGENCY ACTION IIVEL RESPONSE

_ l Fonu No. 1903.lCE REV. # ' PC #

Page 1 of 3 . .

-7 .

ALERT SHIFT ADMINISTRATIVE ASSISTANT

. NOTIFICATION LIST AND RECORD

. DATE r.r~

INITIALS / TIME

1. . Complete as much of Form 1903.10M, "EAL Notification" as available information and time allows.

NOTE:

N.h26 The order of notification may be rearranged as the sit- ' -

{

uation dictates witts approval of the Shif t Operations Supervisor. These groups should be contacted by the

, . . most expedient means available (paging. contacting appro-priate response center fur relaying information, direct phone call, radio contact, etc.). The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appropriate response center ' as not been manned, etc.

2.

Provide followingthe initial information on Form 1903.10M to the groups:

?-.

2.1 Daty Emergency Cootoinator (a duty roster is artn- .r'.'.',*.

,d

/

tained in the Shift Sapervisor's office; refer to _

Attachment I for telephone numbers as necessary). . -..

2.2 Nuclear Regulatory Commission [ Hotline; or /

(if the region office as contacted, request that this.

information be forwarded to the Bethesda Emergency Operations Center. 2.3 Arkansas Department of Heald .  ; or contact /  !

            , 4                                        the OES s                   or use t.a OES radio channel) and
                                                                                                                                                                                    '             ~ -

request them to notify the Health Department]. 2.4 Emergency Teams requiring immediate response (refer to the indicated attachment for call out list if team personnel are not currently on site). NOTE: The following minimum information should be pro-vided to the team leader: affected unit EAL declared, appropriate plant conditions / para-meters, required response and suggested pro-7e " tective actions (if necessary).

                                                                                                                                                                                                - ..               g- -   : _+- r v~ .                                                                                                                                                                                   ' epy.
                                                                                                                                                                                               ~ '. .[ . _ ,p%,.   ;-
                                                                                                                                                                                                                            ^ 3-i 9                  w'     s 9  y,.         4=   m  ,g     e     A         e   "W- ,W' M ['4g      f F % gDmD .B D   &Wf IM 6**WOY
                                                                                                                               ,     O#    9W.
  • S, # g 3 e e " '

e .

                  ~                                                                                                                                              --   m . .

s.e.

                                      *                                                                                                                                                                     -I PLANT MANUAL SECTION:                      PROCEDUREN/ORK PLAN TITLE:                                                        NO-
                       ~.      t
                                     \
                           .            _vwncvvcV PTAv                                           -

FMERGENCY ACTION LEVEL RESPONSE 1903.10 [ '" ARKANSAS NUCLEAR ONE Evisia */25YE CHANGE DATE osnour

     . . . , m                                                                                                                                                        f e p .,.,.                                     .
    ~~ ~                                                                                                                                                                    ~'~ '                                       '

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One

  • mLE:

EMERGENCY ACTION LEVEL RESPONSE l FORM NO.1903.10E , REV. i' PC i

           . -                                                                                                                            Page 2 of 3                                 -

DATE INITIALS / TIME 2.4.1 Evac:.ation Team (Attachment 2) __ / . 2.4.2 Fire Team (Attachment 3) I

                                                                                                                                              /

2.4.3 Medical Team (Attachment 4) /

         - -                                     2.4.4 r=@~.141                                                      Radiation Team (Attachment 5)                                                 /
                                                                                                                                                                         -^
                                                                                                                                                                                   ~

2.5 Operations Management (contact one of the following /

 ,       t. a =                                  individuals):

2.5.1

  • B.A. Baker i 2.5.2 S.J. McWilliams
                     ,                          2.5.3           L.A. Taylor'
       ,- '                                                                      w.-                        _;

2.6 Little Rock C6ntrol Centeri .

       , :'-                                    either the OES or the MSS Dispatch Center and request
                                                                                                          , or contact                       /                                      ,. ,                ,

them to notify the LRCC). i '. *fa '

  • 2.7 Emergency Teams ny requiring immediate response (refer .a to the indicated attachment for call list if team ~

personnel are not currently onsite): NOTE: The following minimta information should be pro-vided to the team leader: affected unit, EAL

  • declared, appropriate plant conditions / parameters, ,,

time team placed "on call." j m' A u_. _

                                                                                                                                                                               .__m     - -      . - -              m 2.7.1           Evacuation Team (Attachment 2)                                              /

2.7.2 Fire Team (Attachment 3) / 2.7.3 Medical Team (Attachment 4) / 2.7.4 Radiation Team (Attachment 5) / 1 a ;.y .

    .w.            =
      '.*%         <                                                                                                                                                           -   e.         e p g      e-        "'.."*

e

  • ws<:

r' ':, , m  %

                 .           Y d ,
                                                          ~

e  % 4> .***,###*%,4*= f p g p *. s.. #g7 . De e = **

  • W ' g og M M (M y.y M ,%  % M 7" 8* . #*N** N - O *% .
                .                  a

Y re u .. PLANT M ANU AL SECTION: PROCEDUREN/ORK PLAN TITLE:

                            ..           m                                                                                                                             N O.

7 t l r.ure,evcv nr ur s ,;,. ... .: . ~ ,j .r.--e - x- -- r e cevev ArTTON U VEL RESPONSE 1903.10 N-

                                                                                                                            .        PAGE          '22 of 61
        )                                                  ARKANSAS NUCLEAR ONE                                                      aEvisioN , 2 DArE CHANGE               DATE es/10/81 r
     . .      ,,4                                                                                                                                                   .--         =--=~.,nw ARKANSAS POWER & LIGHT COMPANY                                                                    ~~~~~

Arkansas Nuclear One mLE. EMERGENCY ACTION LEVEL RESFvNSE l FORM NO.1903.10E REV. I' PC # Page 3 of 3 - DATE

           .'. V
             ,-                                                                                                                  INITIALS / TIME
           ',                                    2.8 Ceneral Manager ,                                                  ,,               /

2.9 NRC Resident Inspectors (either one) -.f.-.r~ / s 2.9.1 W.D. Johnson i 2.9.2 L.J. Callan

                                                                                                                                                                                                                   ^
3. Notify the Duty Emergency Coordinator that the initial / - ' - -

notifications have been made (inform him of any individuals that contact could not be made with).

4. Provide updates to the following groups until relieved of this responsibility:

4.1 Duty Emergency Coordinator 4.2 Nuclear Regulatory Commission

     's'                                                                                                                                                                              ,

4.3 Arkansas Department of Health (unless otherwise .

         'S                                                                                                         - --'
                                                                                                                                                                                  .t         .

directed) ' E 7'?E*.-

              ^

4.4 Little Rock Control Center (unleas otherwise directed) ~-*

5. Unless required to report onsite, at the termination of the /

event, notify the individuals contacted in Step 2.7 above to secure from "on call" status.

6. At the terminacion of the event, this form and other ap- ,

plicable information should be turned over to the Duty  ; I W Emergency Coordinator, ce j e -n .- - - -m l Shift Administrative Assistant

 . .,, y ,                                                                                                                                                                                        \ .

s

        ,p                                                                                                                                                           . , ; .' M,M.^f '. *
        )                                                                                                                                                                    .                 - .

m

                                                                                                                                                             -l m v.                  - -       . . - -       . . . .       ... .  ....            .. , _ ..,
n. .... n . u x ,.m o gy.1 ;- ~,... w . .n... . r. .
               -                          e                                                                                                . - -    . . .         .
                                .                    PLANT M ANUAL SECTIOrt                         PROCEDUREN/ORK PLAN TITLE:                                                   NO:

m M v

                                                      .,vera           cpyryM- Av    --                                                                                            1903.10
       , .. p.      -

4 j! , FMPRcrYCY ACTION LEVEL RESPONSE PAGE 23 of 61 O

 \.s N-                              ARKANSAS NUCLEAR ONE                                                            Revision CHANGE 2 DATE DATE 06/10/81
   ._. .~                                                                                                                                                                          I .~.~                     , . .
  ~ . -             ._.

ARKANSAS POWER & LIGHT COMPANY - - Arkansas Nuclear One . TITLC EMERGENCY ACTION LEVEL RESPONSE l FORM NO. 1903.10F REV. #~ PC # ALERT Page 1 of 2 DUTY EMERGENCY COORDINATOR NOTIFICATION LIST AND RECORD DATE INITIALS / TIME

1. Notified that an Alert Emergency Action Level has been /

declared, based on the following conditions (list): vykslt eti-l$ -- O, V

2. Record time that the Shif t Operations Supervisor was /

relieved of the following Duty Emergency Coordinator responsibilities: 2.1 Providing direction to the emergency response personnel. 2.2 Calculating the magnitude of radiological' release. ~ 2.3 Performing follow-up notifications to the following ** groups: 2.3.1 Nuclear Regulatory Commission 2.3.2 Arkansas Department of Health (unless other-wise directed) , e ,m 2.3.4 General Manager. - - - -

3. If deemed necessary, activate the ~1e hnical Rupport Center /

staff (refer to Attachment 6 for call ' 's t as a essary).

4. If deemed necessary, activate the Operational Support /

Center staf f (refer to Attachment 7 for call list). I" *,** '.',**4 f;

                      '. a
                  '. 1[
 %/
  • l l

l 1

                                                                                                                                                                                                                      )i
   'W      We s - eru     a  . .. v a g n a   e-
                                                     %_n    w , ,. Ars         .+,-e     .,p e mm . y m p ,,gy     ,  s ,, . _ . , ,                     ,

or ,, ,y q, 4 .,- e.,,,

s. ,
                             .-                   PLANT MANUAL SECTION:                        PROC EDUREN/ORK PLAN TITLE-                                                         N O*
                   ..              m 5I
                             ,  j  i r.,rocrvgv nr w em - - " -'                        -

r-:w ncrvrv AcTTnN TTVEL RESPONSE

                                                                                                                                   .           PAGE 1903.10                        I
                                                                                                                                                            '24 of 61 o                   I:532 -                             ARKANSAS NUCLEAR ONE                                                                    aEvisiON I

2 DATE 06/10/81 l CHANGE TATE l 1 l l r _  % ' . s-e

                                                                                                                                                                                                                        )

ARKANSAS POWER & LIGHT COMPANY ,_ _ g Arkansas Nuclear 07e --. .~. TITLE E."ERGENCY ACTION LEVEL RESPONSE l FORM NO. 1903.10F . REV. #' PC # Page 2 of 2 DATE INITTALS/ TIME

5. If deemed necessary, assign personnel to perform the /

following duties:

                                                                                                                                       ~

n" 5.1 ? tan open phone links between the Contral Room 'end the Technical Support Center. 5.2 Update status boards. 5.3 Perform magnitude of release calculations. p - 5.4 Other duties as necessary to support the incident response. v 6. Update the Control Room periodically on the status of personnel reporting onsite or emergency response centers being activated.

7. At the termination of the event, the following summaries shall be provided:

7.1 A verbal summary to: 7.1.1 Nucleat Regulatory Commission r

                                                                                                                                                              /

7.1.2 Arkansas Department of Health

                                                                                                                                                              /

7.2 A vritten summary of the event (provided to the groups indicated in step 1.1).

                                                                                                                -a_.

Duty Emergency Coordinator '

  .s          ;
                                                                                                                                                                                          - **  l          '7 q

V - t 1

         @-c'*b,A       p esg-  w*a*=-.     **'.wgf=.      .e-h-44 m M-9'9di**=_-*.WP#W48 =e' ?                                     *
                                                                                                 .DF% F 649 $ 4Wf 'f%i. W f 6 PM
  • 4 Q 4 a. g*f yQ gp4%* >Q , *.W. , - h*

N $ f 6,*. e. .WM '. 49

l PLANT MANUAL SECTION: AMOCEDUREN/ORK PLAN TITLE: NO.

                ""1

_ vMrncvvey ptAM y d

                                                      -  FMFRCFNCY ACTION LEVEL RESPONSE       1903.10    l PAGE     25 of 61 O       CSC      -

ARKANSAS NUCLEAR ONE atvisioN k/ 2 oAre 06/1o/81 CHANGE DATE 8.0 SITE EMERGENCY 8.1 Classifications Criteria 8.1.1 Project'ed summed off-site dose rates from either unit exceed SmR/hr whole body or 25 mR/hr thyroid dose rate assuming annual average X/Q and actual wind speed. 8.1.2 Installed instrumentation or as calculated indicates the-RCS is in a saturated condition. 8.1.3 Ongoing security threat within plant buildings, but not within the Control Room or vital areas. 8.1.4 Evacuation of the Control Roon required and control of systems required for maintaining the unit in a safe condition cannot be established. 8.2 Personnel Responsibilities and Required Actions For the Site Emergency Emergency Action Level, the following actions shall be taken by members of the Initial Response Organization and 7-s the Emergency Response Organization, as defined in the Arkansas (j Nuclear One Emergency Plan: 8.2.1 Shift Operations Supervisor A. Once the Shift Operations Supervisor has determined that the Site Emergency Emergency Action Level should be placed into effect, he shall:

1. As.,ure the appropriate procedures are being imple -.

mented to mitigate the consequences of the unusual plant conditions.

2. Implement the Site Emergency Emergency Action Level ,

notifications, and record these notifications as shown on Form 1903.10G of this procedure.

3. Continue to monitor plant conditions in order to determine if upgrading to a higher Emergency Action Level betares necessary.
4. Direct the activities of the Initial Response Organ-ization until relieved by the Duty Emergency Coor-dinator.

_ 5. Direct Operations personnel and unit operations. v _

5ll j l PLAi4T MANUAL SECTION: PROCEDUREiWORK PLAN TITLE:

                ===                                                                                    i40:
       ...jl I       lb    -urnrr              nr w
     , fg]            m.  - m.ure.

m .- rurncreev ArTTny TTVEL RESPONSE 9 1903.10 l PAGE '6 of 61 N-D ARKANSAS NUCLEAR ONE !Revism l CHANGE 2 oAre DATE 06/10/81 8.2.2 Stift Technical Advisor A. The Shift Technical Advisor shall assist the Shift Operations Supervisor in incident assessment. 8.2.3 Shift Administrative Assistant A. When directed by the Shift Operations Supervisor, the Shift Adminstrative Assistant shall initiate the Site Emergency Shift Administrative Assistant Noti.fication List and Record, Form 1903.10H of this procedure. The Shift Administrative Assistant shall also respond to incoming calls to the control room during the incident. B. In the absence of the Shift Administrative Assistant, the Shift Operations Supervisor shall appoint an Admin-istrative Assistant Notification List and Record. If additional assistance is needed, the Shift Operations Supervisor may appoint individuals to assist in perform-ing notifications. C. The Shift Administrative Assistant shall assist opera-e- tion: perronnel as directed by the Shift Operations Super-7 x, / visor. 8.2.4 Duty Emergency Coordinator A. If not on site, the Duty Emergency Coordinator shall re-port to the site when notified of a Site Emergency. He shall direct emergency, response operations so as to free the Shif t Operations Supervisor to oversee reactor opera-tions. B. The Duty En.ergency Coordinator s;iall initiate the Site Emergency Duty Emergency Coordinator Notification List and Facord, Form 1903.101 of this procedure. . C. If a radiological release is involved, the Duty Emer-gency Coordinator shall direct the implementatica of appropriate onsite protective atttons, and shall pre. vide offsite radiological assessment information to offsite authorities responsible for implementing off-site emergency measures. g) 6

  • mh N n *
               .'       PLANT MANUAL SECTION:               OROCEDUREAVORK PLAN TITLE:
          ..        uma                                                                                  NO:

b

    ,             j      m...w_r>c_r_wv pr w FvFRCFNCY ACTION LEVEL RESPONSE p

1903.10 CSE2 -- n/ 'w ARKANSAS NUCLEAR ONE a; vision CHANGE 2 oATE DATE 06n0/81 8.2.5 Emergency Response Team Leaders A. The Emergency Response Team Leaders or Alternates are notified by the Shift Administrative Assistant that a Site Emergency has been declared. B. The Emergency Response Team Leader or Alternates shall call out and assemble the teams. The Team Leader or Alternate shall report to the Duty Emergency Coordi-nator when the team is assembled. 8.2.6 Incident Response Directer A '. The Incident Response Director is notified by the Little Rock Control Center that a Site Emergency has been declared. B. The Incident Response Director shall report to the Emergency Control Center when notified that a Site Emergency has been declared. 8.2.7 Recovery Manager

  )                                          A. The Recovery tfanager is notified by the Shift Admin-istrative Assistant that a Site Emergency has been declared.

B. The Recovery Manager shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declarea. 8.2.8 Operations Manager -- A. The Operations Manager is notified by the Shift Ad-ministrative Assistant that a Site Emergency has been declared. . t B. The Operations Manager shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declared. I 8.2.9 Maintenance Manager A. The Maintenance Manager is notified by the Shift Ad-ministrative Assistant that a Site Emergency has been declared.

                                                                   .a

PLANT M ANUAL SECTION: PROCEDUREY.'ORK PLAN TITLE:

                    ===                                                                                      NO-r..   <     i 1

m rurocerev

                           """"-~" - ' ~ ~ ~

orsv . PMFRCFNCY ACTTON LEVEL RESPONSE 1903.10 PAGE 28 of 61 ~, - ARKANSAS NUCLEAR ONE REvisios

    '                                                                                                2 DATE    06/10/81 l CHANGE        DATE B. The Maintenance Manager shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declared.

8.2.10 Operations Superintendents A. The Operations Superintendent are notified by the Shift Administrative Assistant that a Site Energency has been declared. - B. The Operations Superintendents shall immediately re-port to the Control Rooms of their respective Units and inform the Onsite Technical Support Center of his presence in the Control Room. 8.2.11 Health Physics and Chemistry Superintendent A. The Health Physics and Chemistry Superintendent is notified by the Shift Administrative Assistant that a Site Emergency has been declared. B. The Health Physics and Chemistry Superintendent shall ,s , immediately report to the Onsite Technical Support J Center when notified that a Site Emergency has been declared. 8.2.12 Nuclear and Engineering Support Superintendent A. The Nuclear and Engineering Support Superintendent is notified by the Shif.t Administrative Assistant that a Site Emergency has been declared. B. The Nuclear and Engineering Support Superintendent shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declared. . 8.2.13 Technical Support Manager A. The Technical Support Manager is notified by the Little Rock Control Center that a Site Emergency has been declared. 1 B. The Technical Support Manager shall report to the I Emergency Control Center when notified that a Site l Emergency has been declared.  ! O , 4

PLANT MANUAL SECTION: PROCEDURElWORE PLAN TITLE: NO: EMERGENCY PLAN . . EMERGENCY ACTION LEVEL RESPONSE 1903.10 29 of 61 O,_ ARKANSAS NUCLEAR ONE [PAriE REVISION 2 DATE 06/10/81 CHANGE DATF. 8.2.14 Maintenance Superintendents A. The Maintenance Superintendents are notified by the Shift Administrative Assistant that a Site Emergency has been declared. B. The Maintenance Superintendents shall immediately report to the Onsite Operational Support Center when actified that a Site Emergency has been declared. 8.3 Termination or Escalation of Emergency Action Level 8.3.1 The Site Emergency Emergency Action Level may be de-escalated to a lower Emergency Action Level or be terminated by recovery covery from the event. 8.3.2 The Site Emergency Emergency Action Level may be escalated to a General Emergency Emergency Action Level is the criteria of section 9.0 is met. 8.3.3 The Site Emergency Emergency Action Level may be closed out af ter being terminated by a briefing by the Recovery Manager 73 to the appropriate offsite authorities. A written summary ( ,) of the event shall be transmitted to the NRC and appropriate offsite authorities. 8.4 Forms 8.4.1 The following forms describe the notifications and records to be made by the appropriate individuals for the Site Emergency Emergency Action Level. Date the form where indicated (if the date changes before the form is complete, indicate the new date on the appropriate initial / time line). As notifi-cations are completed, initials and time should be placed on the line in the right hand margin by each step. Other per-tinent data (e.g. person contacted) may also be noted adjacent to each step, as appropriate. 8.4.2 Form 1903.10G - Site Emergency Shift Operations Supervisor Notification List and Record. 8.4.3 Form 1903.10H - Site Emergency Shift Administrative Assistant Notification List and Record. 8.4.4 Form 1903.10I - Stte Emergency Duty Emergency Coordinator { Notification List and Record. I l l (' \ \wI l l l

W V. PLANT MANUAL SECTION: PROCEDUREt#ORK PLAN TITLE: NO: r-Pw l

      .->.*--                5 rurr>crw v Dr w "P'             ' '

FMPRCFNfV ACTTON LEVEL DESPONSEI 1903.10 PAGE  % of 61 O

 's N-                              ARKANSAS NUCLEAR ONE                                                   Revision CHANGE 2 NATE     06/10/81 DATE

_ . , _ . ~~ ,.-

  .n.            .                                                   ARKANSAS POWER & LIGHT COMPANY                                                    . . . - . .

Arkansas Nuclear One . TITLE. EMERGENCY ACTION LEVEL RESPONSE l FORM NO.1903.10G REV. #* PC # SI'E EMERGENCY Page 1 of 2 SHIFT GrERATIONS SUPERVISOR ,_ NOTIFICATION LIST AND RECC.tD DATE

  • INITIALS /Ty
1. The Site Emergency Emergency Action Level has been declared /

based on the following conditions (List): r ygsq n_. ,

 'O
2. Direct the Shif t Technical Advisor to the Control Room. /
3. Direct the Shift Administrative Assistant to init.tatr the /

notificstions specified on Form 1903.10H (the order of notifications may be rearranged as necessary). Assign s personnel to a.sist as necessarv. .

4. If a radiological release is involved (unless prevTously relieved of this responsibility): ,,

4.1 Direct appropriate personnel to perform the calcul- / 1ations per 1904.02 (2904.02), " Magnitude of Release

                                                          - Unit 1 (2)"

4.2 Provide radiological release information to the per- , sonnel for making follow-up reports (SAA, TSC, ECC, > etc.). mm. ,g (_ . , . _ . . . .-. 4.3 Direct the intplener Lation of appropriate onsite protective actico= (unless previously relieved of this responsibility).

5. Notify onsite personnel that a 3ite Emsrgency has been /

l declared, and describe the nature of the emergency, i I

6. Direct operating personnel to closely monitor plant para- l meters (particularly those identified with the need to I escalate to a General Emergency Emergency Action Level). I WO _?? ".'.

l

    - [' g
                '$                                                                                                                                       ,.Y.         ";

l (q v f r  ; , 8 #

  • 9 w* d-*

f P4e'*n.,c e.==A 6 _s,,,, .,,% p.,,g -% ., , . 1 - .

U PLANT MAHtJAL SECTION: PROCEDUREAVORK PLAN TITLE: NO:

                         =

i pyrncpncy puv - . FMERGENCY ACTION LEVEL RESPONSE 1903.10

                                 ~

csEs " *

                                          ' ARKANSA5 NUCLEAR ONE                                          RIvYsi= 2" D21E CHANGE 06/10/81 DATE f

ARKANSAS POWER & LIGHT COMPANY -

                                                                                                                                              ~ ~ ~ ' "^ '

Arkansas Nuclear One TITLE- EMERGENCY ACTION LEVEL RESPONSE l FORM NO. 1903.10G REV. #* PC # Page 2 of 2 DATE - INITTALS/ TIME

7. Perform the duties of the Duty Emergency Coordinator until relieved of those responsibilities (refer to 1903.101) ,_
8. Maintain a log of the incident (thismaybedelegated(o

! other personnel as available).

9. At the termination of the Emergency Action Level, this Notification List and Record should be turned over to
 #7N-Y                             the Recovery Manager.                                                                               '-

(O

       /"                                                                           SHIFT OPERATIONS SUPERVISOR
                                                                                                                                                             . .n
       ,                                                                                         l' e-7,Z Mw                                                                                                                                    -          eA3__      _ww.               au s .
         . g                                                                                                                                   '

E . ,. .

     ;z.'                                                                                                                                      . 7 ;_ %:                    .         ', '

q .: -- -- 0 _

                                            .                                                                                          I g

n

   %% --                            . . .       ...*-       .....,..,,,.,,m.,,,.,y,_.;.    ..., ,.. _. .        , , .             ._,                              ,           ,, .        ,

d .

v

  - @..k                     .

PLANT M ANUAL SECTION: PROCEDUREMORK PLAN TITLE: NO:

                          ,.         =

7 l' l

 .u....g                       ,j-          -    .m,m
                                                   . - - rt.ver nr ur omncr.ury u            ,

ACTTON LEVEL RESPONSE 1903.10 ESC PAGE ~ 32 of 61 7 - ARKANSAS NUCLEAR ONE aevisioN CHANGE 2 DATE DATE o6/10/81 I

. . -m.- -                                                                                                                                                   ---                         ,-

ARKANSAS POWER & LIGHT COMPANY '

 "T                     "

Arkansas Nuclear One -m -r - - TITLE: EMERCENCY ACTION LEVEL RESPONSE l FORM NO-1903.10H REV. #' PC f

            ~

Page 1 of 3 , J._ SITE EMERGENCY W 3: SHIFT ADMINISTRATIVE ASSISTANT ,.

         "-                                                               NOTIFICATION LIST AND RECORD DK.'E INI11ALS/ TIME
      +                                                                                                      =
1. Complete as much of Form 1903.10M, "EAL NotificatitioWs p available information and time allows.

NOTE: The order of notification may be rearranged as the situation dictates with approval of the Shif t Oper-ations Supervisor. These groups should be contacted 74" gM by the most expedient means available (paging, con- __

      - ' '                                             tacting appropriate response center for relaying information, direct phone call, radio contact, etc.).

The phone numbers (plant personnel) provided are

          /g , ,

for use if an individual is not onsite, the appro-priate respoue center has not been manned, etc.

2. Previde the initial information on Form 1903.10M to the following groups:

2.1 Duty Emergency Coordinator (a duty roste.r is main- / s tained in the Shif t Supervisor's of fice; if not on-

     , a                                                site, refer to Attachment 1 for telephone numbers as                                                            :a     ,e.
    ][                                                  necessary.                                        .J                                                      'l j'.'7 H E' ? '

2.2 Nuclear Regulatory Commissio1 (Hotline; or _

                                                                                                                                     /                                       ..

(if the region of fice is contacted, request that this . information be forwarded to the Bethesda Emergency Operations Center)]. NOTE: If the Technical Operations Control Center

    .                                                         has been activated, the Technical Og e:: tions                                                                         ,

Control Officer may be contacted in isca of

w. .g g the Health Department.

2.3 Arkansas Department of Health . [orcontact / the OES . _ _ _ _ . for use the OES r3dio' channel) and request n.em to notify the Health Department]. 2.4 Emergem y Teams requiring immediate response (refer to the indicated attachment for call list if team personnel are not currently onsite). NOTF The following minimum information should be pro-vided to the team leader: affected unit, EAL

 . -o--     . ' ",,                                           declared, appropriate plant conditions / parameters,
                    ~9

[7",;;.$' .$ required response and suggested protectire actions (if necessary). f*-;

                                                                                                                                                                    ;@QN O f;C'  M7 M.
        *: ;;        ]?
                                                                                                                                                                           ~ ' r. .

y b

    -...d            - ,         .            -
                                                   . ~ - . s
                                                                      ~....%..7        , , , , , ,- m     ,,                                           ,
               .o                      g                                                                                           . .     . .
                                                .         PLANT MANU AL SECTION:                    PROCEDURE / WORK PLAM TITLE:                                          NO:                                    ;
                              , .           ~

to t' \ l _ mrncency pT Av . . FMERGENCY ACTION LEVEL RESPONSE 1903.10

  ~ ,.+y .e.                            *)        -     -        - , - -              -           --             --

PAGE 33 of 61 O' ARKANSAS NUCLEAR ONE Revision ,2 DATE CHANGE DATE 06/10/81 l t

   -- ,.e      .
                                                                                                                                                                     . ~ ~                              . , . -
  , ~ , _                                                                    ARKANSAS POWER & LIGHT COMPANY                                                           .

Arkansas Nuclear One W- EMERGENCY ACTION LEVEL RESPONSE l FORM PdO- 1903.10H R.EV. # # PC f - Page 2 of 3

5. ,' DATE i- INITIALS / TIME
          ,'                                                    2.4.1          Evacuation Team (Attachment 2)                                /
    ,                                                           2.4.2          Fire Team (Attachment 3)                                      /

2.4.3 Medical Team (Attachment 4) / 2.4.4 Radiation Team (Attachment 5) /

 .hdk6}a    ~~ ~                                                                                                                                                                           ' '

NOTE: If the Emergency Control Centet has been s activated, the Incident Response Director [ '{ ,, r may be contacted in lieu of the Little Rock Control Center. 2.5 Little Rock Control Center _ [or contact / either the OES or the MSS Dispatch Center and request them to notify the LRCC). 2.6 Emergescy Teams.ug requiring immediate response (refer

         ? '.                                                   to the indicated attachmert for call list if team per-                                                                        '.
f. . ;.j ; sonnel are not currently onsite). .
                                                                                                                                                                      . 4. -; -? Q
                                                                                                                                                                                    'y ...1.
                                                                                                                                                                                       .~e-
                                                                                                                                                                                              . 7-
                 .~                                NOTh:                  The follosing minimum information should be pro-                                                                **

vided to the team leader: affected unit, EAL declared, appropriate plant conditions /paramters, " a request to assembly the team onsite and suggested protective actions (if necessary).

             .                                                  2.6.1          Evacuation Team (Attachment 2)                                /                                                       ,

2.6.2 Fire Team (Attachment 3) _

                                                                                                                                             /                                ,

i 2.6.3 Medical Team (Attachment 4) / 2.6.4 Radiation Team (Attachment 5) / NOTE: If the Technical Support Center has been activated, this center s;ay be contacted in lieu of individual contacts. l ' ', _ -Y:f.* :f

  .s.ge                                                                                                                                                                         t.sq. .

1

                  '.                                                                                                                                                                        n ,.

{ . 9 l

  • Di.. e, _ . .
                                    , .             s-
                                                           ,.   .w    - -
                                                                               -....asr.           7e   ,,,,y,,,     ,   ,.                         _
                                  ~
- g.u . .                      -

PLANT M ANUAL SECTION: PROCEDUREN!ORK PLAN TITLE: I NO:

                                               =
                              *.           I         I
                                   ,                 ,           r rror.ruev nr w                                 rMrnesMcy ACTTON TEVEL RESPONSE                               1903.10 I"S1' *1 KANbAS kbCLE R ONE                                          'E a

CHANGE SmN . YDAt! DATE 06/1o/81 , l l 1 I l 4 I l gy m -- n~ ~ ,. ARKANSAS POWER & LIGHT COMPANY e- - Arkansas Nuclear One - - ~ . - - TITtE: EMERGENCY ACTION LEVEL RESPONSE l FORM NO.1903.10H . Rr/. #

  • PC i Page 3 of 3 -

DATE . INITIALS / TIME 2.7 Technical Support Center Personnel (refer to Attach- / _ ment 6 for call list). * *

          ,                                                                                                                   f .#~
  • 2.8 Operations Support Center Personnel (refer to' Attach- /

ment 7 for call list). 2.9 Other Emergency Response Organization personnel (refer / to Attachment 8 for call list). 4'4jf st g - NOTE: If the Technical Support Center has been activated, this center may be requested to contact the Resident

            ,.,                                                                NRC Inspectors.

2.10 NRC Resident Inspectors (either one) / 2.10.1 W.D. Johnson ( j

                                                                                                                        /

2.10.2 L.J. Callan-- . 3 3. Notify the Duty Emergency Coordinator / Recovery Manager / , _

    ,                                                              that the initial notifications have been made (inform                                                             %i , c                      '

him of any individuals that contact could not be~~made

                                                                                         ~

a., - with). , , .

4. Provide updates to the following groups until relieved of .

responsibility: 4.1 Duty Emergency Coordinator / Recovery Manager 4.2 Nuclear Regulatory Commission . 4.3 Arkansas Dep etne tt of Hemi*h or Technical Operations M r ~~ - - " Control Center (.s directed). 4.4 Little Rock Control Center or Emergency Control Center (as directed).

5. At the termination of the event, this form and other applicable information should be turned over to the Duty Emergency Coordinator / Recovery Manager.

Shift Administrative Assistant Q1E TZ ..._ . , : . ; *gr f ?y .

    .~
                 ;     *k                                                                                                                                                        -hN$                                  :
        ,,9
  • m 9 e
                                     *u..-W8E)   m        .e   h hg. ge6g 4 % .g
                                                                                     .d6hN 4.M[WQ W p   ggghqgp   ggg       y  qg i e                                                               ,
                                                   ,                                                                                            . ~ - . . . .         ...             . _ . . . .
                           .                    PLANT MANUAt.SECTION:                 PROCEDURE / WORK PLAN TITLE:                            NO:

_ === l l

. , . . , . . .             . ]           _

rwncrvry Mw c =- -- - .-- F*fFRCFNCY ACTION LEVEL RESPONSE

                                                                                                    '~

PAGE ~35 of 61 1903.10 O C582 - ARKANSAS NUCLEAR ONE nevisiON 2 oA1E e6/10/81 CHANGE DATE I

         ~~                                                                                                                                 ..m.~_.                    _...

ARKANSAS POWER & LIGHT COMPANY " - ' ~ Arkansas Nuclear One TITLE: EMERGENCY ACTION LEVEL RESPONSE l FORM NO. 1903.101 REV. #' PC # Page 1 of 3 SITE EMERGENCY g DUTY EMERGENCY COORDINATOR .. NOTIFICATION LIST AND RECORD DATE INITIALS / TIME

1. Notified that Site Emergency Emergency Action Level has /

been declared, based on the following conditions (list): M*1%Yk4 - - - l'D V

2. Relieve the Shift Operations Supervisor of tne following /

Duty Emergency Coordinator responsibilities, if not previously accomplished: 2.1 Providing direction to emergency response personnel. 2.2 Calculating the magnitude of radiological rele'ase. 2.3 Performing follow-m, notification- to the following .. groups: 2.3.1 Nuclear Regulatory Commission 2.3.2 Arkansas Department of Health or Technical Operations Control Center (as directed) ,

    • d 2.3.3 Little Rock Control Center or Emergency . , _ _ _ ' __ ,

Control Center (as directed) 2.3.4 General Manager 2.4 Directing onsite protective actions. /

3. Activate the Technical Support Center Staf f , if not pre- _
                                                                                                                            /

viously done (refer to Attachment 6 for call list as necessary). x-i.e . _ y'f

                                                                                                                                                        ~~      ;

m S

            *"'**sA-,6*~.. v e } . s }   s.           ,      ,
          ~                          '
     .c.: c -                             '
                                .                PLANT MANUAL SECTION:                        PROCEDUREiWORK PLAN TITLE:                                                                                                                         NO:
                                     =
                           ~. i   pI Q         ,_perocreev pyy                                        .

PMrRC N Y ACTTON LEVEL RESPONSE 1903.10 ({ 'csta b ' ARKANSAS NUCLEAR ONE "^Y RE = " 'd 2 u 06no/81 N/ CHANGE DATE I

    . ,-             -e                                                                                                                                                                                                                                      . . .        -        ..
   ~~ - - " " - "

m ARKANSAS POWER & LIGHT COMPANY - - . Q TITLE. Arkansas Nuclear One EttERGENCY ACTION LEVEL RESPONSE l FORM NO. 1903.10I REV. #' PC # Page 2 of 3 DATE INITIA!.S/ TIME 4 Activate the Operational Support Center Staf f e if not pre- / viously done (refer to Attachment 7 for call list as necessary). 5. Notify remaining (plant staff) Emergency Response Organiza-tion personnel (refer to Attachment 8 for call list as / necessary. gfylt wM 6. Assign personnel to. perform the followice duties (if not previously done): / g 6.1 Man open phone links between the Control Room and the n,,/ Technical Support Center. 6.2 Update status boards. 6.3 Perform magnitude of release calculations. 6.4 Maintain a log of personnel reporting to the Technical SuPrort Center or the Emergency Control Cer.ter. '* 6.5 ' other duties as necessary to support the l'ndident response. ..' 7. Update the Control Room periodically on the status of per-sonnel reporting onsite or emergency response centers betag activated. 8. Dispatch the Offsite Radiological Monitoring Section of the / ' Emergency Radiation Team to assess the effects of the situa-tion on the environment. i

 %tnwa -nN                                                                                                                                                                                                                                            ._s       .m    _         .-
9. Consider use of the following protective actions:

9.1 Limit access to site. 9.2 Plant Evacuation. 9.3 Exclusion Area Evacuition. t7 f.~k.

                                                                                                                                                                                                                                                        ...         &    D .i    l's w" lt.                 ;-                                                                                                                                                                                                                               ~
                                                                                                                                                                                                                                                             -      .e]'    .
                          -]                                                                                                                                                                                                                                             ,.

V .

                @+ ' * *p   A
  • g-ys-,= ..e 4k e., enn .e-. .,'.vg+=,-4*',a rO. %***

f er M e. 4. g3Pe1* FM e yegrM*M

  • Q %hTW M*)  % f.F[ 98.-. $ f QN *Se #W O '. N ** -. - k' I
         -ft.L                . . . . .,.

PLANT MANUAL SECTION:

                           ,.             m                                             PROCEDURE / WORK PLAN TITLE:                                       NO:

1 vwenemvey PTAV

   . w ..                ~          v         .

FMFRGENCY ACTION LEVEL RESPONSE 1903.10 l ' . PAGJ 37 of 61

    ~)

C2 - ARKANSAS NUCLEAR ONE aEvisiOu .2 DATE 06/10/81 CHANGE DATE I

       .+ 1   ~ '                                                                                                                                   - MM*MA.ss..r u e. w ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One                                                  . _ . . . . _ _

TITLE. EMERGENCY ACTION LEVEL RESPONSE l FORM NO.1903.10I , REV. #* PC i Page 3 of 3 , DATE

         -t                                                                                                                                                         .
           .9 ;',

INITIALS / TIME

                  -                               9.4 Area Evacuation (if an Area Evacuation is deemed
         ,'                                              necessary, contact one of the following groups (call P,

in the order indicated until contact la made): e 9.4.1 Arkansas Department of Health or Technical s Operations Control Center (as directed) 9.4.2 Arkansas Nuclear Planning & Response Program W3feith. y . . - _ . 9.4.3 Appropriate County Sheriff (Refer to Attach-

          ;.-o v                                                      ment 1. " Emergency Telephone Numbers" for phone numbers)
10. Wen the following Emergency Response Organization personnel arrive onsite, transfer the indicated responsibilities to them:

10.1 Recovery Manager (Direction of Corrective and /

       ?                                                 Recovery Actions)                                                                                             ,           ,

1%

                                                                                                                                                                  ..(      .
                                                                                                                                                         . ,9 y .7E . '

10.2 Site Security Coordinator (Direction of Security / / " Evacuation Teats personnel) , 10.3 Emergency Services Coorainator (Direction of the Fire / and Medical Team personnel) 10.4 Health Physics & Chemistry Superintendent (Direction /

       .                                                  of the Radiation Team)                                                                -
%w 4
11. E en item (10) has been completed, turn over this notifi- ,

cation. List and record and other pertinent documents to .. .y_c___t_. l the Recovery Mar.ager. l l 12. At the termination of the event, the following summaries shall be provided: 12.1 A verbal summary to: 12.1.1 Nuclear Regulatory Commission / 12.1.2 Arkansaa Department of Health / TC 1 q' f

     .i l             <,                           12.2 A written summary of the event (provided to the groups                                                   "-- 2*;#.7    '

indicated an step 12.1). O- t* [ ', y - u ,

                                                                                                                                                                        ~ .                      l
         ).-                                                                                           Duty Emerg:ccy Coordinator 1

WY- _. -

PLANT mat 1UAL SECTION: PROCEDURE / WORK PLAN TITLE- NO: a2e9 g) b ,,_n.m,,r..,.,,,.

                   .   .m .. --       n. y ur             .

rurocrwv wriny TM'EL RESPONSE

                                                              - - - - - -                              1903.10 PAGE     38 of 61 il     "A             ARKANSAS NUCLEAR ONE                                         Revision   2 DATE

\/ 06/10/81 CHANGE DATE 9.0 GENERAL EMERGENCY 9.1 Classification Criteria 9.1.1 Projected or measured dose rates at the site boundary from either unit exceeds 5 mR/hr whole body or 25 mR/hr to the thyroid for actual meterological conditions. 9 1.2 Loss of two out of three fission product barriers with a' potential loss of the third barrier. Loss of fuel cladding integrity must involve greater than 1% failed fuel (or equivalent reactor coolant system activity); loss of reactor coolant system integrity must involve leakage in excess of makeup capacity; loss of containment integrity must involve mechanical equipment failure (containment purge valves not closed, airlock cannot be closed) or structural damage which would result in uncontrolled leakage from the reactor building. 9.1.3 Ongoing security threat within the Control Room or vital areas. 9.2 Personnel Responsibilities And Required Actions For the General Emergency Emergency Action Level, the following actions

                                                                                                         ~

shall be taken by members of the Initial Response Organization and Emergency Response Organization, as defined in the Arkansas Nuclear One Emergency Plan: 9.2.1 Shift Operations Supervisor. A. Once the Shift Operations Supervisor has determined that-the General Emergency Action Level should be pla~ted into effect, he shall:

1. Assure the appropriate procedures are being imple- .

mented to mitigate the consequences of the unusual  ; plant conditions.

2. Implement the General Emergency Emergency Action I Level notificaticas, and record these notifica- l tions as shown on Form 1903.10J of this procedure.
3. Direct the activities of the Initial Response Organization until relieved by the Duty Emergency Coordinator.

g- 4. Direct Operations personnel and unit operations. \s _ r

  • PLANT MANUAL SECTION:
           .         meu                             PROCEDUREN/CRK PLAN TITLE:                      NO:
                 .u h  Eg ncEncy PEAN           *      '

EERGENCv v'rTM TTVEL RESPONSE 1903.10 esa m i PAGE 39 of 61 i o/ N- ARKANSAS NUCLEAR ONE Revision CHANGE 2 oATE DATE 06/10/81 9.2.2 Shift Technical Advisor A. The Shift Technical Advisor shall assist the Shift Operations Supervisor in incident assessment. 9.2.3 Shift Administrative Assistant A. When directed by the Shift Operations Supervisor, the Shift Administrative Assistant shall initiate the Gdneral Emergency Shift Administrative Assistant Notification List and, Record, Form 1903.10K of this procedure. The Shift Administhative Assistant shall also respond to incoming calls to the control room durinE the incident. B. In the absence of the Shift Administrative Assistant, the Shift Operations Supervisor shall appoint an individual to initiate the General Emergency Shift Administrative Ass'istant Notification List and Record. If additional assistance is needed, the Shift Operations Supervisor may appoint individuals to assist in performing noti-fications. C. The Shift Adminstrative Assistant shall assist operations ("%) (_ personnel as directed by the Shift Operations Supervisor. 9.2.4 Duty Emergency Coordinator , A. If not on site, the Duty Emergency Coordinator shall report to the site shen notified of a General Emer-gency. He shall direct emergency response'opbrations so as to free the Shift Operations Supervisor to

                                                                                                             ~

oversee reactor operaticas. B. The Duty Emergency Coordinator shall initiate the General Emergency Duty Emergency Coordinator Notifi-cation List and Record, Form 1903.10L of this proce- .

                                       ,. dure.                                                                  l C.      If a radiological release is involved, the Duty Emer-gency Coordinator shall direct the implementation of appropriate onsite protective actions, and shall pro-vide offsite radiological assessment information to offsite authorities responsible for implementing offsite emergeAcy measures.

9.2.5 Emergency Response Team Leaders , g-) A. The Emergency Response Team Leaders or Alternates are  : (,j notified by the Shift Administrative Assistant that a General Emergency has been declared. d 9 4

a PLANT MANUAL SECTION: PROCEDUREW/ORK PLAN TITLE- NO: meu

     -. c  pi 1

J Mg EM nCENCY PLAN ' EM#P""ev AcTTny LEVEL RESPONSE 1903.10 PAGE n, C23 ARKANSAS NUCLEAR ONE aEvision 40 of 61 2 DAre \,/ 06/10/81 CHANGE DATE B. The Emergency Response Team Leader or Alternates shall call out and assemble the teams. The Team Leader or Alternate shall report to the Duty Emergency Coordinator when the team is assembled. 9.2.6 Incident Response Director A. The Incident Response Director is notified by the Little Rock Control Center that a General Emergency-has been declared. B. The Incident Response Director shall report to the Emergency Control Center when notified that a General Emergency has been declared. 9.2.7 Recovery Manager - A. The Recovery Manager is notified by the Shift Administrative Assistant that a General Emergency has been declared.

                                                                        ~

B. The Recovery Manager shall immediately report to the Onsite Technical Support Center when notified () that a General Emergency has been declared. 9.2.8 Operations Manager A. The Operations Manager is notified by the Shift Admin-istrative Assistant that a General Emergency has been declared. _ B. The Operations Manager shall immediately report to the -- Onsite Technical Support Center when notified that a . General Emergency has been declared. 9.2.9 Maintenance Manager . A. The Maintenance Manager is notified by the Shift Administrative Assistant that a Site Emergency has been declared. B. The Maintenance Manager shall immediately report to the On-site Technical Support Center when notified that a Site

  • Emergency has been declared.

p O _

l l l

                     .                                                                                            l PLANT MANU AL SECTION:     PROCEDURE /.VORK PLAN TITLE                      NO:

4 i IN r ryypggery pi gy . FMFRCFNCY ACTION LEVEL RESPONSE 1903.10 n n c583 -]$- ARKANSAS NUCLEAR ONE PAGE Revision 41 of 61 2 DATE 06/10/81

 \/

CHANGE DATE 9.2.10 Operations Superintendents A. The Operations Superintendent are notified by the Shift Administrative Assistant that a General Emergency has been declared. B. The Operations Superintendent shall immediately report to the Control Room of their respective units and inform the Onsite Technical Support Center of their presence in the Control Room. 9.2.11 Health Physics and Chemistry Superintendent A. The Health Physics and Chemistry Superintendent is notified by the Shift Administrative Assistant that a General Emergency has been declared. B. The Health Physics and Chemistry Superintendent shall immediately report to the Onsite Technical Support Center when notified that a General Emergency has been declared. g-) 9.2.12 , Nuclear and Engineering Support Superintendent V A. The Nuclear and Engineering Support Superintendent is notified by the Shift Administrative Assistant that a General Emergency has been declared. s B. The Nuclear and Engineering Support Superintendent shall immediately report to the Onsite Technical Support Center when notified that a General Emergency has been declared. 9.2.13 Technical Support Manager - A. The Technical Support Manager is notified by the Little Rock Control Center that a General Emergency . has been declared.  ; B. The Technical Support Manager shall immediately report to the Emergency Control Center when notified that a General Emergency has been declared. 9.2.14 Maintenance Superintendents A. The Maintenance Superintendents are notified by the Shift Administrative Assistant that a General Emer-gency has been declared. (D 'J O

PLANT 4.NUAt SECTION: PROCEDUREN!ORX PLAN TITLE: NO: EMERGENCY PLAN L . EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 42 of 61 (l 'V / ARKANSAS NUCLEAR ONE REVISION CHANGE 2 DATE DATE 06/10/81 B. The Maintenance Superintendents shall immediately report to the Onsite Operational Support Center when notified that a General Emergency has been dec1.ared. 9.3 Te_rmination of Emergency Action Level 9.3.1 The General Emergency Emergencey Action level may be de-escalated to a lower Emergency Action Level or be termi-nated by recovery from the event. - S.3.2 The General Emergency Emergency Action Level may be closed out af ter being terminated by a briefing by the Recovery " Manager of the appropriate offsite authorities. A written summary of the event shall be transmitted to the NRC and appropriate offsite authorities. 9.4 Forms 9.4.1 The following forms describe the notifications and records to be made by the appropriate individuals for the General Emer-gency Emergency Action Level. Date the form where indicated (if the date changes before the form is complete, indicate the new date on the appropriate initial / time line). As noti- /~^s fications are completed, initials and time should be placed 5/ on the line in the right hand nargin by each step. Other pertinent data (e.g. person contacted) may also be noted adjacent to each step, as appropriate. 9.4.2 Form 1903.10J - General Emergency Shift Operations Supervisor Notification List and Record. 9.4.3 Form 1903.10K - General Emergency Shif t Administrative Assistant Notification List and Record. 9.4.4 Form 1903.10L - General Emergency Duty Emergency Coordinator Notification List and Record. l l l l

/~'

(-) l 1 l l l

                        - *:?
                                                      .                     PLANT M ANUAL SECTION:                   PROCEDURE / WORK PLAN TITLE:                                                      NO:

4 _l ' m ncpvey pram . FMFRGENCY ACTION LEVEL RESPONSE 1903.10

                      , %..v.         .,     .M,. ) ,'                       , . . - -                    4
                                                                                                                                                        ,       pace            43 of 6L I:EE -                               ARKANSAS NUCLEAR ONE o)%

Revision CHANGE 2 DATE DATE 06/10/81

                     . _.w            +.,                                                                                                                                                                  .mw.                    m.-
                   - -                                                                              ARKANSAS POWER & LIGHT COMPANY                                                                                       -

Arkansas Nuclear One . Tn LE. EMERGENCY ACTION LEVEL RESPONSE lFORMho. 1903.10J REV . # ' PC # GENERAL EMERGENCY Page 1 of 2 SHIFT OPERATIONS SL'PERVISOR NOTIFICATION LIST AND RECORD DATE

                                                                                                                                                         .s_      INITIALS / TIME
1. The General Emergency Emergency Action Level has been /

declared based on the following conditions (List): P.156k &A - C /~T. < V

2. Direct the Shif t Technical Advisor to the Con: rol room. /

1 Direct the Shift Admiristrative Assistant to ipU.iate the / notifications specified on Form 1903.10K (the t.r&-r of notifications may be rearranged as necessary). Assign . personnel to assist as necessary. , ,

4. If a radiological release is involved (unless previously relieved of this responsibility' =+

4.1 Direct appropriate personnet to perform the calcul- / ations per 1904.02 (2904.02), " Magnitude of Release

                                                                                        - Unit 1 (2)"

4.2 Provide radiological release information to the per-

  • r.onnel responsible for making follow-up reports (SAA,  ;

ew. .% TSC, ECC, etc.). - -- - 4.3 Direct the implementation of appropriate onsite pro-tective actions (unless relieved of this responsibility).

5. Notify onsite personnel that i General Emergency has been /

declared, and describe the nature of the emergency.

6. Direct operating personnel to continue to closely monitor plant parameters (provide specific parameters as dictated by the situation).
                      .WC' Nj"c! .
                                       . 3
                                                                                                                                                                                                                .~. - l t q .-
                                                                                                                                                                                                                           ,w
                                                                                                                                                                                                                                        ;. t
                       " jf* *       .* <
  • t-s
                                                                                                                                                                                                                           ',<:. 6         -
                                           *                                                                                                                                                                                  ~

s G' . f n e- . *W'g=.A., ,e .9 9= w a. g - - P me. " o ge= . E. 44 t e,.e #4 we9 e ,$F#N M.e-j MW h% W.* y'ge aupW6 *?* ## *f'[kMM 4 *pyW jVpM*M e he ) T

  • M y>- f D # . N -" I* A - .-

p , j

s PLANT MANUAL SECTION: PROCEDURETWORK PLAN TITLE:

                                         ===                                                                                                                NO:

r gl vm ncvvey r>r AM

               ,,3...                .          .   . . . . . -              ~ .,

EMERGENCY ACTION LEVEL RESPONSE 1903.10

                                         -}H ARKANSAS NUCLEAR ONE PAGE~             44 of 61 D                        .. C53C                                                                                     Revision               2 oATE              06/10/81
                                                                                                                                                                                                         )

CHANGE DATE i I

                                                                                                                                                                 .,~                    -      .....

ARKANSAS POWER & LIGHT COMPANY -

                                                                                                                                                                      -~ -

3 _ Arkansas Nuclear One . TITLE. EMERGENCr ACTION LEVEL RESPONSE l FORM NO. 1903.10J RL' . #

  • PC #

Page 2 of 2 DATE INITIALS / TIME

                                                                                                         ~
7. Perform the duties of the Duty Emergency Coordinator tntil relieved of those responsibilities (refer to 1903.10L).
8. Maintain . log of the incident (this may be delegated to other personnel as available).
9. At the termination of <r Emergency Action Level, this W7Id.*At Notification List and Scord should be turned over to the Recovery Manager.

[ t SHIFT OPERATIOVS SUPERVISON V - [ ^ 4 g g a B

 , ,%                4                                                                                                                                  y          . ~ _ , . .-_.                 _m i

l

           **3       '
t-
  • y, fy' !

N ?:.

                               .                                                                                                                                                                         i l

1 l ye,.~..........,--....,._..,.m.,,.._...,,.,_.,_.y...,....ym.._,.m..m,_,,.__.,.,_l i

 . . _ , ,                              . ....                   ...m.          .. - . . . . ~.. .               ..       .               .

7 .: e.-- - 7- PLANT MANUAL SECTION: - PROCEDUREMORK PLAN T TLE: - NO:

                                ".             =
.e.e..,                                              l          ...e.              o e ~ e.      . .   ... -          - . *       . * -

gwpegerpr m WFnhNU Y 1EiTON LEVEL RESPONS'E 190'3.10 1 l ikKANSA5 kUCLE R ONE '7smN R 2" DITE 06/10/8t CHANGE DATE t g , - _ . , .,_ y- ARKANSAS POWER & LIGHT COMPANY

^:S                                           F                                                              Arkansas Nuclear One
                                                                                                                                                                                                        ~ ~ " " ' ~                         '

TITtt EMERLENCY ACTION LEVEL RESPONSE l FORM NO.1903.10K REV. # A PC #

            ,                                                                                                                                                        Page 1 of 3 CENERAL EMERGENCY
                .                                                                                    SiiIET ADM!NISTRATIVE ASSISTANT                                                                            

f NOTIFICATION LIST AND RECORD

            ; .                                                                                                                                              DATE I.NITIALS/ TIME
                                                                                                                                                 * ~

a

1. Complete as much of Form 1903.10M, "EAL Notification?.oas -

available information and time allows. NOTEi The order of notification may be rearranged as the situation dictates with approval of the Shift Oper-ations Supervisor. These groups should be contacted wyh ' j ' by tt'e most expedient means available (paging, con- , tacting appropriate response center for relaying information, direct phone call, radio contact, etc.). s,,, The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appro-priate response ceater has not been manned, etc.

2. Provide the initial information on Form 1903.10M to the
              ,                                               following groups:                                                                                                                    ,

2.1 Duty Emergency. Coordinator (a duty roster ia main- / tained in the Shift Supervisor's office; if not on- -'" c.

       .,                                                               site, refer to Attachment I for telephone numbers as necessary.
                                                                                                                                                                                                       -yy (.p'    '
                                                                                                                                        .                         i                                                       .
          .                                                  2.2 Nuclear Regulatory Commission [ Hotline; or                                                  /          /

(if the region office is contacted, request that this - information be forwarded to the Bethesda Emergency Operations Center)]. NOTE: If the Technical Operations Control Center has been activated, the Technical Operations Control , i Officer may be contacted in lieu of the Health m%.,q Department. ' - - - -- - ' ' 2.3 Arkansas Department of Health . [orcontact / the OES 1._ , y .or use the OES radio channel) and request them to notify the Health Department). 2.4 Emergency Teams requiring immediate response (refer to the indicated attachment for call list if team personnel are not currently onsite). *

        'v;                                                 FrTE:               The following minimum information should be pro-vided to the team leader: af fc.ted unit. EAL q,43-- '               j                                                       declared, app;opriate plant conditions /parr aeters,
                                                                                                                                                                                                       , ;; .y . . .y z., -y,..-
 .                ,-   ;                                                         required response and suggested protective actions                                                                                   .

g-y;. (if necessary). ,g -;' Jg;,. l' t

                     *"     % g e A-.,9PT*   .. .        D .s'h   g ge    M .64      .8'4   ...%g      , w/ 4. e w @pg a gq g w gg , pqq    ge      =

gp a p . g, , p

              .                                   e                                                                                                                   ----      =~~~-       - - . . .                ---
       - 3 .*, .
                                                                                                                                                                                 ~                       __
                                             ,       PLANT MANUAL SECTION:                         PROCEDUREN/ORK PLAN TITLE:                                          N O-
                               ,..      =

N - . l l

   . wg.                ..         ,Q
                                                    .em-ocruev v pw w - - prAu                      - ._, .. .

FMvnCFNCY ACTION LEVEL RESPONSE 1903.10 pgg,;

                                                                                                                                                 .46 of 61 N-                      ARKANSAS NUCLEAR ONE 0                                                                                                                                    Revision CHANGE 2 oATE DATC 06/10/81 I

ARKANSAS POWER & LIGHT COMPANY r Arkansas Nuclear One -- - . TITtt EMERGFt'CY ACTION LEVEL RESPONSE l FORM Nc. 190$.10K , REV. #' PC f Page 2 of 3

        . ~ ,__                                                                                                                  DAZ                                                  -

[ INITIALS / Tit'E

            .,                                             2.4.1              Evacuation Team (Attachment 2)                              /
         'I         <

2.4.2 Fire Team (Attachment 3) / 2.4.3 ffedical Team (Attachment 4) / 2.4.4 Radiation Team (Attachment 5) / . ,.g' ,yg

  • NOTE: If the Emergency Control Center has been .-

activated, the Incident Response Director may be contacted in lieu of the Little Rock Control Center. t  ? 2.5 Little Rock Control Center'. - ,/,or contact / either the OES or the MSS Dispatch'denter and request

     ,                                                     them to notify the LRCC).

2.6 Emergenc, Teams not requiring immediate response (refer to the indicated attachment for call list.if team per-

  • sonnel are not currently onsite).
       ~ . .~

h :. . .

    -               <'                             NOTE:              The following minimum information should-tI pro-                                                  2   ' '
                                                                                                                                                                          ~

vide to~the team leader: affected unit, EAL declared, appropriate plant conditions /paramters,

             -                                                                                                                                                       ~

a request to assembly the team onsite and suggested . protective actions (if necessary). 2.6.1 Evacuation Team (Attachment 2) / 2.6.2 Fire Team (Attachment 3) / .

 *' 4                                                      2.6.3           .Pfedical Team (Attachment 4)                                  /
                                                                                                                                                                  ~'-                   --             -
                                                                                                                                                                                                              --~

2.6.4 Radiation Team (Attachment 5) / NOTE: If the Technical Support Center has been activated, this center may be contacted in lieu of individual contacts.

        'fp .
  ~@*.} j*  ,
                                                                                                                                                                              .<.-.,.,o.;                     g.-

4:sh W.. l g;., . .- .

       ,y,-                                                                                                                                                                 .                        -

a

                                                                                                                                                      =

8 . ppyer

  • W W. "hp gig..g-'gg4"  % gay *g9g g gi.g g ,

s . t ', PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

  ~ y". ,      ,         ..,

EMERGENCY PLAN - EMERGENCY ACTION LEVEL RESPONSE 1903.10, PAGE 47 of 61 () y ARKANSAS NUCLEAR ONE aEvisioN , 2 DATE CHANGE Dt.i 'E 06/10/81

 -wmi                                                                                                          _
                                                                                                                                                         ,w 4c y .. -
   ..nn                                                                  ARKANSAS POWER & LIGHT COMPANY                                                            , , . . ~ .                . .

Arkansas Nuclear One mLE. EMERGENCY ACTION LEVEL RESPONSE l FORM NO. 1903.10K REV . # ' PC f Page 3 of 3

         .-                                                                                                                  DATE                                         '._

INITIALS / TIME 2.7 Technical Support Center Personnel (refer to Attach- /

  • ment 6 for call list). , ,-

s 2.8 Operations Support Center Personnel (refer to Attach- / ment 7 for call list). 2.9 Other Emergency Response Organization personnel (refer / to Attachment 8 for call list). NOTE: If the Technical Support Center has been activated,

            ,-                                                         this center may be requested to contact the Resident i / W                                                               NRC Inspectors.
  • 2.10 NRC Resident Inspectors (either one) /

2.10.1 W.D. Johnson f

                    .                                            2.10.2     L.J. Callan                  !
3. Notify the Duty Emergency Coordinator /Recc.rery Manager / . '

that the initial notifications have been made (inform 1 i

       .,,.                                                him of any individuals that r.catact could not be made **                                                    '

with).

4. Provide updates to the following groups until relieved of respous'5111ty:

4.1 Duty Emergency Coordinator / Recovery Manager 4.2 Nuclear Regulatory Commission 4.3 Arkansas Department of Health or Technical Operations Control Center (as directed). s 4.4 . M.t le Rock Control Center or Emergency Control Center (as directed).

5. At the termination of the event, this form and other applicable information .

should be turned over to the Duty Emergency Coordinator /Recos ery Manager.

        . . , ,                                                                                              Shift Administrative Assistant
          .' s                                                                                                                                    u
                                                                                                                                                         .v s . v ~. a . ..r                   .

rj 1 y _.Uf. . '. . - l h8 9 I 's "$'8_ % $ op . .g h ., he g e' 9 , p_ g . g

  = * ' . .

1

l PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO: .. , ,, EMERGENCY PLAN -

  • EMERCENCY ACTION LEVEL RESPONSE 1903.10 PAGE 48 of 61 O ARKANSAS NUCLEAR ONE aEvisioN CHANGE 2 oATE DATE 06/10/81 mor .. ' ' ' " ' ' ~

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One 4 TITLE: EMERGENCY ACTION L' VEL RESPONSE l FORM NO. 1903.10L REV . # ' PC # GENERAL EMERGENCY DUTY EMERGENCY COCRDINATOR NOTIFICATION LIST AND RECORD DATE INITIALS / TIME

1. Notified that General Emcrgency Emergency Action Level has /

been declared, based on the following conditions (list): 4 7-sM@W4Meifets*

2. If not previously accomplished, complete the Site Emergency Emergency Duty Emergency Coordinator Notification List and Record (Form 1903.101).
3. Turn over this Notification List and Record and other per-tinent documents and notes to the Recovery Manager.

Lu'j Emergency Coordinator wvW+e W@'A My wi / ~j , 1 ._ O - i

                                                                                                                                                                                                                            )
.%...        m s . , .. . , . . . . - _         _ . . .        ,_          . .

l

l PLANT MANUAt SECTION: P9OCEDURE;V/ORK PLAN TITLE: NO-

          ~

1 ru.~rocevev uran r*mncrvcv ACTTON LEVEL RESPONSE 1903.10 l PAGE 49 of 61 C58C n\_/ ARKANSAS NUCLEAR ONE #EwsioN 2-DATE 06/10/81 CHANGE DATE 10.0 ATTACHMENTS NOTE: The forms relating to specific Emergency Action Levels are located at the end of their. respective Emergency Action Level Sections. 10.1 Form 1903.10A - Unusual Event Shift Operations Supervisor Netification List and Record; (Section 6.4). 10.2 Form 1903.10B - Unusual Event Shift Administrative Assistant Notifi-cation List and Record; (Section 6.4). 10.3 Form 1903.10C - Unusual Event Duty Emergency Coordinator Notification List and Record; (Section 6.4). 10.4 Form 1903.10D - Alert Shift Operations Supervisor Notification List and Record; (Section 7.4). 10.5 Form 1903.10E - Alert Shift Administrative Assistant Notification List and Record; (Section 7.4). 10.6 Form 1903.10F - Alert Duty Emergency Coordinator Notification List and Record; (Section 7.4). ' n (,_) 10.7 Form 1903.10G - Site Emergency Shift Operators Supervisor Notification List and Record; (Section 8.4). 10.8 Form 1903.10H - Site Emergency Shift Administrative Assistant Notification List and hecord; (Section 8.4). 10.9 Form 1903.10T - Site Emergency Duty Emergency Coordinator Notification List and Record; (Stc? ion 8.4). 10.16 Form 1903.100 - General Emergency Shift Operations Supervisor - Notification List and Record; (Section 9.4). 10.11 Form 1903.10K - General Emergency Shift Adminisicative Assistant . Notification List and Record; (Section 9.4).  ; 10.12 Form 1903.10L - General Emergency Duty Emergency Coordinator Notification List and Record; (Section 9.4). 10.13 Form 1903.10M - Emergency Action Level Nctification; (Section 10.0). 10.14 Attachment 1 - Duty Emergency Coordinator Roster / Call List; (Section 10.0) 10.15 Attachment 2 - Emergency Evacuation Team Roster / Call List; (Section 10.0) g G -

l PLANT M ANUAL LECTION: PROCEDUREN/ORK PLAN TITLE: NO-h:

         -         FMvpcvNry piAV        .      .

F'fERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 50 of 61 (a CSE ARKANSAS NUCLEAR ONE -Revision 2 DATE 06/10/61 %) CHANGE PATE 10.16 Attachment 3- Emergency Fire Team Roster / Call List; (Section 10.0) 10.17 Attachment 4 - Emergency Medical Team Roster /C ll List (Section 10.0) 10.18 Attachment 5 - Emergency Radiation Team Roster / Call List; (Section 10.0) 10.19 Attachment 6 - Technical Sapport Center lioster/ Call List; (Section 10.0) 10.20 Attachment 7 - Operational Support Center Roster / Call List (Section 10.0) 10.21 Attaclaent 8 - Remaining Emergency Response Organization (Plant Staff) Roster / Call List; (Section 10.0) 10.22 Attachment 9 - Emergency Telephone Numbers (Outside Assistance); (Section 10.0). se I A

PLANT M ANUAL SECTION: PROCEDURET.'<ORK PLAN .* LE: NO: i rvrncrerv prAV , FMERGENCY ACTION LEVEL RESPONSE 1903.10 1- "- PAGE 51 of 61 l ARKANSAS NUCLEAR ONE aEvisioN 2 DATE 06/10/81 CHANGE DATE ATTACHMENT 1 DUTY EMERGENCY COORDINATOR ROSTER / CALL LIST NAME BADGE WORK HOME Basil Baker 110 Tom Cogburn 1;I Early Ewing 400 , I Jim McWilliams 261 } l

                                                           '                                           l Jim O'Hanlon (Gen. Manager)         1 Dave Sne11ings                      398                                                        l I

i Bob Terwilliger 343 i

                                                                               . _ _ .           -- 1 (DEC = Beeper Number 602) ee
                                                                                                           +*

5 f

1 l PLANT M ANUAt.SECTION: PROCEDURENIORK PLAN TITLE: NO: b; Y rnspcrvrv pram , FMFRGENCY ACTION LEVEL RESPONSE 1903.10

            ~                                                                           PAGE     52 of 61 17             N-               ARKANSAS NUCLEAR ONE                                 aEvis>ON ,2   DAre       06/10/81 CHANGE        DATE ATTACIIMENT 2                                                                       ,

EMERGENCY EVACUATION TEAM ROSTER / CALL LIST , BADGE WORK HOME TEAM LEADER: _ Jackie Crow 160 ALTERNATE TEAM LEADERS: J. C. Garrett 395

              ,            Bruno Hampton                404 Wes McDaniel                 258 MEMBERS:

Mike Myers 461 John Beaty, Jr. 120 Roger Hooper 217 James Starr 333 Barbara Wade 1063 Barbara Dunn 168 , Jim Vandergrift 354 , Dennis Barton 115 Don, Moore 268 , 9 Jim Wilson 497 Jim Constantin 153 Ron Hart; rove 473 Joe Simmons 319 Ed Wentz 365 f Tracey Green 196 Ira Mosquito 271 124 i j Joe Waid

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO: EMERGENCY PLAN . . EMERGENCY ACTION LEVEL RESPONSE 1903.10

          .                                                                 PAGE     53 of 61 aevisiON 1                 ARKANSAS NUCLEAR ONE                                CHANGE 2 D*TE'~

DATE esfiofai ATTACHMENT 3 EMERGENCY FIRE TEAM ROSTER / CALL LIST BADGE WORK HOME TEAM LEADER: John Lamb 449 \

                                                                                                          \

l

ALTERNATE TEAM LEADERS

Jim Bob Jackson 228 - Larry dunson 272 , i HEMBERS:

.                                                                                                             t David Eichenberger        171                                                               I t

Alex Smith 323 Charles May 255 Barry Waldron 418 Gary Kendrick 239 Tom Wilkins 372 Don Booker 116 Glenn Brooks 134 Kyle Jones 422 James Nichols 328

Chester Wetzel 477

{ Johnny Walker 362 l Marion Itall 202 l: -- l

PLANY MANUAL SECTION: PROCEDUREMORK PLAN TITtE: NO: EMERGENCY PLlN , EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 54 of 61

 -)  -

ARKANGAS NUCLEAR ONE aevisioN CHANGE

  • 2 oATE DATE 06/10/81 ATTACHMENT 4 EMERGENCY MEDICAL TEAM RCSTER/ CALL LIST BADGE WORK HOME TEAM LEADER:

Richard Gillespie 191 ALTERNATE TEAM LEADERS-Charles Ads:n 102 Dennis Calloway 139 MEMBERS: Bob Jackson 406 Richard Moredock 1850 Alan McArthur 98

   ,          Steve Stork                336 Mike Hoyt                   222 Gerald Bartlett            114 Albert Lane                 243 Douglas dutler              137

{ Wayne Cheatham 148 , Shirman Yancy 498 KaSandra Delph 165 Eileen Goulet (192) Debbie Rodgers 285 Royce Moore 269 l Bill Bice 144 Paul Ford 1889

                                                                      .. _ _ - .    .-~                                            )

l ( ) = Laminated Badge l l

  • NO:

PLANT M ANUAL SECTION: PROCEDURETWORK PLAN TITLE:

  • EMERGENCY ACTION LEVEL RESPONSE 1903.10 EMERGENCY PLAN .
  • PAGE 55 of 61
   ,T                                                                    aEvisiDu   2 ot1E     06/10f81 ARKANSAS NUCLEAR ONE                                CNANGE       DATE ATTACHMENT 5 EMERGENCY RADIATION TEA!! ROSTER / CALL LIST BADGE                    WORK                   HOME TEAM LEADER:

Matt Bolanis 88

                                                               .a ALTERNATF TEAM LEADERS:

Dale Wagner 360 Robert Green 195 Chuck Burchard 119 Atina Murray 274 Tom Nickels 332 MEMBERS Roger Owings 283 Jeff Garren 189 Ken Zelnica 382 Tim Smith 327 Steve Fowler 183 . I David Rebarchik 356 Charles Anderson 430 Maurice Ward 428 Wayne Wright 470 Sarah Nettles 436 l l

I e PLANT MANUAL SECTION: PROCEDURE /Wr9K PLAN TITLE: NO: EMERGENCY PLAN > +- EMERGENCY ACTION LEVEL RESPONSE 1903.10

 ,) '              ARKANSAS NUCLEAR ONE PAGE aEvisioN 50 of 61 2 DATE         06fiof81 CHANGE        DATE ATTACHMENT 6 TECHNICAL SUPPORT CENTER STAFF ROSTER / CALL LIST BADGE             WORK                 HOME           TSC
                                                                                                               ')

J. P. O'Hanlon 1 E. L., Ganders 488 >

                                                                                                            ,/-

I  ! B. A. Baker 110 D. D. Snellings 398 ,

                                                                                                 /-

4 l 1

  )

l l

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO: EMERGENCY PLAN > ** EMERGENCY ACTION LEVEL RESPONSE 1903.10

         -                                                                PAGE     57 of 61 l

O ARKANSAS NUCLEAR ONE aEvisiON , 2 DATE CHANGE DATE 06/10/81 ATTACHMENT 7 l l OPERATIONAL SUPPORT CENTER STAFF ROSTER / CALL LIST l BADGE k'ORK/OSC HOME l P. Jones 234 e V. C. Pettus 286 H. R. Tucker 350 T. H. Cogburn 151 E. C. Ewing 400 M. J. Bolanis 88 - I 8 G. L. Fiser 179 . I T. C. Baker 112 l S.R. Lueders 345

 )   !                                                                         I J. B. Leeb             449 f           H. L. Hollis           215 i           M. K. Bishop           3152 i

L _ __ _ . - W

l

           --*      PLANT M ANUAL LECTION:     PROCEDUREN/ORK PLAN TITLE:                      NO:

EMERGENCY PLAN ' EMERGENCY ACTION LEVEL RESPONSE 1903.10 F PAGE 58 ot 61

  .l                  ARKANSAS NUCLEAR ONE                                aevisioN    , 2 DATE   06/10/8L CHANGE          DATE            l ATTACIDIENT 8 REMAINING EMERGENCY RESPONSE ORGANIZATION (PLANT STA1F) ROSTER / CALL LIST NAME              BADGE              WORK             HOME L. W. Humphrey            410
                                                                                 \

J. H. Montgomery 118 - I 1

           ,<       PLANT MANUAL SECTION:      PROCEDURETWORK PLAN TITLE:                              NO:

FM9RCENCY PTAN * '* E!fERGENCY ACTION LEVEL RESPONSE 1903.10 F PAGE 59 of 61

 .)                    ARKANSAS NUCLEAR ONE                               aEvision CHANGE
                                                                                     . 2 oA1E DATE 06/10/81 ATTACHMENT 9                                Page 1 of 3 EMERGENCY TELEPHONE NUMBERS (OUTSIDE ASSISTANCE)

NOTE: All area codes are 501 unless otherwise noted. FEDERAL - Corps of Engineers (Dardanelle) Department of Energy (Radiological Emergency Assistance Team) Nuclear Regulatory Commission (Directorate of Regulatory Operations, Region IV) STATE Arkansas Nuclear Planning &' Response Program (Russellville) Arkansas State Department of Health i (Bureau of Environmental Health Services) Arkansas State Police (Clarksville)  !

                                                                                             \

Office of Emergency Services . (Conway) } l LOCAL POPE: Ambulance Service Sheriff's Department j Emergency Services (Office) t (Home) L YELL: Sheriff's Department l Emergency Services (Home) t JOHNSON: Sheriff's Department Emergency Services (Office) (Home) , LOGAN: Sheriff's Department l Emergency Services (Home)

    \

\ l l l l l

NO: PLANT MANUAt SECTION: PROCEDURENIORK PLAN TITLE:

                                                      *    **                                                        1903.10 EMERGENCY ACTION LEVEL RESPONSE EMERGENCY PLAN                                                   60 01 61 PAGE RevisiOu ,2 o ,1E                obfiuf st
       - -                   ARKANSAS NUCLEAR ONE                                 . CHANGE          DATE Page 2 of 3 LOCAL CONT.                                                                                      .

kUSSELLVILLE: Millard Henry Clinic Russellville Fire Department St. Mary's Hospital Arkla Gas Company 1 Missouri-Pacific Railway Co.  ! t

                                                                                                        }

KAEV ARK.'NSAS ?OWER & LIGHT ,- , ARKANSAS NUCLEAR ONE: Emergency Control Center g Main Guard Station \ Unit One Control Room Unit Two Control Room Vice President of Generation / Construction (Office)' LITTLE ROCK: (Home)

           )                                    (W. Cavanaugh)                                                     }

Director of Nuclnar Operations (Office)! (Home) (J. Griffin) l Public Affairs: Ralph Mitchell (Office)  ! (Home)

                                                    ~

l Charles Kelly (Office)j (Home) Gene Iferrington (Office) (Some) I Little Rock Control Center j E. Deaton (Office) RUSSELLVILLE: District Office: (Home)  ! J. Lee (Office) (Home) W. Harris (Office) (Home) , s Emergency Control Office l li 1 1 .

                 "                                                                                HO.

PLANT MANUAL SECTION: PROCEDUREiWORK PLAN TITLE: FMERCFNCY PLAN **

  • EMERGENCY ACTION LEVEL RESPONSE 1903.10
  • PAGE 61 of 61
    .T                    ARKANSAS NUCLEAR ONE                                aevisioN  , 2 oA1E      o6/10/81 CHANGE        DATE Page 3 of 3 OTIER AGENCIES                                                                       ,__ _ .      ._. ._

BABCOCK & WILCOX: Site Representative (T. Scott) (Home). Emergency Response Center COMBUSTION ENGINEERING: Site Representative (A. B. McGregor) (Home)} Emergency Response Center INSTITUTE OF NUC'SAR POWER OPERATIONS > NUCLEAR SAFETY ANALYSIS gENTER NUCLEAR ENERGY LIABILITY PROPERTY INSURANCE ASSOCIATION _ _ _ G e '{ i l}}