NUCLEAR R TOR 9 N EION g
a REGION il 8
101 MARIETTA ST., N.W., SUITE 3100 o,
ATLAN TA, GEORGIA 30303 s
4ttk*
DEC 2 1881 Report No. 70-1113/81-16 Docket No. 70-1113 License No. SNM-1097 Safeguards Group No. III Licensee: General Electric Company P. O. Box 780 Wilmington, NC 28402 Date of Inspection:/ November 2-6, 1981 Type of Inspectioql: Unannounced Material Control and Accountability f'
f e
Inspectors-N/ ^ g/
// 25 8/
G. K.pddguditor 05te Signed A U ~f afs/r/
J p L, kford, Auditor Date Signed Id h W R Q ct w.e t 2_./2_ /R f Approved by:~E. J. McAlpine, Chief, Material Control and Date Signed Accountability Section Technical Inspection Branch Division of Engineering and Technical Inspection Inspection Summary Areas Inspected:
Internal Controls; Records and Reports.
The inspection involved 60 inspector hours on site by two NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the two areas examined during the inspection.
Cop 9
C Dies Page
,. l.. a.q ;l.sT. L 1 ne t t o y, m.m