ML20039A228

From kanterella
Jump to navigation Jump to search
Reaffirms Status of Torus Mods,Per 810113 Order,In Response to Telcon Request.Remaining Mods Will Be Completed Prior to Startup for Cycle X Operation,Per Util 810223 & 1118 Ltrs
ML20039A228
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/10/1981
From: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
EY-81-173, NUDOCS 8112160389
Download: ML20039A228 (1)


Text

.

VERMONTYAN KEE NUCLEAR POWER CORPORATION SEVENTY SEVEN GROVE STREET RUTLAND, VERMONT 05701 2.C.2.1 Eety 10.

FVY 81-173 ENGINEERING OFFICE 1671 WORCESTER ROAD FR AMING H AM, M ASSACH USETTS 017o1 TELEPHONE 617 872 8100 December 10, 1981 tD A

8

[q United States Nuclear Regulatory Commission h

g Washington, D. C.

20555 g

y, a

At ten tion :

Office of Nuclear Reactor Regulation

[Y M Mr. Thomas A. Ippolito, Chief Operating Reactor Branch #2

?

Division of Licensing 8

b 6g

=

References:

(a) License No. DPR-28 (Docket No. 50-271)

(b) Letter, VYNPC to USNRC, FVY 81-7, dated January 9,1981 (c) Letter, USNRC to VYNPC, dated January 13, 1981 (d) Letter, VYNPC to USNRC, FVY 81-31, dated February 23, 1981 (e) Letter, VYNPC to USNRC, FVY 81-163, dated November 18, 1981 (f) Letter, USNRC to VYNPC, dated November 25, 1981

Subject:

Vermont Yankee Torus Modifications

Dear Sir:

In recent telephone conversations with your staff, Vermont Yanket has been requested to reaffirm the current status of the torus modifications required by the Order for Modification of License forwarded by Reference (c).

As previously stated in References (b), (d), and (e), and confirmed by the NRC in Reference (f), all of the major torus modifications required by Reference (c) have been completed. Any remaining required modifications such as resupport of piping attached to the torus will be completed as necessary prior to startup for Vermont Yankee Cycle X operation as previously proposed in References (d) and (e).

We trus t this information adequately responds to your staff's request.

Please contact us if additional clarifica tion is desired.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION AfJA fool R. L. Smith 3

Licensing Engineer

[

llD RLS: dad i

B91216oggc f