Responds to NRC 811022 Ltr Re Violations Noted in IE Investigation Repts 50-424/81-09 & 50-425/81-09.Corrective Actions:Test Forms Revised & Concrete Placement Pour Logs Are Being Initialed.Full Compliance Achieved on 811101
ML20039A285
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/23/1981
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20039A273 List:
References
GN-149, NUDOCS 8112160454
Download: ML20039A285 (2)


Text

<W O

, ,, e I Georgia Power Company '

Post Offce Box 4545 ' ' - '

Atlanta, Georgia 30302

  • *" "*
  • 4 522 e 3I ova P2 3i Vogtle Project southem Company Services. Inc.

Post Office Box 2625 Dirmingham, Alabama 35202 Telephone 205 870-6011 November 23, 1981 United States Nuclear Regulatory Commission

Reference:

Office of Inspection and Enforcement ID: II:

Region II - Suite 3100 50-424/81-09 101 Marietta Street 50-425/81-09 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly File: X7BG10 Log: GN-149 Gentlemen:

The Georgia Power Company wishes to submit the following information concerning the violation discussed in your inspection reports 50-424/81-09 and 50-425/81-09.

We concur with the finding identified concerning inspectors not being identified on the records for in-process testing of plastic concrete and unconfined compression testing of concrete cylinders. Prior to your inspec-tion, Georgia Power Company thought that the method used to document these inspections was sufficient. Level II or lead inspectors were reviewing the work, verifying that only qualified inspectors were used, and signing the completed packages. The in-process testing Inspectors have since been instructed to place their initials by the results of each test perfonned by them on the Concrete Placement Pour Log. A random follow-up surveillance has assured that this is currently being done.

The Concrete Testing Pour Test Part I form has been revised to allow an initial block for the Inspector performing the test. This form is presently being used.

Full compliance was achieved Novem' o er 1,1981.

Neither the inspection report nor this reply contains any proprietary information and may be placed in the NRC's Public Document Room.

Very truly u ,

~

<  ?.

. O. oster Project General Manager E'112 I G o 7,

" .Mr. J. P. O'Reilly ..

50-424/81-09,50-425/81-09 November 23, 1981 page 2

^

D. O. Foster states that he is Project General Manager of Georgia Power Company's Vogtle Project and is authorized to execute this oath on behalf of Georgia Power Company.and that to the best of his knowledge and -

. belief.the facts set forth in this letter are true.

GPC: .

D. O. Foster if Sworn to and subscribed before me this /.I day of November, 1981.

My Commission Espires March 21,198B xc: U. S. Nuclear Regulatory Commission Attn: Victor J. Stello, Jr., Director Office of Inspection and Enforcement Washington, D. C. 20555 J. H. ililler 0. Batum R. J. Kelly D. O. Foster R. E. Conway H. H. Gregory III G. F. Head E. D. Groover D. E. Dutton L. T. Gucwa R. H. Pinson B. L. Lex C. F. Whitmer C. R. Miles, Jr.

D. L. McCrary H. C. Nix R. A. Thomas R. W. Staffa J. A. Bailey J. L. Vota l