ML20039A303
Jump to navigation
Jump to search
| ML20039A303 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 12/10/1981 |
| From: | Manry M GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20039A304 | List: |
| References | |
| PM-81-1024, NUDOCS 8112170084 | |
| Download: ML20039A303 (1) | |
Text
,-
Georgia P:w:r C:mp:ny Post Offica Box 439 Daxley, Georgia 31513 Telephone 912 367-7781 912 537-9444 Georgia Power Edwin 1. Hatch Nuclear Plant December 10, 1981
' - ~
PM-81-1024 h' NI Sfo6 PLANT E.
I. HATCH NRC Monthly Operating Report Ted Cintula 12105 M.M.B.B.
United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2, Docket #50-366 M
tA.,
M. Manry Plant Manager CLC/hh 8112170084 810210-s
~
PDR ADOCK 05000321
/ /
R PDR
/
-