Summary of 811117-19 Caseload Forecast Panel Meetings W/Util on Site Re Project Schedule & Status of Design, Procurement,Const & Startup Activities
ML20039A406
Person / Time
Site: Wolf Creek 
Issue date: 12/04/1981
From: Hopkins J
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8112170506
Download: ML20039A406 (4)


Text

,'

bl N

\\

/ q. ?$l(.L4[ ' '

MEETING

SUMMARY

DISTRIBUTION p

Docket File' G. Lear V

gEOS NRC PDR W. Johnston f

'#*g@7pgIr% /

S. Pawlicki Local PDR DEC 41981 TIC /NSIC/ Tera V. Benaroya 4

Z. Rosztoczy

/)s v

LB#1 Reading W. Haass g,'

\\s H. Denton/E. Case D. Muller cn R. Ballard D. Eisenhut/M. 'Jambor W. Regan R. Mattson B. J. Youngblood P. Check A. Schwencer F. Congel F. Miraglia

0. Parr J. Miller F. Rosa G. Lainas W. Butler R. Vollmer W. Kreger J. P. Knight R. Houston R. Bosnak F. Schauer L. Rubenstein R. E. Jackson T. Speis Project Manager J. B. Hookins M. Srinivasan Attorney, OELD J. Stolz M. Rushbrook S. Hanauer 0IE (3)

W. Gammill ACRS (16)

T. Murley F. Schroeder i

E. Adensam D. Skovholt M. Ernst URC

Participants:

R. Baer

. Be linger J. B. Hopkins K. Kn{el i

W. H. Lovelace G. Knighton R. C. Stewart A. Thadani D. Tondi J, Kramer D, Vassallo P. Collins

.D. Ziemann bcc:

Applicant & Service List 1

l l

8112170506 811204 PDR ADOCK 05000482 A

pyg

2 I

DEC 4 1991

~ Docket No.: STN 50-482 APPLICANT: Kansas Gas and Electric, Company,,,,,,

FACILITY:

Wolf Creek Generating Station, Unit,fio.1

SUBJECT:

SUfEARY OF CASELOAD FORECAST PAllEL, MEETINGS.,AND SITE VISIT Meetings were held on November 17 and 19,.1981. in Burlington, Kansas with representatives of the applicant to discuss the status of construction for the Wolf Creek facility. A site tour to witness the status of. construction l

was conducted on November 18, 1981.. The meeting' attendees are listed in l

the Enclosure. The meetings are summarized as. follows:

Summary l

The applicant made a detailed presentation, on. the project schedule and on the status of design, procurement, construction..and startup activities.

The activity receiving the most attention currently is the installation l

rate of small bore pipe. The applicant's current schedule, which is based on a critical milestone approach,_ projects.a. fuel load date of Decenicer_1983.

l At the exit meeting we advised the applicant that,. based on (1) the information

~

provided during the previous two days, (2) our observations during the sit,e.

tour, and (3) our assessment of the work remaining as compared.to that of s~

other facilities we have visited, we. projected that the most' lik'ely (or nominal) fuel load date for Wolf Creek is July 1984. The major considerations in this l

assessment were the status and rate of Installation,of,laroe bore pipe hangers, t

conduit, and instruaentation. We then mentioned that we wer2; however, impressed l

with their startup organization.

We stated that our fuel load date, projections are used to plan for our manpower l

requirements for the review of OL applic' tions and to establish schedules and a

priorities for their review. We further stated. that our projection for Wolf

~

Creek is a nominal date which may be bettered and that, i.f installation rates are increased, the applicant's fuel load date might be attainable; therefore, we do not suggest that the applicant revise their construction schedule to reflect our projected date.

i J. B. Hopkins, Project knager Licensing Branch No.1 l

Division of Licensing

_,Jiiiid..

4.4.9.t.t.f....s.t.B.@..

l.g.i..n.j...i.9..g.J..g.;.1.9.o.<

--o m..s,.

_n nac ronu ais oo-coi nscu o24o OFFICIAL RECORD COPY usom issi--mmo

Mr. Glenn L. Koester Vice President - Nuclear Kansas Gas and Electric Company 201 North Market Street Post Office Box 208 i

Wichita, Kansas 67201 cc: Mr. Nicholas A. Petrick Ms. Wanda Christy

-Executive Director, SNUPPS 515 N. 1st Street 5 Choke Cherry Road Purlington, Kansas 66839 i

Rockville, Maryland 20750 Eric A. Eisen, Esq.

Mr. Jay Silberg, Esquire Birch, Horton, Bittner & Moore Shaw, Pittman, Potts & Trowbridge 1140 Connecticut Avenue, N. W.

1800 M Street, N. W.

Washington, D. C.

20036 Washington, D. C.

20036 Kansans for Sensible Energy Mr. Donald T. McPhee Post Office Box 3192 Vice President - Production Wichita, Kansas 67201 Kansas City Power and Light Company 1330 Baltimore Avenue Post Office Box 679 Kansas City, Missouri 64141 Ms. Mary Ellen Salva Route 1, Box 56 Burlington, Kansas 66839 A. Scott Cauger, Esq.

Assistant General Counsel Public Service Commission P. O. Box 360 Jefferson City, Missouri 65102 j

Mr. Tom Vandel Resident Inspector / Wolf Creek NPS c/o U.S.N.R.C.

Post Office Box 311 Burlington, Kansas 66839 Mr. Michael C. Kenner Wolf Creek Project Director State Corporation Commission State of Kansas Fourth Floor, State Office Bldg.

Topeka, Kansas 66612

  • ?,

w-ENCLOSURE Wolf Creek Meeting Attendees November 17 and 19, 1981 NRC Kansas City Power & Light J. B. Hopkins F. D. Crawford W. H. Lovelace R. C. Stewart KEPC0 Kansas Gas & Electric L. J. Hamman

  • A. Mee E. W. Creel
  • M. L. Johnson SNUPPS T. D. Keenan G. L. Fouts R. L. Stright*

G.- L. Koester 4

G. P. Rathbun Bechtel N. L. Hill C. L. Huston*

J. H. Smith

  • F. T. Rhodes D. W. Prigel Union Electric R. Kloefkorn*

L. Koerper T. A. Esswein*

Daniel International Co.

Phoenix Power Services, Inc.

L. F. Warrick*

M. E. Stern **

T. D.'Borgman*

L. R. Smith WIBW-TV KCC W. Parker

  • W. Riker*

4 M. Keener

  • 1 Wichita Eagle-Beacon G. L. Haden Burlington Daily T. Dippel*

KTSB-TV T. Erskine*

G. Pennybacker*

  • November 17, 1981 only l*
    • November 19, 1981 only I