ML20039A730

From kanterella
Jump to navigation Jump to search
Public Version of Emergency Response Plan Implementing Procedures Containing Privacy Act Info.Subj Info Deleted
ML20039A730
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/20/1981
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20039A726 List:
References
PROC-810720-01, NUDOCS 8112210212
Download: ML20039A730 (32)


Text

%

I * -

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE- NO:

EMERGENCY PLAN OIL SPILL PREVENTION CONTROL PROCEDURE & COUNTERMEASURE PLAN 1903.24 PAGE 14 of 17 ARKANSAS NUCLEAR ONE aevision CHANGE 1 oATE DATE 5/9/81 Page 1 of 1 ATTACHMENT 2 h ~

Oil Spill Response Team Organization and Responsibilities The purpose of the ANO Oil Spill Response Team is to minimize the consequences of an oil spill upon the environment of Lake Dardanelle. The Oil Spill Response Team shall be activated per Section 4.4.3 of this procedure. Upon activation the team shall initiate action as described in Section 4.2 and Attachment 1 of this procedure. The Oil Spill Team leader shall be responsible for coor-dinating oil containment and clean up activities and reporting to the Technical Analysis Superintendent.

Call List For Oil Spill Response Team NAME PHONE Y

Team Leader Charles Adams 1 V V Alternate Team Leader Dennis Calloway Alternate Team Leader Tom Baker f .

Members Gary Lipham 1 i

V V Tom Blakenship l V V Clyde Butts j i V

Larry Greathouse :V Al Morgan Steve DeYoung ,

V 7 Sid Hawkins V 7 Mike Hall I

i l THE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS PROPRIETARY l - -- -_._

OR PRIVATE INFORMATION.

- . r.-.u.....'

.w. .

- ^

. . ". v . . . v :,. 'i .' '~ 'S

.3

.l 1

1 8112210212 811211 p -- - " J 1' " ' 1

{DRADOCK 05000313 Lgd. ,U, ,,'Y I- ~+ ~r < "- ~'" '~ m'--- n ' e: -i m; g'- 'l PDR > ~ " '  !

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITLE: NOTIFICATION RECORD FOPM NO. 1903.24B REV . # 0 PC #

D -

DATE/ TIME AGENCY PERSON CONTACTED PHONE CONTACTED USCG National Response Center '

State Dept. Pollution Control

& Ecology

\

V V AP&L G&C Technical Analysis Dale L. SwindleV : Office 97 7 Home V V V V AP&L G&C Technical Analysis Edward L. Green 7 Officep{

Home AP&L G&C Technical Analysis Sharon R. Tilley 7

Officef{

Home For information purposes, the following numbers are provided:

U.S. Coast Guard (Memphis) '

24-Hour Emergency EPA, Dallas 1 24-Hour Emergency l ~~ >

8

~

Corps of Engineers Other Agencies Notified:

DATE/ TIME AGENCY PERSON CONTACTED PHONE CONTACTED Person Making Notification:

THE MATERIAL CO.'.TAINED WITHIN THE SYM QI,Q.d,). IS -REQPRIET.qhy.q' OR PRIVATE INFO.t!ATION. Q]1, , _ . , ' , , , " ' '" .

. O, ICY II.Y-- ~ C CGGLOSUE

e PtANT M ANUAL SECTION: PROCEDURE / WORK PtAN TITLE: NO:

k EMERGENCY PLAN RUSSELLVILLE FIRE DEPARTMENT 1903.70 r I PAGE 2 of 2 ARKANSAS NUCLEAR ONE aavision CHANGE i oATE DATE 6/23/81 5.3 The Russellvilla Fire Department may verify the authenticity of the request by calling the applicable Arkansas Nuclear One Control Room:

5.3.1A V

Unit One : 7'(

5.3.2 Unit Two - !

5.4 On arriving, the Russellville Fire Department should report to the North Gate, unless otherwise instructed, 5.5 Notify Security that the Russellville: Fire Department has been called and inform them of the proper access point. Security guards should meet the fire trucks and escort them through the plant gates and to the scene of the fire.

5.6 At the scene of the fire, the Russellville Fire Department shall coordinate its activities with the ANO Emergency Fire Team Leader.

In the absence of the Emergency Fire Team Leader, the Fire Department shall request and coordinate the support of other fire departments.

5.7 If the Russellville Fire Department and ANO personnel require further assistance to fight a fire, the Russellville Fire Department should request and coordinate the support of other fire departments.

5.8 If a fire occurs in a radiation area, ANO personnel trained in radiation protection shall be available to assist the fire-fighting personnel. Fire-fighters should follow the instructions given by these ANO personnel for their protection.

6.0 ATTACHMENTS AND FORMS None THE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION. , , , , , , _ .

n_, .n r-n o en _

J E 99b!

PLANT MANUAL SECTION: PROCEDUREN/ORK PLAN TITLE: NO:

EMERGENCY PLAN POPE COUNTY SHERIFF'S DEPARTMENT 1903.71 N PAGE 1 of 3 aman ARKANSAS NUCLEAR ONE atvis>ON O oaTE an8/80 CHANGE DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the Emergency Plan relatid response of the Pope County Sheriff's Department should their assistance be required at Arkansas Nuclear One.

2.0 SCOPE This procedure applies to emergency situations involving evacuation requiring assistance from the Pope County Sheriff's Department.

3.0 REFERENCES

1 3.1 References Used in Procedure Prepacation:

3.1.1 State of Arkansas Emergency Operations Plan, Annex V - Arkansas Nuclear One Radiological Incident Response Plan.

3.1.2 Arkansas Nuclear One Emergency Plan.

3.1.3 Letter of Agreement between the Pope County Sheriff's Department and Arkansas Power & Light Company.

3.2 References Used in Conjunction with this Procedure:

None 3.3 Related ANO Procedures:

None 4.0 DEFINITIONS None 5.0 INSTRUCTIONS 5.1 If the assistance of the Pope County Sheriff's Office is required at Arkansas Nuclear One (ANO), the Pope County Sheriff's Office should be called at _.

or by means of the Sheriff's radio (when installed). Provide them with a description of the assistance required.

I 5.2 The Pope County Sheriff's Department may verify the authenticity of the request by calling the applicable Arkansas Nuclear One Control Room by means of:

5.2.1 Phone, or A. Unit One S B. Unit Two -

5.2.2 Sheriff's Radio TNE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION. g . .~.......; w..., ". . ' -e. . '. . . .t. . . C N P:m .v or n a w i W'ym n com %'EL:0 ;;3CLC3URE l

PLANT MANUAL SECTION: PROCEDUREAVORK PLAN TITLE: N O-EMERGENCY PLAN U.S. ARMY CORPS OF ENGINEERS 1903.77 PAGE 1 of 2 L ARKANSAS NUCLEAR ONE acvisioN O oATE 8/18/80 CHANGE DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the coordination of the U.Sg Army Corps of_ Engineers Emergency Plan related activities in the event of an unusual or emergency situation at Arkansas Nuclear One.

2.0 SCOPE This procedure is applicable to emergency situations requiring assistance of the U.S. Army Corps of Engineers.

3.0 REFERENCES

g 3.1 References Used in Procedure Preparation:

3.1.1 State of Arkansas Emergency Operations Plan, Annex V - Arkansas Nuclear One Radiological Incident Response Plan.

3.1.2 Arkansas Nuclear One Emergency Plan.

3.1.3 Letter of Agreement between the U.S. Army Corps of Engineers and Arkansas Power & Light Company.

3.2 References Used in Conjunction with this Procedure:

None 3.3 Related ANO Procedures:

None 4.0 DEFINITIONS None 5.0 INSTRUCTIONS 5.1 The U.S.

Nuclear Army (Unit One '-Corps of,Engineers One ,

Unit Two ha.s

-y___agreed toin cont the=ct grkansas following situations in order that appropriate actions may be taken:

5.1.1 Dardanelle Lake level increases above elevation 340 feet.

5.1.2 Dardanelle Lake level is projected to rise above elevation 340 feet.

5.1.3 Dardanelle Lake level must be drawn below elevation 335 feet.

5.2 Radiological Incident 5.2.1 Should an incident occur at Arkansas Nuclear One which re-quires evacuation and control of access to the Arkansas Nuclear One exclusion area, the Duty Emergency Coordinator shall contact the U.S. Army Corps of Engineers to request that boat access to the portions of the Lake Dardanelle '

within the exclusion area be controlled.

TIE MATERIAL CONTAINED WITHIN TIE SYMBCESQ. . EASUr$i$22.T;0N OR PRIVATE INFORMATION. -F[,3 10 Cr~si J 72 0 (

VF'NMOLD 90" ?U UC D:: CLOSURE

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITLE: EMERGENCY ACTION LEVEL RESPONSE FORM NO. 1903.10B REV. # 3 PC #

UNUSUAL EVENT Page 1 of 2 N SHIFT. ADMINISTRATIVE ASSISTANT NOTIFICATION LIST AND RECORD DATE INITIALS / TIME

1. Complete as much of Form 1903.10M, "EAL Notification" as available information and time allows.

NOTE: The order of notification may be rearranged as dictated by the situation with approval of the Shift Operations Supervisor. These groups should be contacted by the most expedient means available (paging, contacting appropriate response center for relaying information, direct phone call, radio contact, etc.). The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appropriate response center has not been manned, etc.

2. Provide the initial information on Form 1903.10M to the following groups:

2.1 Duty Emergency Coordinator (a duty roster is maintained /

in the Shift Supervisor's office; refer to Attachment 1 for telephone numbers as necessary).

2.2 Nuclear Regulatory Commission [ Hotline; or 7 'V m . /

(if the region office is contacted, request that this information be forwarded to the Bethesda Emergency Operations Center)].

2.3 Arkansas Department gf Health [7 . ~V (or contact /

the OES at or via the OES radio channel and request them to notify the Health Department)].

2.4 Emergency Teams requiring immediate response only (refer to the individual attachment for call list if team per-sonnel are not currently on site):

NOTE: The following minimum information should be provided to the team leader: affected unit, EAL declared, appropriate plant conditions / parameters, required response.

2.4.1 Security Personnel (7q 'V) or Evacuation / .

, Team (Attachment 2)

THE MATERIAL CONTAINED WITHIN THE SYPM.bAE5fdtbiM7M OR PRIVATE INFORMATION. gro10CG 2.723 g ygrHWN O E909 DUE'CO!SC' OCORE

ji ARKANSAS POWER & LIGHT COMPANY 4I Arkansas Nuclear One TITLE
EMERGENCY ACTION LEVEL RESPONSE FORM NO. 1903.10B REV. # 3 PC #

Page 2 of 2 N

DATE INITIALS / TIME 2.4.2 Fire Team (Attachment 3) /

2.4.3 Medical Team (Attachment 4) /

2.4.4 Radiation Team (Attachment 5) /

p 2.5 Little Rock Control Center (7.,- _

or contact /

either the OES or the MSS Dispatch Center and request them to notify the LRCC).

2.6 General Manager (y, --

< 'p) /

2.7 NRC Resident Inspectors (either one): /

2.7.1 W.D. Johnson ~i)Y 2.7.2 L.J. Callan )V

3. Provide updates, as necessary, to the following groups:

3.1 Duty Emergency Coordinator 3.2 Nuclear Regulatory Commission 3.3 Arkansas Department of Health 3.4 Little Rock Control Center

4. At the termination of the event, this form and other applicable information should be turned over to the Duty Emergency Coordinator.

Shift Administrative Assistant I

I THE MATERIAL CONTAINEDF..WITHIN OR PRIVATE INFORMATION. m ... m i nTHE a , i. ..SYMaQLS unn:a t (S). JS.PR P ' * "- " ' '. u^ .~, -

'a WlyiW4 n co0M PL'EL:0 C:CCLCCRE g

J

/

/

j ARKANSAS-POWER & LIGHT COMPANY l 4 Arkansas Nuclear One TIT m EMERGENCY ACTION LEVEL RESPONSE FORM NO. 1903.10C REV. # 3 PC #

9 UNUSUAL EVENT 'Page 1 c,f 2 D DUTY EMERGENCY C00RDI:'A70R .

NOTIFICATION LIST AND RECORD '

^

'DATE

~

- INITIAT5/'IhE ,

1. Notified that an Unusual Event Emergency Action Level has /

been declared, based on the following conditions (List):

, j* . i

. ._ . .).

5

/

2. If on-site, or if deemed necessary to repor't to site, /

record the time that the Shift Operatidas Supervisor was relieved of Duty Emergency Coordinator responsibilities. -

3. If a radiological release is involved:

3.1 Relieve the Shift Operations Supervisor of respon- /

sibilities for calculating the magnitude of radio- l' logical release.

4. Provide updates to the following groups, as necessary: 1 I

'p 4.1 General Manager -v. ,

/

4.2 NRC Resident Inspector (initially contacted) '

i 9 ,

4.2.1 W.D. Johnson )7 -

4.2.2 )

L.J. Callan {

5. At the termination of the event, provide a verbal summary .

to:

[

/ i 5.1 yf Nueg<

or ear Reeulatopy ) Commission (Hotline; - / ',

( '

5.2 Arkansas Department of Health v/ )v / ,

_ . ~ , . , . m .-. , , s -- n ,

THEMA;ERIALCONTAINEDWITHINTHESN -ffV'N k kANN _

OR PRIVATE INFORMATION. , .g * $0 ~ppe g 3',;;',CC'jg, i

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITLE- EMERGENCY ACTION LEVEL RESPONSE FORM NO. 1903.10E REV . # 3 PC #

Page 1 of 3

% - ALERT SHIFT ADMINISTRATIVE ASSISTANT NOTIFICATION LIST AND RECORD D.'.TE INITIALS / TIME

1. Complete as much cf Form 1903.10M, "EAL Notification" as available information and time allows.

NOTE: The order of notification may be rearranged as the sit-uation dictates with approval of the Shift Operations Supervisor. These groups should be contacted by the most expedient means available (paging, contacting appro-priate response center for relaying information, direct phone call, radio contact, etc.). The phone numbers (plant personnel) provided are for use if an individual is nr.t onsite, the appropriate response center has not been manned, etc.

- 2. Provide the initial information on Form 1903.10M to the following groups:

2.1 Duty Emergency Coordinator (a duty roster.is maintained /

in the Shift Supervisor's office; refer to Attachment 1

- for telephone numbers as necessary).

y 2.2 Nuclear Regulatory Commission [ Hotline; or p -

3 /

/ - (if the region office is contacted, request that this information be forwarded to the Bethesda Emergency Operations Center)).

y

) 2.3  ; or contact s

~, Arkansas the OES (-

gep utmeng or use of the Health O [7 (ES radio channel) and /

/ request them to notify the Health Department).

-[ 2.4 Emergency Teams requiring immediate response (refer to the indicated attachment for call out list if team personnel are not currently on site).

/ NOTE:

_ The following minimum information should be pro-

/

vided to the team leader: affected unit, EAL declared, appropriate plant conditions / para-meters, required response and suggested pro-P '

tective actions (if necessary). .

l PRCFR!ETAR'l INFORiwAil0N

, PCR 10 CFR 2.790 e rvi e a a4 e L 1,8 I 6'~e b e v i l' 8.) U n..Q g ( Q q.,9 y j _k

~

, /

l -

,THE MATERIAL CONTAINED WITHIN THE SYMBOLS (y) IS PROPRIETARY (

]R PRIVATE INFORMATION.

l

.].

em -v .

\

. Arkansas Nuclear One TITLE: EMERGENCY ACTION LEVEL RESPONSE FORM NO. 1903.10E REV. # 3 PC #

Page 2 of 3 DATE INITIALS / TIME 2.4.1 Evacuation Team (Attachment 2) /

, 2.4.2 Fire Team (Attachment 3) j /

2.4.3 Medical Team (Attachment 4) /

2.4.4 Radiation Team (Attachment 5) /

2.5 Operations Management (contact one of the following /

s individuals):

2.5.1 B.A. Baker \ E -

V 2.5.2 S.J. McWilliams ) )V 2.5.3 L.A. Taylor [ ]

y 2.6 Little Fock Control Center (y __.

or contact /

either the OES or the MSS Dispatch Center and request them to notify the LRCC).

2.7 Emergency Teams not requiring immediate response (refer to the indicated attachment for call list if team personnel are not currently onsite):

s NOTE: The following minimum information should be pro-vided to the team leader: affected unit, EAL declared, appropriate plant conditions / parameters, time team placed "on call."

2.7.1 Evacuation Team (Attachment 2) /

I 2.7.2 Fire Team (Attachment 3) /

2.7.3 Medical Team (Attachment 4) /

2.7.4 Radiation Team (Attachment 5) /

E .m m m,-,1 w.o j THE MATERI AL CONTAINED WITHIN THE Sp ch PRIVATE INFORMATION.

w5 [ET C ST,w=" ~N 8

v urn i Pc_ _s

. .3 c.eav MmMOLD ' TM PU900 O!?C'.C3tfRE

I I

1 ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITLE: EMERGENCY ACTION LEVEL RESPONSE l FORM NO. 1903.10E REV. # 3 PC #

Page 3 of 3 h -

DATE INITIALS / TIME y~__. p 2.8 General Manager ( /

2.9 N'RC Resident Inspectors (either one) j /

2.9.1 W.D. Johnson )

V 2.9.2 L.J. Callan )V 2.10 TOCC Liasion p

2.10.1 L. W. Schempp V(r /

3. Notify the Duty Emergency Coordinator that the initial /

notifications have been made (inform him of any individuals that contact could not be made with).

4. Provide updates to the following groups until relieved of this responsibility:

4.1 Duty Emergency Coordinator 4.2 Nuclear Regulatory Commission 4.3 Arkansas Department of Health (unless otherwise directed) 4.4 Little Rock Control Center (unless otherwise directed)

5. Unless required to report onsite, at the termination of the /

event, notify the individuals contacted in Step 2.7 above to secure from "on call" status.

6. At the termination of the event, this form and other ap-plicable information should be turned over to the Duty Emergency Coordinator.

Shift Administrative Assistant THE MATERIAL CONTAINED WITHIN THE S 'EbR rN =" '

q OR PRIVATE INFORMATION. jj,y,'i'*-j'_T'n'J.Th#

. , - . ~

{

Gruam

.m n mcu o02C C' CLC3URI

1 I

. H ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One l TITLE: EMERGENCY ACTION LEVEL RESPONSE FORM NO. 1903.10H REV. # 3 PC #

Page 1 of 3 A _

SITL EMERGENCY SHIFT ADMINISTRATIVE ASSISTANT NOTIFICATION LIST AND RECORD DATE INITIALS / TIME

1. Complete as much of Form 1903.10M, "EAL Notification" as available information and time allows. ,;

NOTE: The order of notification may be rearranged as the cituation dictates with approval of the Shift Oper-ations Supervisor. These groups should be contacted by the most expedient means available (paging, con-tacting appropriate response center for relaying information, direct phone call, radio contact, etc.).

The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appro-priate response center has not been manned, etc.

2. Provide the initial information on Form 1903.10M to the following groups:

2.1 Duty Emergency Coordinator (a duty roster is maintained /

in the Shif t Supervisor's office; if not on-site, refer to Attachment 1 for telephone numbers as necessary.

2.2 y

~

'y Nuclear Regulatory Commission (Hotline; or /_,_ /

(if the region office is contacted, request that this information be forwarded to the Bethesda Emergency Operations Center)) .

NOTE: If the Technical Operations Control Center has been activated, the Technical Operations Control Officer may be contacted in lieu of the Health Department.

V 2.3 ArkansasgepartmengofHealth[V._  ; or contact /

the OES ( ,' or use the OES' radio channel) and request them to notify the Health Department].

2.4 Emergency Teams requiring immediate response (refer to the indicated attachment for call list if team personnel are not currently onsite).

NOTE: The following minimum information should be pro-vided to the team leader: affected unit, EAL declared, appropriate plant conditions / parameters, ,

required response and suggested protective actions I (if necessary).

l l THE r.ATERIAL CONTAINED WITHIN THE SYMBOLS [] IS PROPRIF.TARY.

OR PRIVATE INFORMATION. FdiCf Rir i r46 I t h e v r r"<u N I PER 10 CFR 2.7 0 -

__....m.,

w 1 .

ennu onm e --

n a m0 E

l l

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITte EMERGENCY ACTION LEVEL RESPONSE F0F M h. 1903.10H

_ REV . # 3 PC #

l

\( ,

Page 2 of 3 DATE INITIALS / TIME 2.4.1 Evacuation Team (Attachment 2) /

2.4.2 Fire Team (Attachment 3) 4

/

2.4.3 Medical Team (Attachment 4) /

2.4.4 Radiation Team (Attachment 5) /

NOTE: If the Emergency Control Center has been activated, the Incident Response Director may be contacted in lieu of the Little Rock Control Center.

2.5 LittleRockControlCenter($  ; or contact /

either the OES or the MSS Dispatch Center and request them to notify the LRCC).

2.6 Emergency Teams not requiring immediate response (refer to the indicated attachment for call list if team per-sonnel are not currently onsite).

NOTE: The following minimum information should be pro-vided to the team leader: affected unit, EAL declared, appropriate plant conditions /paramters, a request to assembly the team onsite and suggested protective actions (if necessary).

2.6.1 Evacuation Team (Attachment 2) /

2.6.2 Fire Team (Attachment 3) /

2.6.3 Medical Team (Attachment 4) /

2.6.4 Radiation Team (Attachment 5) /

NOTE: If the Technical Support Center has been activated, this center may be contacted in lieu of individual contacts.

THE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION. PPD"!ETT ?'l !'.TCC""T'ON PEO 10 CFR 2.-~90 u, w,iTuum vou g.

, m e m < m iR F

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITLE: EMERGENCY LCTION LEVEL RESPONSE l FORM NO. 1903.10H REV . # 3 PC #

Page 3 of 3 DATE INITIALS / TIME 2.7 Technical Support Center Personnel (refer to Attach- /

ment 6 for call list).

2.8 Operations Support Center Personnel (' refer to Attach- /

ment 7 for call list).

2.9 Other Emergency Response Organization personnel (refer /

to Attachment 8 for call list).

NOTE: If the Technical Support Center has been activated, this center may be requested to contact the Resident NRC Inspectors.

2.10 NRC Resident Inspectors (either one) /

7 , _ _ _

2.10.1 W.D. Johnson )7 2.10.2 L.J. Callan / )

3. Notify the Duty Emergency Coordinator / Recovery Manager /

that the initial notifications have been made (inform him of any individuals that contact could not be made with).

4. Provide updates to the following groups until relieved of responsibility:

4.1 Duty Emergency Coordinator / Recovery Manager 4.2 Nuclear Regulatory Commission 4.3 Arkansas Department of Health or Technical Operations Control Center (as directed).

4.4 Little Rock Control Center or Emergency Control Center (as directed).

5. At the termination of the event, this form and other applicable information should be turned over to the Duty Emergency Coordinator / Recovery Manager.

. Shift Administrative Assistant THE MATERIAL CONTAINED WITHIN THE Ponte A " w=n -

OR PRIVATE INFORMATION. TM hd AM QT "'" N d F1.x utiT C lu '9 cr 30",PU91IP tt e..< - DICIIOCIIDE w

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITte EMERGENCY ACTION LEVEL RESPONSE FORM NO. 1903.10K REV . # 3 PC #

'E GENERAL EMERGENCY g SHIFT ADMINISTRATIVE ASSISTANT NOTIFICATION LIST AND RECORD DATE INITIALS / TIME

1. Complete as much of Form 1903.10M, "EAL Notification" as available information and time allows.

NOTE: The order of notification may be rearranged as the situation dictates with approval of the Shif t Oper-ations Supervisor. These groups should be contacted by the most expedient means available (paging, con-tacting appropriate response center for relaying information, direct phone call, radio contact, etc.).

The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appro-priate response center has not been manaed, etc.

2. Provide the initial information on Form 1903.10M to the following groups:

2.1 Duty Emergency Coordinator (a duty roster is maintained /

in the Shif t Supervisor's office; if not on-site, refer to Attachment 1 for telephone numbers as necessary.

V

~

V, '

2.2 Nuclear Regulatory Commission (Hotline; or _..

/

(if the region office is contacted, request that this information be forwarded to the Bethesda Emergency Operations Center)].

NOTE: If the Technical Operations Control Center has been activated, the Technical Operations Control Officer may be contacted in lieu of the Health Department.

epartment of Health [V V 2.3 .  ; or contact /

Arkansasg/

the OES ( or use the OES radio channel) and request them tF~ notify the Health Department].

2.4 Emergency Teams requiring immediate response (refer to the indicated attachment for call list if team personnel are not currently onsite).

NOTE: The following minimum information shotid be pro-vided to the team leader: affected unit, EAL declared, appropriate plant conditions / parameters, required response and suggested protective actions (if necessa ry) . -

THE MATERIAL CONTAINED WITHIN THE anic r Y3 te nonen v enov

  • N * ' #' E *
  • i OR PRIVATE INFORMATION. pre; . n nn- .- - g F Leg AU V F eT 4. / J V i,s, t-tT. U t. _. n_ l n C O n t .1 Di lDI 10 M'F] A O'

---~1D p E

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITLE.* FORM NO.

EMERGENCY ACTION LEVEL RESPONSE 1903.10K REV . # 3 PC #

Page 2 of 3

\

DATE INITIALS / TIME 2.4.1 Evacuation Teara (Attachment 2) /

2.4.2 Fire Team (Attachment 3) ,

/

2.4.3 Medical Teara (Attachment 4) /

2.4.4 Radiation Team (Attachment 5) /

NOTE: If the Emergency Control Center has been activated, the Incident Response Director may be contacted in lieu of the Little Rock Control Center. .

2.5 LittleRockControlCenter(I  ; or contact /

either the OES or the MSS DisFatch Center and request them to notify the LRCC).

2.6 Emergency Teams not requiring immediate response (refer to the indicated attachment for call list if team per-sonnel are not currently onsite).

NOTE: The following minimum informatica should be pro-vided to the team leader: affected unit, EAL declared, appropriate plant conditions /paramters, a request to assembly the team onsit e and suggested protective actions (if necessary).

2.6.1 Evacuation Team (Attachment 2) /

2.6.2 Fire Team (Attachment 3) /

2.6.3 Medical Team (Attachment 4) /

2.6.4 Radiation Team (Attaclunent 5) /

NOTE: If the Technical Support Center has been activated, this center may be contacted in lieu of individual contacts.

THE MATERIAL CONTAINED WITHIN THE SUW24-McPROPilMTA3V negJ OR PRIVATE INFORMATION. R T' /Pj MM 'n '.','A s ' '"" ' ' ~ ' j r u,, w v. n - . , ~

uaT':=: n mn'.i FU ic O'CCLG3UR

- '? ,

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITLE: EMERGENCY ACTION LEVEL RESPONSE FORM NO. 1903.10K REV . # 3 PC #

Page 3 of 3

\

DATE INITIALS / TIME 2.7 Technical Support Center Personnel (refer to Attach- /

ment 6 for call list).

2.8 Operations Support Center Personnel (refer to Attach- /

ment 7 for call list).

2.9 Other Emergency Pesponse Organization personnel (refer /

to Attachment 8 for call list).

NOTE: If the Technical Support Center has been activated, this center may be requested to contact the Resident h7C Inspectors.

2.10 NRC Resident Inspectors (either one) /

2.10.1 W.D. Johnson [' ')

2.10.2 L.J. Callan [ _

)

3. Notify the Duty Emergency Coordinator / Recovery Manager /

that the initial. notifications have been made (inform him of any individuals that contact could not be made with).

4. Provide updates to the following groups until relieved of responsibility:

4.1 Duty Emergency Coordinator / Recovery Manager 4.2 Nuclear Regulatory Commission 4.3 Arkansas Department of Health or Technical Operations Control Center (as directed).

4.4 Little Rock Control Center or Emergency Control Center (as directed).

5. At the termination of the event, this form and other applicable information l should be turned over to the Duty Emergency Coordinator / Recovery Manager.

~

Shift Administrative Assistant l .

THE MATERIAL CONTAINED WITHIN THE SgTh A N #4hf@Wd'V'CW OR PRIVATE INFORMATION. pg gg g,33 W M CLD F9OM OUp,K NgCLO$U Z

I 1

. l PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10  !

PAGE 51 of 61 l l

ARKANSAS NUCLEAR ONE aeviSiON CHANGE 3 DATs DATE 7/16/81 ATTACHMENT 1 g DUTY EMERGENCY COORDINATOR ROSTER / CALL LIST

-NAME BADGE WORK HOME Basil Baker 110 f v ,

Tom Cogburn 151 lv V V Early Ewing 400 V V Jim McWilliams 261 V V Jim O'Hanlon (Gen. Manager) 1 .

V 'V Dave Snellings 398 Y

Bob Terwilliger 343 l.

(DEC = Beeper Number 602) o,c onir- r s nv n. n- tqN h 1b a6 . O t

-- - - - - - - --n uyuri, r o' '-'.-i e I b/ L V I iWl'W 4 e U b. L.i V L/ 4 6 V L.w V U n TIE MATERIAL CONTAINED WITHIN TIE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFOR&\ TION.

l' l

  • PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

! FWRCrN*cv PLAN FWRGENCY ACTTON TrVFL RESPONSE 1903.10 r5i PAGE m ARKANSAS NUCLEAR ONE aavisioN 52 of 61 3 oats 7/16/81 CHANGE DATE ATTACICIENT 2 EMERGENCY EVACUATION TEAM ROSTER / CALL LIST

\ EADGE WORK HOME TEAM LEADER:

Jackie Crov 160 ALTERNATE TEAM LEADERS:

V V J. C. Garrett 395 Bruno Hampton 404 V V Wes McDaniel 258 MEMBERS:

Mike Myers 461 John Beaty, Jr. 120 V V Roger Hooper 217 -

1 James Starr 333 Y

Barbara Wade 1063 Y

Barbara Dunn 166 Y

Jim Vandergrift 354 Y

Dennis Barton 115 Y

J. Don Moore 268 Y

Jim Wilson 497 Jim Constantin 153 V 7 Ron Hargrove 473 Y

Joe Simmons 319 Y

Ed Wentz 365 Y

Tracey Green 196 Ira Mosquito 271 Joe WJid 124 ..

THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PRICPRIETARY OR PRIVATE INFORMATION. p F,'; _ T ,' C'[ ' l[

_C { 3 [.'.J.T . D .5 g M ?10 CJn 2./3U' _ __

M ;;O L D [ [ C ,1 P U E'_!C " 1 ' N n C.

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

rS If u EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPON.c'd PAGE 53 of 61 1903.10

"" ARKANSAS NUCLEAR ONE aevision 3 oars 7/1o/81 CHANGE DATE ATTACHMENT 3 g EMERGENC_Y FIRE TEAM ROSTER / CALL LIST BADGE WORK liOME, TEAM LEADER:

John Lamb 449 ALTERNATE TEAM LEADERS:

V V Jim Bob Jackson 228 Larry Munson 272 MEMBERS:

V V David Eichenberger 171 V V Alex Smith 323 Charles May 255 Y

Barry Waldron 418 Gary Kendrick 239 Y

Tom Wilkin: 372 V

Don Booker 116 Y

Glenn Brooks 134 Y

Kyle Jones 422 Y

James Nichols 328 Y

Chester Wetzel 477 7

Johnny Walker 362 Marion Hall 202 i

.- -._____ ...._. . ._ J -

PRCPC'ETAIJ '?:ICC:'ATiON FER iv urn c.790 WITA":r' D II.GM I':.'C  : C33RE THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PRIOPRIETARY OR PRIVATE INFORMATION. I

l l

  • PLANT MANUAL SECTION: PROCEDUREN/ORK PLAN TITtE: NO: l l

, EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 54 of 61 L ARKANSAS NUCLEAR ONE aEvisioN 3 oATE 7/to/81 CHANGE DATE ATTACHMENT 4 I g EMERGENCY, MEDICAL TEAM ROSTER / CALL LIST BADGE WORK HOME TEAM LEADER:

Richard Gillespie 191 ALTERNATE TEAM LEADERS: j Charles Adams 102 V V Dennis Calloway 139 -

MEMBERS:

Bob Jackson 406 Richard Moredock 1850 ,

Y Alan McArthur 98 Y

Steve Stork 336 Mike Hoyt 222 Y

Gerald Bartlett 114 Y

Albert Lane 243 Y

Douglas Butler 137 Y

Wayne Cheatham 148 Y

Shirman Yancy 498 l KaSandra Delph 165 Y

Eileen Goulet (192)

Y Debbie Rodgers 285 Y

Royce Moore 269 Y

Bill Bice 144 }

V V Paul Ford 1889

~ PSOPriiiDT/ 'I1CIi'//T'.0b

( ) = laminated Badge N iu crn 4./uv THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PRIOPRIETARY (;

OR PRIVATE INFORMATION.

PLANT MANUAL SECTION: PROCEDUREN/ORK PLAN TITtE: NO-EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 55 of 61 ARKANSAS NUCLEAR ONE aavisioN CHANGE 3 DAre DATE 7/16/81 ATTACHMENT S g EMERGENCY , RADIATION TEAM ROSTER / CALL LIST

, BADGE WORK HOME TEAM LEADER:

y ..

y Matt Bolanis 88 ALTERNATE TEAM LEADERS:

V  !

' 7 Dale Wagner 360 V ': 7 Tom Nickels 332 V 7 Robert Green 195 Chuck Burchard 119 V V Atina Murray 274 l

MEMBERS V V Roger Owings 283 Jeff Garren 189 ,Y Y

Ken Zelnick 382 .

Tim Smith 327 -

'Y Y

Steve Fowler 183 i i

Y David Rebarchik 356 f l V l V Charles Anderson 430  :

Y Maurice Ward 428 Y

Wayne Wright 470 Y

Sarah Nettles 436 N _

1 FROFaiETAiu .WFOI AAT:ON

! FER 10 Grn 2.73Cr

. u ,i v. . . ~ - - - ~ < -n,--,-..c ni n '.6 v vvi a 5 45 lb/LU 6 anVif6 4 YwL 6,, I y w w V w V i g g THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PRIOPRIETARY g OR PRIVATE INFORMATION.

l l

o l

l l

. PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO: )

, EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10-PAGE 56 of 61 ARKANSAS NUCLEAR ONE aswsioN CHANGE 3 oATE DATE m 6/81 ATTACHMENT 6 g TECHNICAL SUPPORT CENTER STAFF ROSTER / CALL LIST BADGE WORK HOME TSC y ._ _ _ _ _ _ _ - _ _ _ _ _ _ -

7

.I. P. O'Hanlon 1 (Beeper = 601)

V 7 E. L. Sanders 488 ,

l B. A. Baker 110 V A 7 D. D. Snellings 110

\

e i

l c o n o e , m , . , , . m .. - - .

-i.>

. v.. ..it.wil l M Av v. n 4..< s0 -

uv-ia,.4oa 4, %.r

, , 6., ,Ls/ 4 a 4 w 6T4 e w

- - - . . - , , - , . . , - - , ~ , ,

6 I\s aw e V %r a V C 's THE MATERIAL CONTAINED WITHIN THESE SYMBOLS (Y) IS PRIOPRIETARY OR PRIVATE INFORMATION. I

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 5/ of 61 ARKANSAS NUCLEAR ONE acvisioN CHANGE 3 oAre DATE 7/16/81 ATTACHMENT 7 g0PERATIONAL SUPPORT CENTER STAFF ROSTER / CALL LIST BADGE WORK /OSC HOME 7 _

_ 'y P. Jones 234 V. C. Pettus 286 V V H. R. Tucker 350 T. H. Cogburn 151 V 7 E. C. Ewing 400 M. J. Bolanis 88 ,

V 7 G. L. Fiser 179 i T. C. Baker 112 S.R. Lueders 345 J. B. Lamb 449 H. L. Hollis 215 V

  • M. K. Bishop 3152

.,.,-,,..,.,1 i.

....v. .... .. .

P4C 10 v. d 2./ ^ 0 W;T;';;OLO IIC:." IUCL'O D'CCLOCUP.E TIE MATERIAL CONTAINED WITHIN TIESE SYMBOLS ( ) IS PRIOPRIETARY OR PRIVATE INFORMATION.

(

a-

s PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

FsfvRcFNW PLAN FWRGENCY ACTION LEVEL RESPONSE 1903.10 r I PAGE 58 of 61 ARKANSAS NUCLEAR ONE Eision CHANGE 3 o4TE DATE m 6/81 i l

l ATTACHMENT 8

% REMAINING _ EMERGENCY RESPONSE ORGANIZATION (PLANT STAFF) ROSTER / CALL LIST NAME BADGE WORK HOME L. W. Humphrey 410 f

V 7 J. H. Montgomery 118

(

1 PROFRiETARY aEOR .iA710N .,

. itM IU Ut M 2./ bU W!THHOLD FEC" C"":t 'r rien osUP-THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PRIOPRIETARY g, OR PRIVATE INFORMATION. i

PLANT M ANUAL SECTION: PROCEDUREAVORK PLAN TITLE: NO:

EMERGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 59 of 61

. ARKANSAS NUCLEAR ONE aavisiOu CHANGE

~3 oatE DATE 7/16/81 ATTACHMENT 9 Page 1 of 3 g EMERGENCY TELEPHONE NUMBERS

-(OUTSIDE ASSISTANCE)

NOTE: All area codes are 501 unless otherwise noted.

FEDERAL -_

Corps of Engineers (Dardacelle) i Department of Energy (Radiological Emergency Assistance Team)

Nuclear Regulatory Commission (Directorate of Regulatory Operations, Region IV)

STATE Arkansas Nuclear Planning & Response Program (Russellville)

Arkansas State Department of Health (Bureau of Environmental Health Services)

Arkansas State Police (Clarksville)

Office of Emergency Services (Conway)  ;

\

LOCAL 3 POPE: Ambulance Service I, Sheriff's Department g Emergency Services (Office) ;

(Home)

YELL: Sheriff's Department Emergency Services (Home)

JOHNSON: Sheriff's Department Emergency Services (Office)

(Home)

LOGAN: Sheriff's Department Emergency Services (Home) l l FCCrrJ: TAR 7;NFCI. .iATIN l PER 10 CFR 2.7Ei-0

! W!THHCLD cpCM DEL!C D'SCLC4tRE l

THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PRIOPRIETARY OR PRIVATE INFORMATION. I

l PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

EMRGENCY PLAN EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 60 of 61 ARKANSAS NUCLEAR ONE aaision CHANGE 3 oats DATE 7/16/81 Page 2 of 3 LOCAL CONT.

RUSSELLVIp: Millard Henry Clinic Russellville Fire Department St. Mary's Hospital Arkla Gas Company i

Missouri-Pacific Railway Co.

KARV ARKANSAS POWER & LIGHT ARKANSAS NUCLEAR ONE: Emergency Control Center (

Main Guard Station i Unit One Control Room Unit Two Cont.rol Room j i

LITTLE ROCK: Vice Presiden (Office; Seniog(W.Cavanaugh)g,EnergySupply (Home)

Direcgor,Nucleargperations (Office)

(J. Griffin) (Home) .

t Director, Tech ical & Enviponmental (Office)

Services 9(D. Rueter) (Home)

Direcgor, Fossi1 0perations (Office)

(D. Sikes)9 (Home) ,

(Office)

Vicegresident,(C. Kelly)gorporateCommunications (Home)

Managgr, Co rpo r (Office)

(C. Dunn)gte Security (Home)

Little Rock Control Center i

RUSSELLVILLE: District Office: E. Deston (Office)

(Home)

V V J. Lee (Office)

(Home)

V V W. Harris (Office)

(Home)

Emergency Control Of fice THE MATERIAL CONTAINED WIT!!IN TIESE SYMBOLS ( ) IS PRIOPRIETARY ,

OR PRIVATE INFORMATION. pQepRt, , aR y ;, ,, CI'MT;Cij '

PEII 10 CFT2.7s0-

,u,., . u u rt. iv , - -

in i

- n e . e n c o, -

PLANT MANUAL SECTION: PROCEDUREMORK PLAN TITLE: NO:

FMTRCPNCY PTAN FMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 61 of 61 ARKANSAS NUCLEAR ONE aev>Sion CHANGE 3 oATE DATE 7/16/81 l

Page 3 of 3 OT1ER AGENCIESg ,

BABCOCK & WILCOX: Site Representative (T. Scott) (Home)

Emergency Response Center COMBUSTION ENGINEERING:

g(iteRepresentative A. B. McGregor) (Home) 4' V

Emergency Response Center INSTITUTE OF NUCLEAR POWER OPERATIONS NUCLEAR SAFETY ANALYSIS CENTER NUCLEAR ENERGY LIABILITY PROPERTY INSURANCE ASSOCIATION l

Titor'Mit a als . If!ICI,IiATlOli en in ~-, n Pmz s A %s' QS 4% s.e nn _

.e v

\ . \V.. /

TIE MATERIAL CONTAINED WITHIN TIESE SYMBOLS ( )'IS PROPRIETARY .

OR PRIVATE INFORMATION. '

. 1 PLANT MANUAL SECTION: PROCEDUREiWORK PLAN TITLE: NO: l ARKANSAS OFFICE OF I FMFRCFVCY PETM FMFRCFNCY CFRVTers 1903.75  ;

PAGE 1 of 2 l ARKANSAS NUCLEAR ONE a n isi a CHANGE o o*TE DATE an8/80 1.0 PURPOSE The purpose of this procedure is to provide guidance on the coordination of Office of Emergency Services (OES) and Arkansas Nuclear One activities in the evdnt of an Emergency Action Level (EAL) declaration at Arkansas

~

Nuclear One.

2.0 SCOPE This procedure is applicable to emergency situations involving Unit One and/or Unit Two which meet Emergency Action Level criteria.

3.0 REFERENCES

3.1 References Used in Procedure Preparat on:

i 3.1.1 State of Arkansas Emergency Operations Plan, Annex V - Arkansas Nuclear One Radiological Incident Response Plan.

3.1.2 Arkansas Nuclear One Emergency Plan.

3.1.3 Letter of Agreement between the Arkansas Office of Emergency Services and Arkansas Power & Light Company.

3.2 References Used in Conjunction with this Procedure:

None 3.3 Related ANO Procedures:

3.3.1 1903.10, " Emergency Action Level Response" 4.0 DEFINITIONS None 5.0 INSTRUCTIONS NOTE: The radio communication link to OES is to be used only if both commercial phones are inoperable.

5.1 In the event of a situation at Arkansas Nuclear One (ANO), which meets the criteria of Unusual Event, Alert, Site Emergency, or General Emergency (EAL) in the ANO Emergency Plan, the Shift Admi 9i strativ9 Assistant or othep designe9 shall contact OES by calling C (Little Rock) or s or by means of the OES radio. The Arkansas Office of Emergency Services should be provided with a description of the unusual or emergency situation.

I 5.2 The Arkansas Office of Emergency Services may verify this contact l by calling the Control Room back by:

l 5.2.1 Phone, or A. Unit One - [

B. Unit Two - .

.\

5.2.2 OES Radio THE MATERIAL CONTAINED WITHIN THE SD!BOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION. ____ __

/PhUFMit.1 _ _AnI

_ _ _ .iM

. _U

_ _Nivin

_ , , ,i ,_

6 ,0 N

.- --, ,,an_

,n m ,en AU Vi n -. --

ydT (('d MC UN@ C3 5  ;

1 1

PLANT MANUAL SECTION: PROCEDUREMORK PtAN TITLE: NO:

EMERGENCY PLAN ARKANSAS DEPARTMENT OF HEALTH 1903.76 PAGE 1 or 2 ARKANSAS NUCLEAR ONE aEvismN 1 om "un CHANGE DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the coordination of Arkansq Department of Health and Arkansas Nuclear One activities in

.the event of an Emergency Action Level (EAL) declaration at Arkansas Nuclear One.

2.0 SCOPE This procedure is applicable to emergency situations involving Unit One and/or Unit Two which meet Emergency Action Level criteria.

3.0 REFERENCES

3 3.1 References Used in Procedure Preparation:

3.1.1 State of Arkansas Emergency Operations Plan, Annex V -

Arkansas Nuclear One Radiological Incident Response Plan.

3.1.2 Arkansas Nuclear One Emergency Plan.

3.1.3 Letter of Agreement between the Arkansas Department of Health and Arkansas Power & Light Company.

3.2 References Used in Conjuction with this Procedure:

None 3.3 Related ANO Procedures:

3.3.1 1903.10, " Emergency Action Level Response" 4.0 DEFINITIONS None 5.0 INSTRUCTIONS 5.1 In the event of a situation at Arkansas Nuclear One (ANO) which meets the criteria of an Unusual Event, Alert, Site Emergency or General Emergency Emergency Action Level as described in the ANO E=ergency Plan, the Arkansas Department of Health will be contacted and provided with a description of the unusu 1 or emergency situation.

5.1.1 Arkansas Department of Health unless otherwise

~

directed.

5.1.2 Upon activation of the Technical Operations Control Center, follow-up notifications may be provided to this center, if so directed.

TIE MATERIAL CONTAINED WITHIN TIE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION. ,

iy m. .ui.su.. .... vn.n, .,a ION eEE10

.,..,,,~m CI". ,2.72,,.,,.n W,IT g (l 4\J L.LJ

& ' V . il & w% iv n.w, W'u% ne, ,q:W-

e. v %*, t
  • . i

~

PLANT MANUAL SECTION: PROCEDUREN/ORK PLAN TITLE: N O-MAGNITUDE OF RELEASE PROCEDURE MAGNITUDE OF RELEASE - UNIT 1 1904.02 l PAGE 4 of 25 l ARKANSAS NUCLEAR ONE aavisioN CHANGE 2 oATE DATE 7/t7/81 7.6.2 Compare the present readings to the values on which the latest projections have been made.

\ A. If the values have not deviated from the most recently checked column on Fora 1904.02A by more than the fol-lowing list, it is not necessary to make new projec-tions. New data should be taken as specified by the Duty Emergency Coordinator or the Dose Assessment Supe rviso r.

Indication Allowable Deviation Wind Direction 120 degrees Wind Speed 120%

00 1 New Atmospheric Stability Category At t New Atmospheric Stability Category CPM 120%

Flow Rate 120%

B. When the data recorded changes more than the allowable deviation and a new projection is made on that data, you may identify the data by checking the parenthetic box "()" in the top of that column on Form 1904.02A.

8.0 DATA CONVERSION 8.1 Complete Form 1904.02B to determine the following information. If site meteorological data is unavailable, limited meteorological data may be obtained from the following groups:

NOTE: If the Pasquil Atmospheric Stability Category cannot be obtained, substitute in category G (most conservative).

8.1.1 National Weath9 r Servicg (Meteorologist-in-Charge)

(, / or s.  ; or' /(reco rding)] .

_ m x 8.1.2 KARV Radio (. f.

8.1.3 MSS Dispatcher.

8.2 Complete Form 1904.02C to determine the gaseous release rate.

9.0 DETERMINATION OF DOSE RATE AND MAXIMUM PERMISSIBLE CONCENTRATION AT THE l

EXCLUSION AREA BOUNDARY l

l 9.1 Complete Form 1904.02D to calculate the following information:

9.1.1 Whole body dose rate at the Exclusion Area Boundary.

THE MATERIAL CONTAINED WITHIN THE SYMBOLS ( )ISPROPRIETg OR PRIVATE INFORMATION. . SCC",CCO,"%n een

!EAn' ip mhD

.Ae nn wwn v. s. , u - i

.. .,,. .u n, n etre u et !r 'n ~ c o' n e' 'c :

e ai.e r r v i iwww .

"a -

.v s.-

\

. i PLANT MANUAL SECEON: PROCEDURDWCRK PLAN TITtE* NO:

MAGNITUDE OF RELEASE PROCEDURE MAGNITUDE OF RELEASE - UNIT 2 2904.02 PAGE 4 of 24 ARKANSAS NUCLEAR ONE aavisioN CHANGE a o*1E DATE 7/20 fat Indication Allowable Devia* ion Wind birection 120 degrees Wind Speed +20%

\ 00 . [ New Atmospheric Stability Category at 1 New Atmospheric Stability Category CPM 120%

Flow Rate 120%

B. When the data recorded changes more than the allowable deeiation and a new projection is made on that data, you may identify the data by checking the parenthetic box "()" in the top of,that column on Form 2904.02A.

8.0 DATA CONVERSION 8.1 Complete Form 2904.02B to determine the following information. If site meteorological data is un-available, limited meteorological data may be obtained from the following groups:

NOTE: If the Pasquil Atmospheric Stability Category cannot be obtained, substitute in category G (most conservative). .

8.1.1 Natgonal Weagher Service (meteorologist-in-Charge) L '

or C' ,)<; or  ;'(recording)]. '

8.1.2 KARV Radio i , [) .

8.1.3 MSS Dispatcher.

8.2 Complete Form 2904.02C to determine the gaseous release rate.

9.0 DETERMINATION OF DOSE RATE AND MAXIMLH PERMISSIBLE CONCENTRATION AT THE EXCLUSION AREA BOUNDARY 9.1 Complete Form 2904.02D to calculate the following information:

9.1.1 Whole body dose rate at the Exclusion Area Boundary.

9.1.2 Child thyroid dose rate at the Exclusion Area Boundary.

9.1.3 The ratio of the actual to the maximum permissible concen-tration of Xe-133.

9.2 If an Emergency Action Level is NOT indicated, -eturn to Section 7.0.

New data should be taken as specified by the Duty Emergency Coordina-tor or the Dose Assessment Supervisor.

9.3 If an Emergency Action Level is declared (initial projection only),

identify, as necessary, the meteorological and effluent monitor data on Fo rm 2904.02A which was used in making the projection by checking the parenthetic box "()" at the top of that column.

l THE MATERIAL CONTAINED WITHIN THE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE IVFORMATION.

l . _ , . . . _

l P n u_n u. _ _ _ _ . .c.t.wra w v r m u d .

FE3 '0 STW2.79G YllTHHOI o FRoal ruhtic utND t-5mt..