Responds to Re Issue of Embrittlement of Nuclear Reactor Pressure Vessels.Immediate Regulatory Action Is Not Required.Completion of Rept Analysis & Subsequent Decision on Required Corrective Actions Scheduled for Summer 1982
ML20038C419
Person / Time
Site: Maine Yankee
Issue date: 11/24/1981
From: Palladino N
NRC COMMISSION (OCM)
To: Brennan J
MAINE, STATE OF
Shared Package
ML20038C420 List:
References
NUDOCS 8112110012
Download: ML20038C419 (4)


Text

..

t' k/h DISTRIBUTION

-4 W//

o a

' WJDircks s

PDR v

KCornell SECY

'f l LI P )

'.9 l

d[

9 TRehm DST r/f l

[

[

7 HDenton p'

NOV37 103le

_iG Ecase u.auma w n 7 RDeYoung srmwi 77 Minogue O

d)

WKerr, SP

/

M/

November 24, 1981 SHanauer g

DEisenhut RMattson RVollmer Ncvak The Honorable Joseph E. Brennan BSnyder Governor of Maine fD -10949 Augusta, Maine 04333

Dear Governor Brennan:

SCavanaugh I am writing in reply to your letter of October 5,1981, regarding the issue of embrittlement of nuclear reactor pressure vessels.

I want to assure you that NRC regards this as an important safety issue and that we are devoting a good deal of attention to the problem.

Our current judgment is that inmediate regulatory 'ction is not required and that we have time to evaluate carefully the condition of the pressure vessel and the proposed solution to the problem before any regulatory action is needed.

In addition, the Maine Yankee design provides the ability to heat the ECCS water prior to injection and the utility has comitted to a " low leakage" core configuration at its next reload. These items can significantly reduce the prob-ability of a vessel rupture during a thermal shock.

Our schedule is to complete cur analyses of Maine Yankee reports on the matter and reach a decision on any required corrective actions by next sumer.

If our ongoing review indicates that more urgent action is needed, we will not hesitate to take appropriate steps tc ensure the safety of Maine Yankee.

In closing, I would like to assure you that we place the highest oriority on assuring that operating facilities achieve and maintain adequate levels of protection of public health and safety Sincerely, Origins 1 signed by Nunzio J. Palladino h2110012811124 Nunzio J. Palladino 05000309 H

PDR Cleared with all Cmrs' Offices by SECY C/R.

Cmr. Ahearne did not concur in the last paragraph.

He telt NRC's highest priority was on licensing rather than on assuring that operating facilities achieve and maintain adequate levels of protection of public health and safety.

Re f. -CR-81-153 Originatii.g Office:

ED0/NRR

/]

orrc >

SECY OCM [l 0CM

OCMJ, g.[g g

s

"' " 4 T C.omb,sgf,6, $).c.hyggM.,,d

.M,lejff,b, p,J.fedfgh/fk

'N

.l.1./.191.81.,

jf.[,,;,,0..h. p/,h,j,M, //[,

.h/,,,/f[,

p, ye row m no40mcn 0;"

OFFICIAL RECORD COPY "o ' ~ - 3 "

v-m.

g-

/

l

/

i

/

/

The Honorable oseph E. Brennan Governor of Malpe

/

4 Augusta, Maine 04333

/

Dear Governor Brennan:

f I am writing in rep to your lettei of October 5,1931, regarding the issue of embrittlemenh I want to assure you that NRC reg,of nuclear reactor pressure vessels.

j ards this at an important safety issue and that we are devoting a good deal of at,tention to the problem.

Our current judgment is th t, the chance of a severe overcooling accident that would threaten the integri,ty of the pressure vessel of fiaine Yankee is sufficiently remote that weihave time to evaluate carefully the condition of the pressure vessel and the proposed solutions to the problen before further regulato action is needed.

Our schedule is to complete /our analyses of Maine Yankee reports on the matter and reach a decision on any required corrective actions by next sumer.

If our ongoing rfview indicates that rore urgent action is needed, we will not hesitate to take appropriate steps to ensure the safety of Maine Yankee. /

\\

/

\\

In closing, I would like to assure you that naintaining adequate safety of operating reactors is HRC's highest priority activity, and we will s

not let the burden of licensing new reactors otract from that priority.

If I can be of further help, please do not hesitate to contact me.

/

\\

[

Sincerely,

\\

\\

\\

Nunzio J. Palladino

\\

Chai nnan s

Distribution $

\\

Chainnan Pall dino OPE VStello RWilmer TNovak Commissioner Gilinsky OGC RMinogue BSriyder DST cf Commissioner Bradford WDi rcks WKerr PChe'ck BGabriel (#10949)

Commissioner Ahearne HDenton TEMurley PPAS PDR Commissioner Roberts KCornell DEisenhut MBridgers (ED0 # 10949)

SECY 81-2161 TRehm RMa ttson SQagnaugh " cQu t.,

ED0,[,,

OCM,,

ornce>

,R,pRRt N

Dh N

NR

$URNAM Q

..,T 9

..Tg.y.a.k.....

.h

..H..

..Wi.rcks.....

.NJealladino.

...l.91.151

..I..).f./.8,1,,,,,,,1,0/((,/81,

,,10/)f/81,

,,10/l,,}/81,,

,,10/,,,,,/,81, oars >

Nac ronu m oow Nncu cm OFFICIAL RECORD COPY usaro.ieei-w seo 1

J

-.w.,.n

..x,_.

..s,

>,. ~

.~-,-..,~-e a

r CONTROL NO,t 0 9 4 9 FROM:

ACTION CONTROL DATES COMPL DEADLINE 10-29-81

-gov. Joseph E. Brennan ACKNOWLEDG MENT DATE DOCUMENT Maine

'NTERiu aEP'v 1 0- -81 TO:

PREPARE FOR SIGNATURE FINAL REPLQf ry, O [ 4 CHAIRMAN Chairman Palladino FILE LOCATION g /

O EXECUTIVE DIRECTOR

/

/

OTHER:

DESCRIPTION Q LETTER OMEMO C REPORT O OTHER SPECI AL INSTRUCTIONS OR REMARKS Expresses Concern re excessively PRIORITY brittle containment vessels CLASSIFIED DATA I

OOCUMENT/ COPY NO.

CLA$slFIC ATIONl NUMBER OF PAGES CATEGORY EUMdO

=OsTAt REGisTRv NO.

O Nsi o Ro a fro ASSIGNED TO:

DATE INFORMATION ROUTING LEG AL REVIEW D FINAL 0 CoPv M - - r* C D i n _x_g gjrCks M $$g$$

AsslGNED TO:

DATE l NO LEGAL OBJECTIONS 6 Murley.

10/9/8 Cornell Shapar 3.

Mattson

/. cnect NOTIFY O

Rehm Kerr,SP 4

  • iurlev Ex T.

Stello 1.

PPAS T.

'ollmer COMMENTS NOTIFY:

2.

Eisen ggAE NOTiFICATI J t

Minogue ECOMMENDED:

O vEs O NO 7

l

.6RCFgag,232 ExECuTlyE o, REC 10R,OR OgEnA1,0NS.

,,yo7,,yoy,7y,,,,,,

PRINCIPAL CORRESPONDENCE CONTROL

[

81-2161 N1 Logging Date NRC SECRETARIAT TO:

Commissioner Date j

)('

E mec. DirdOper.

Gen. Counsel l

Cong Liaison Q soiicitor O Public Affairs O secretary O ins ector & Auditor O por.cv E,,.io. tion

',2 C.

Gov H Joseph Brennan inc,;,,.

5 tate of Maine p,om.

Palladino IU/b/61 yo:

o,,,

.s

~

sub ect.

concerned that the containment vessels i

in nuc nower olants may become brittle whereby

^

the nneration of the Diant may become unsafe 7

h Prepare reply for signature of:

XG chairm,,

Date due Com: Oct 29 O commissioner I

E 00. GC. Ct SOL PA. SECY, I A. PE signature block omitted

^

turn original of incoming with response

[I*

t r'

'I

).

}['u For direct reply

  • For appropriate action For uiformation Cpys to: RF g,,,,

For the Commission:

' Send three (3) co ies of reply to Secy Correspondence and Records Branch Date. /4-Rec'd Off. EDO [/

  • 3._

I a.

A TION SLIP ece

  • ~ ~

v

..i.t*.. *..., c.n..,4 s

4 k

P e~-

~

,c.+ - - -, -,.,, -. - -,,-,,

,---y

,,,,.-,