.j "1 1 MEETING
SUMMARY
DISTRIBUTION
/f e
.- 1 s
GDi@.kitt?Filf'f G. Lear
'6 NRC POR ~
W. Johnston f g'
Local PDR DEC 11981 S. Pawlicki 7 DE09 1981> J TIC /NSIC/ Tera V'. Benaroya 6; u--==*
Z. Rosztoczy q
LB#1 Reading W. Haass of,/)#, j H. Denton/E. Case D. Muller ff 6i R. Ballard D. Eisenhut/M. Jambor W. Regan R. Mattson B. J. Youngblood P. Check A. Schwencer F. Congel F. Miraglia
- 0. Parr J. Miller F. Rosa G. Lainas W. Butler R. Vollmer
. W. Kreger J. P. Knight R. Houston
.R. Bosnak L. Rubenstein F. S:.hauer R. E. Jackson T. Speis Project Manager J. Grant M. Srinivasan Attorney, OELD J. Sto.lz M. Rushbrook S. Hanauer OIE (3)
W. Gammill ACRS (16)
T. Murley F. Schroeder E. Adensam D. Skovholt M. Ernst flRC
Participants:
R. Baer J. Grant, J. Levine, M. Wohl, W. Meinke, C. Berlinger K. Kniel D. Muller, R. Samworth, M. Masnik, D. Cleary, S. Feld, J. Youngblood, A. Toalston, D. Codell G. Knighton A. Thadani D. Tondi J, Kramer D, Vassallo P. Collins D. Ziemann bec: Applicant & Service List l
l 4
e C
DEC 1 gar Docket flos.:
50-424 and 50-425 APPLICANT: Georgia Power Coacany FACILITY:
Alvin M. Vogtle Nuclear Plant, Unit Mos. I and 2 SU3 JECT:
SUt91ARY OF 11EETIrlG WITH GEORGIA POWER COMPAHY TO DISCUSS THE PROPOSED CCFITEllT OF Tile OPERATING LICENSE ENVIR0!P'EUTAL REPORT FOR V0GTLE Ut11T H0. 1 AND 2 A necting was held at l'RC Headquarters, 7920 Horfolk Avenue, Bethesda,11aryland on fionday af ternoon, l'ovenber 9,1981. The applicant, Georgia Power Company, was represented l'y renbers of Southern Company Services. The NRC was represented by nonbers of the Division of Licensing, Division of Engineering and Division of Systems Integration. An attendance list is attached as Enclosure 1.
This recting Nas requested by Geornia Power Company to discuss the proposed content of its Operating License Environnental Report (OLER) for Alvin W. Vogtle Plant, Unit flos.1 and 2 (Vectle 1 ?> 2). The applicant intends to submit the OLER for Vogtle 1 A 2 in Septenber 1993. This report will be based on the guidance of Regulatory Cuide 4.2 (RG 4.2), " Preparation of Environnental Reports for Nuclear Power Plants,"
Revision 2, July 1976 and supplemental guidance received at this meeting.
Each section of the proposed OLER for Vogtle 14 ? was discussed. Areas in which neu and/or further quidance was given include: cost-ber.efit analysis; biological studies, in particular, fish harvest studies; neteorological data; demography statistics; location and effects of transmission facilities and corridors; Class-9 accident analysis, in particular, liquid pathways; floodplain nanagement; radiological assessnent; and socio-economic effects.
The staff enphasized throughout the rectinn that the applicant should not simply repeat information already provided in the Censtruction Perait Environmental Report (CPER). If significant changes have occurred between the CP and OL stages, and these changes inpact plant operation, then the applicant must identify such changes and submit whatever information is necessary for the staff to conduct a comprehensive environmental review.
omcc) sun ~4ut) omy OFFICIAL RECORD COPY uom. im-mu
. hAC f 0RM J15 (1040} NRCM 024a
1 0f'C Dl The staff further noted the following two items:
- 1) because RG 4.2 pertains core to the CP than to the OL stage, certain chapters do not totally apply to the OLER. However, the staff advised the applicant to include these chapters - 4, 4 and 10 -
in the OLER in order to remain consistent with the RG 4.2 outline.
The staff further advised that any sections of Chapters 4, 9 and 10 that are indeed applicable to the OLER be addressed accordingly, and sections that are not pertinent be addressed with a short, explanatory statenent; and 2) the applicant nay reference the Final Safety Analysis Report (FSAR) whenever the same infomation is requested in both the OLER and FSAR.
J. f t. Grant, Project itanager Licensing Dranch Mo. 1 Division of Licensing
Enclosure:
As stated cc w/ encl.: See next pace
~Y/
n DL : Lp,j,1,,3,,,,,D,L,,g omce>
susmus > J.t.1!i.U..ri,(D,g,,,
B,y,y,
,,n,
,lgg,d 12/01/.81 12/ /......
uny NRC FORM 3t3 00@) NRCM Om OFFICIAL RECORD COPY usam i..i-m m
Mr. Doug Dutton Vice President - Project Management Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 cc: Mr. L. 1. Gucwa Chief Nuclear Engineer Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Vice President Southern Services, Inc.
P. O. Box 2625 Birmingham, Alabama 35202 Mr. J. A. Bailey Project Licensing Manager Southern Company Services, Inc.
P. O. Box 2625 Birmingham, Alabama 35202 George F. Trowbridge, Esq.
Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.
Washington, D. C.
20036 Mr - D.'0. Foster Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 o
-w
1 ATTENDANCE LIST NRC Staff Southern Company Services Jane Grant Willard Bowers Joseph Levine Jim Bailey Millard Wohl Charlec McCrary Wayne Meinke Stephen Hill Daniel Muller Robert Samworth Mike Masnik Donald Cleary Sidney Feld Joe Youngblood Argil Toalston Dick Codell
,