ML20038C688
| ML20038C688 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 12/08/1981 |
| From: | Tauber H DETROIT EDISON CO. |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| References | |
| EF2-55-609, NUDOCS 8112140040 | |
| Download: ML20038C688 (2) | |
Text
_ _,
H:rry Truber x.:,;w.,
Detroit ECiSOn ATME**
December 8, 1981 EF2 - 55,609 Mr. B. J. Youngblood, Clief lt
(,
Licensing Branch No. 1 ff [rn 23,3 [h[( Ih
-g Division of Licensing Office of Nuclear Reactor Regulation 5 q3 t'*y
!?
2,$f"CQggRS U. S. Nuclear Regulatory Commission' 2
ff Washington, D. C. 20555 7-kNap
' 's 7, $s,
A
~
Nf.,:
Dear Mr. Youngblood:
References:
1.
Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341 2.
Letter from H. Tauber to B. Youngblood, October 30, 1981, EF2-55,359
Subject:
Response to Requests for Additional Information in Fermi 2 Operating License Application Enclosed herewith are five (5) copies of Amendment 3 to the Enrico Fermi 2 " Physical Security Plan".
This amend-ment incorporates the responses contained in the referenced letter.
In accordance with the Commission's Regulations, speci-fically Section 2 790 of 10CFR Part 2 and Section 9 5 of 10CFR Part 9, The Detroit Edison Company hereby requests that the attached copies of Amendment 3 to the " Physical Security Plan" 5e treated as proprietary and be withheld from public disclosure as specified in the accompanying affidavit.
Sincerely, f Oc) /
--- -/
3
($4Q at- 'N c
/(
cc:
D.
E.
Howell L. L. Kintner B.
Little 8112140040g0b 1
POR ADOCK 0 PDR F
AFFIDAVIT IN SUPPORT OF APPLICATION TO WITHHOLD MATERIALS FROM PUBLIC DISCLOSURE HARRY TAUBER, being duly sworn, says:
1.
I am Vice President - Engineering and Construction for The Detroit Edison Company.
My office is located at 2000 Second Avenue, Detroit, Michigan 48226.
I have the responsibility for the review of the material contained in the " Physical Security Plan" for the Enrico Fermi Atomic Power Plant, and I am authorized to apply for withholding of this document from the public records; 2.
The " Physical Security Plan" consists of confidential commercial information relating to the safe operation and protection of the Fermi 2 Power Plant, and its contents have not been made available to the public for inspection; 3
To the best of my knowledge and belief, the material contained within the " Physical Security Plan" is of a nature customarily exempted from public disclosure and is not available in public sources; 4.
The protection of the general public and of the Company from theft, sabotage or destruction of valuable Company property requires that the material con-tained within the " Physical Security Plan" be withheld from public disclosure.
/ I
$ t hl A c;.-p/Jtf A
Harry Taubsr Vice President Engineering and Construction The Detroit Edison Company Subscribed and sworn to before 8th day o Decemberg 1981 mepfh Yhb r5/~
n-~-/
y/ Bqrbara Ann Purof Notary Public, Wayne County, Michigan, Acting in Oakland Co. Michigan My Commission expires:
10-28-84