ML20039A151

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 70-1113/81-16 on 811102-06.No Noncompliance Noted.Major Areas Inspected:Internal Controls & Records & Repts.Details Withheld (Ref 10CFR2.790)
ML20039A151
Person / Time
Site: 07001113
Issue date: 12/02/1981
From: Lankford J, Mcalpine E, Todd E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20039A139 List:
References
70-1113-81-16, NUDOCS 8112160278
Download: ML20039A151 (1)


Text

__

@lTTE0 HEREVilTli

/* ***oq CONTAl',S o

P t

NUCLEAR R TOR 9 N EION g

a REGION il 8

101 MARIETTA ST., N.W., SUITE 3100 o,

ATLAN TA, GEORGIA 30303 s

4ttk*

DEC 2 1881 Report No. 70-1113/81-16 Docket No. 70-1113 License No. SNM-1097 Safeguards Group No. III Licensee: General Electric Company P. O. Box 780 Wilmington, NC 28402 Date of Inspection:/ November 2-6, 1981 Type of Inspectioql: Unannounced Material Control and Accountability f'

f e

Inspectors-N/ ^ g/

// 25 8/

G. K.pddguditor 05te Signed A U ~f afs/r/

J p L, kford, Auditor Date Signed Id h W R Q ct w.e t 2_./2_ /R f Approved by:~E. J. McAlpine, Chief, Material Control and Date Signed Accountability Section Technical Inspection Branch Division of Engineering and Technical Inspection Inspection Summary Areas Inspected:

Internal Controls; Records and Reports.

The inspection involved 60 inspector hours on site by two NRC inspectors and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the two areas examined during the inspection.

Cop 9

C Dies Page

,. l.. a.q ;l.sT. L 1 ne t t o y, m.m

' NO7Q1 cf {p dQ ANSM TTED HERP.'llTH 9NTA ' S 2. 50;.d) SAFECUARDS lNfcpgzqyg 8112160278 811202 DR ADOCK 07001

- - - - - -