Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20151R5611986-01-30030 January 1986 Summarizes 851216 Mgt Meeting at Oak Ridge Operations Ofc to Review & Inspect Redress & Reclamation of Crbr Site.Drawings Reviewed,Discussions Held & Tour of Site Performed.Site Restoration Concluded to Be as Described in Plans & Specs ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20128R0001985-06-0606 June 1985 Partial Response to FOIA Request for Records Re Desirability of Voluntary or Required Redress of Nuclear Plant Sites Where Work Undertaken But Const No Longer Contemplated. Forwards Documents Listed in App a ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20140C6121984-06-18018 June 1984 Advises That Time for Commission to Review ALAB-761 Expired. Commission Declined Review.Decision Became Final Agency Action on 840611.Served on 840618 ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20128R0161984-02-29029 February 1984 Expresses Thanks for 840222 Review of Site Redress Planning. Concurs W/Conceptual Approach & 1-yr Period for Development of Final Site Redress Plan & Investigation of Potential Use of Site.Ml Lacy Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 1986-03-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 ML20073S2761983-05-0505 May 1983 Forwards Revised Responses to SER Item 6 Re Qa,Including Info to Complete Identification of safety-related Structures,Sys & Components Controlled by Crbr QA Program for PSAR.Marked-up Tech Specs Encl ML20073Q3491983-04-28028 April 1983 Forwards Revised Response to SER Item 6, Qa. Response Provides Addl Info Re Identification of safety-related Structures,Sys & Components Controlled by QA Program ML20069L1801983-04-27027 April 1983 Informs That Evaluation of Seismic Adequacy of Primary Heat Transport Sys Branch Line & Consequences of Line Failure Being Conducted,In Response to ACRS 830419 Request.Results Will Be Forwarded by 830517 ML20073R2221983-04-27027 April 1983 Requests to Make Limited Appearance Statement at 830718 CP Hearings Re Regional Socioeconomic Impacts ML20071G2761983-04-18018 April 1983 Recommends That Commission Retain Technical Cadre of Experts to Review Crbr & Overall DOE Breeder Program ML20073K3441983-04-18018 April 1983 Forwards Static Tests of 1/20-Scale Models of Crbr Head in Support on LMFBR Safety Program 1986-03-13
[Table view] Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20073R2221983-04-27027 April 1983 Requests to Make Limited Appearance Statement at 830718 CP Hearings Re Regional Socioeconomic Impacts ML20069P6131982-11-18018 November 1982 Offers No Comments on Suppl 1 to Fes for Facility ML20065T9791982-11-0101 November 1982 Forwards Author Testimony on Contentions 4 & 6(b)(4) & Cj Johnson Testimony Re NRC Analysis of Environ (Health) Impacts of Plant & Fuel Cycle ML20063P3021982-10-0808 October 1982 Confirms 821007 Discussion,Listing Addl NRC Personnel to Be Available for Deposition Re Contentions 5(a) & 7(b) on 821013 ML20063P0891982-10-0707 October 1982 Confirms 821005-06 Discussions,Listing NRC Personnel to Be Deposed on Various Contentions on 821012-13 ML20023A9971982-09-28028 September 1982 Comments on 1982 Draft Suppl to 1977 Fes for Crbr.Suppl Unacceptable.Fes Suppl Fails to Address Huge Costs of Decommissioning.Use of Alternative Energy Sources & Conservation Advocated ML20205L2011982-09-0808 September 1982 Comments on Draft Supplemental Fes on Crbr.Analysis of Impact on Humans,Plants & Animals Made W/O Considering Cumulative Effects of Background Radiation.Addl Documentation Encl ML20065K7201982-09-0808 September 1982 Comments on Draft Suppl to Fes Re Decommissioning of Crbr ML20063D6911982-09-0101 September 1982 FOIA Request for Rept to EPA, Pu & Human Tissues Re Smoking,Age,Residence Near Rocky Flats & Eastern Co ML20063E4081982-08-17017 August 1982 Comments on Draft Suppl to Fes Re Const & Operation of Facility.Nrc Should Recommend Project Be Canceled Due to Need & Cost Considerations ML20062K5541982-08-11011 August 1982 Requests to Make Limited Appearance Statement at 820823 Meeting in Oak Ridge,Tn ML20058J6421982-08-0909 August 1982 Requests to Make Limited Appearance Statement at 820823 Hearing ML20062G2501982-08-0909 August 1982 Package of Two Comments Opposing Crbr ML20062F8551982-08-0707 August 1982 Supports Completion of Crbr ML20055C0281982-08-0606 August 1982 Advises of Review of Draft Suppl to Fes for Crbr.No Comments Offered at This Time ML20058J6491982-08-0606 August 1982 Requests to Make Limited Appearance Statement at 820823 Hearing ML20062C8251982-08-0404 August 1982 Opines That Rationale Expressed in Applicant post-hearing Ltr Unpersuasive to Grant Exemption Request.Applicants Confuse Total Informational Benefits to Ldp W/Marginal Benefits of 6-month Shift in Schedule ML20062C8471982-08-0404 August 1982 Demands Summary Denial of Applicant Exemption Request or Alternatively,Requests Adjudicatory Hearing Be Ruled Upon Before Decision on Applicant Request Made ML20058J6401982-08-0303 August 1982 Requests to Make Limited Appearance Statement at 820823 Hearing ML20062C7651982-08-0303 August 1982 Opines That Small Increase in Crbr Efficiency That Might Result from Granting Exemption Request Does Not Justify Extraordinary Relief from NRC Licensing Process ML20062C5721982-08-0202 August 1982 Package of 10 Comments Supporting Accelerated Site Preparation for Crbr ML20062G2221982-08-0202 August 1982 Comments on Proposed Accelerated Site Preparation for Crbr. Supports Proposal ML20062G1901982-07-30030 July 1982 Comments on Proposed Accelerated Site Preparation for Crbr. Supports Proposal ML20071K8661982-07-28028 July 1982 Advises That Pleading That Was to Be Filed on 820728 Will Be Filed on 820729 ML20058G4171982-07-28028 July 1982 Requests to Make Written Limited Appearance Statement on Behalf of Environ Law Project ML20062B3791982-07-27027 July 1982 Urges Issuance of Suppl to Fes for Crbr ML20063H6711982-07-26026 July 1982 Package of 34 Ltrs Supporting Acceleration of Site Preparation for Crbr ML20058B9841982-07-22022 July 1982 Urges Denial of Applicant Request for Exemption from 10CFR50.12 to Conduct Site Preparation Activities.Request Should Be Peremptorily Denied Due to Administrative Res Judicata.Certificate of Svc Encl ML20070R4681982-07-20020 July 1982 Urges Approval of DOE Request to Begin Crbr Site Preparation ML20070R4751982-07-20020 July 1982 Urges Approval of DOE Request to Begin Crbr Site Preparation ML20058F0721982-07-19019 July 1982 Supports re-evaluation of Facility Des ML20055B6941982-07-15015 July 1982 Urges Issuance of Draft Suppl to 1977 Crbr Fes ML20054M7591982-07-12012 July 1982 Advises That Reply to Applicant 820701 Response to NRDC & Sierra Club 820611 Petition to Delineate Scope of LWA Proceeding Will Be Filed as Soon as Possible ML20058F7531982-07-0202 July 1982 Urges NRC Issue Draft Suppl to 1977 Fes ML20062F0801982-07-0202 July 1982 Criticizes Nuclear Waste,Crbr & Nuclear Weapons.Draft Suppl to Facility Fes Should Be Issued for Comment ML20062A6941982-07-0101 July 1982 Urges 1977 Fes Be Updated ML20054L5131982-07-0101 July 1982 Exhorts NRC to Suppl 1977 Fes.Myriad Changes & New Data Compel Need for Suppl.If Fes Is Not Updated,Nrdc & Sierra Club Will Sue Nrc.Minor Delay Will Obviate time-consuming Litigation ML20062A7101982-06-24024 June 1982 Opines That 1977 Fes Should Be Updated ML20058F4301982-06-23023 June 1982 Requests NRC Issue Draft Suppl to Fes for Public Comments ML20062A1241982-06-21021 June 1982 Urges Issuance of Suppl to 1977 Fes Incorporating New Info Re Plant Design & Recent Regulations ML20058B0991982-06-18018 June 1982 Urges 1977 Fes Be Updated ML20055B7031982-06-18018 June 1982 Insists Upon Issuance of Draft Suppl to 1977 Crbr Fes Due to Changes to Both Reactor Vessel & Fuel Core Design.Licensing Under 1977 Stds Irresponsible & Malicious ML20062B3171982-06-18018 June 1982 Opposes Further Development of Crbr as Needless Extravagance in Face of Declining Demand for Electric Power. Supplemental Fes Should Be Issued for Public Comment ML20058A9111982-06-17017 June 1982 Requests NRC Issue Draft Suppl to Facility Fes Due to Significant New Info & Developments Since 1977 ML20054G0291982-06-17017 June 1982 FOIA Request for Five Categories of Documents Re Design of HX &/Or Steam Generators for Facility ML20062A5861982-06-14014 June 1982 Urges NRC to Issue Revised Fes on Crbr for Public Comment 1986-03-13
[Table view] |
Text
.
g- - . . . ,
,Pb 5 b. 5. d fi b rid c, k. D ,, D b ,,,
102 Oakmont Drive Kingsport, TN 37653 "M' (615) 239-5828 Dec. 3,1931
'81 DEC -8 PS:22 LAL.
Fir. Ihmsio Palladino, mairmn iECRETARY U. S. Nuclear Regulatory Comission L '
Viashington, D.C. " dhCYi
~
20555
Dear 16. mdino:
I strongly oppose the construction of the Clinch River Breeder Reactor near Oak Ridge, TN. I ask that you refuse permission for av construction on this project and that you issue no license.
I wrote to Senator Howard Baker on Oct. 13, 1981, insisting that he kill l the Breeder Project. Just as he has done in other matters which I have written to him, when he voted, he cocoletely ignored g wishes. The l~
enclosed copy of g letter to him gives y position on this matter.
Enclosed are copies of g recent letters which were published in the :
following newspapers: ?
Kingsport Times-News, 701 Lynn Garden Drive, Kingsoort, TN yf j Kill the breeder 15-81. 37662 % 6 ((,{r ,
Earth poisoning 26-81 9'/
gEco A (d Erwin nuke 12-81. _
l Valley News Dispatch, hth Ave. & Wood St., Tarentum, PA 1508h -h Md ,
Kill reactor 26-81. A i Poisoned planet 7-81. ND V l I wrote to 12r. Joseph Hendrie, mairmn, N20, on Apr. 27,1981, opposf
\ h l the restart of Unit I at Three 1411e Island. I received a letter dated Aug. 25,1981, from Herbert N. Berkon, NRC, regarding this matter. On Sept. 8,1981, I received fron NRC, Partial Initial Decision Procedural a Background and !!anagement Issues on Restart WI, Unit I. I re ain strongly '
opposed to the restart of T!dI.
I received a postcard from NRC Docketing and Service Branch, Office of the Secreta:y, dated Nov. 9,1981, acknowledging receipt of g cor.municati.on regarding PR-2 (h6 F2 h7799).
Sincerely,
'llt a o , pw pCh LSc n/r Idrs. Suzanne Sherbondy l
Enclosures ,
cc:
Editor, Kingsport Times-News I Editor, Valley News Dispatch )
.p6 i si f, i 8112100194 811203~ l
{.
PDR ADOCK 05000537 .
H PDR t
LC:;.1. ;. :.2:?,
FROD, & U.TiL FACM. : .).Y.2. . . . m
.OLKETED
'RtG C 102 Oakmont Drive Kingsport, TN 3766f,1 DEC -8 PS,27 (615) 239-5328 (N2-Oct. 13, 1981 . _ e SECRETARY
'6, .riHN3 & SERVICE -
6 RANCH Senator Howard H. Baker, Jr, U. S. Senate Office Building Ylashington, DC 20510
Dear Senator Baker:
As a very concerned citizen, I an again writing to you to insist that you Idll the Clinch River Breeder Reactor Project.
I know that this has been one of your pet projects. Nalph Nader recently issued a statement on the nens that you are responsible for keeping this dangerous project alive.
If you will check your files, you will note that I have been writing numerous letters to you, all pertaining to the quality of our environnant and civil rights. I have been investigating the entire nuclear industry since 1977.
The Breeder till be even more dangerous than today's reactors.
The cost overruns ar.6 a disgrace. Three-fourths of the prime contracts are open ended - no firmly set costs or completion dates.
As a cttizen and taxpayer, I insist that this project be killed it: mediately.
Sincerely,
&Mw f don .4 Urs. Suzanne Sherboncbr i
i i
l 1
l i
l 1I
y - ' ~
L. m -
,-.-.x
~--* ~3" "3' ~ " ' " ~.,. , .....
-..2- -
= u .-- .'
- .gtW ,. ...
- . a : A. -
L=i w= r:g.gg7.,g.=:r;g ;3;;;;;.7&;;g-y.....=_w:%a.:. .. .
f .a ~"u ==== =.....n.:nn:v =w:.=~=ac'*-- : ~^~~=:;W;*;;i1Gir.",.ai:GE",us.... ...:v==*=m~~==~~:='=[5:.T.la ww-'"'=-******"'""**"" ..... ~2.Mw *"~ _. . . . . . .=. ,*=" *% " a =_._r ._. z z....
.:. :..q;;;;;;;;;;;;;;;;
c .2=
?~E% YM=" =NW V=........ **""*""""""":""*"", ..N.~.Y.
""'EA 55' " h. . ". . . . . . w . ... . . . . . . . - ."'-"'"*"*;;Giiii;WWis -"- ~ w ^"""
p ~= '- -.' ....:.--.: .,= .. -ug"==?:* .- "v
"- .;;;. =" "Guda'A G
=.s 2.w: .;zw f= zu.x;;;;;;=w-.-.~
I ' -* . ..
3:;:;_
?""* [;;;;ci,;;;gi;C :,s'*J.;~uulef (A
mm
~ ~~
- g[ym;;;;;wz
- :., .,=":i:
irmaseon vma " *=" s, ,s re *
wam anua=
a 8A Kingsport Times-News / Thursday, October 15,1981 .
};~f: h'. --
r-- '" .. -
d.; a Earth poisoning Kill the breeder
,.=
You are to be commended for your l
E~C :.==;
gu 2 coverage on Oct. 11,1981, of the pol- The following letter was sent to soning of the Niagara River and Ni- } Senator Howard H. Baker Jr. ,..
", j;;;;;;n_32.;.;;;
- m..a agara Falls by the chemical industry.
=I
"~"""""""y'
Dear Senator Bal.er:
=23 The entire Planet Earth is beinE As a very concerned citizen, I am " ~
poisoned by the chemical and nuclear '
smi " industries. again writing to you to insist that you
.=Q 6. . . .. - .
I hope people will be alerted to i} kill the Clinch River Bueder Reactor Project. =ca g.w==5 take action to strengthen the Clean ' .
I know that this his been one of Air and Clean Water Acts rather $h[...
429=4 =7
='
than to permit them to be weakened by the Reagan Administration.
} your pet projects. R: ph Nader re-t cently issued a statement on the news E,._.2 ,
Es2 that you are responsible for keeping .~=-=:.
I enclose copies of the following:
" "Fj My letter to 60 Minutes- 6-25-78. this dangerous project alive, f-~ . . m "de.i-jj Your form reply to me - received - If you will shock your files, you i = ""' will note that I have been writing nu- 2.cma 22-
==~
7-25-78. ,_ . .u
= " " Kingsport Times-News, Past Expe- merous letters to you, all pertaining p riences Cause Her Concern About to the quality of our environment G ;c .,...
- ==
the Future - 7 23-78. and civil rights. I have been investi-
$="
gating the entire nuclea. Industry,
~
Kingsport Times-News, Commen-WI . tary, The Nuclear Menance - 3480 since 1977. m.
:.?
~ ~O The Breeder will be even more ~
Kingsport Times. News, Commen-
. . G:. tary, Dignified Protest 28-80. dangerous than today's reactors. The 7E
~ ~ ~ ~ ~ ~ Two letters from U.S. Nuclear Reg- cost overruns are a disgrace. Three- , _.m m.
ulatory Commission 29-80 and 8- fourths of the prime contracts are i ..
"E: open ended - no firmly set costs or
> 25-81.
The enclosed papers represent completion dates. [.
u;?pt. ; only a small portion of my crusade As a citizen and taxpayer, I insist %y. _ _ .
c = '== against pollution of the entire Planet that this project be killed immedl- _ . .
DMT Earth.
stely, 1 . . ._=.s I would like to add my comments . .
on your sports programming on Sun' Mrs. Suzanne Sherbondy O?- ~~*
~ days. I do not watch sports. I object Kingsport u aae_
to sports taking preference over ;
==: y.3,,. -rar.
news coverage and 60 Minutes. * * .,c.
'h F- .
.. y. ma. . .rs.-
Mrs. Suzanne (Noble) Sherbondy
===."
Kingsport h -~" ~
~~
" ~ ~ ~ .g;g. gum. . =:+". a
. ... .y.g.. ___ .
- ..a.g
}_.., "
- ...-n. ._.,
3"*E :"'"::. ...g......~ . ::"g
" ?"- :~7- :'* *': *:**" .' . ?? ,
- .7' .y. ..-"' ':.=:: _ .; .g; .;.;; . :'C: ****. '"2.. .y.,
n2= .nr e =r . . = " =rr "=: "?":!=2ii% r= ..;.L.g.;;m.. nn::: r : = = r r. . - .. -.. . . .".:
- = . . . ====.====::=.==g....,:=====-- . ===;.=;z.:.; . . =z.:.: === =D". :=;g";;;;:
^
. . .. p.u- :;c;5x
_ w.; =. =='.;:-&:: =" =~:;2L .. .*: X:2D""" w ^ N:- 22
= =:::::= = ==".:.:
- . . . . =n m ..g:.;;;;gg.;, _.;:.=r
- == r;;n = .nr=;
- .~:: ===: =" h." ::=' ""~.1~2.21 ;
d;@. n;.m : nu
. .: ==-r :. . ..:..;;;;_ =-.: .u . .; u .:. . _
75
- &=mr rs= ::=%;;;;;;7:~;l.?;: ;;2T - "==Q:= n =%~=""*':5' * 'MMlpL "= ~ ~==:--~.;: ='=*
3.::;;g;
.=:... ...
. - . . ." -. . . . . . ~ . .
- .; .
- uu
- : .-
-l- "*":....
- u. . . .
".7:;.
.=,g= . '::uu.*:.T: . " 'T ::~::. ::"::::;
..; 5 h . . . .
y ,
{ '9e.
..a c . -4 :
- m. iv :, y -' ",
li
- "~
q .65.
- ii '
-tie "I
'i "j M
'I j:l i; h3; " ly!!
i
- i :! i
.: i:: :s :- '.!t ij ;1
- j jii ! !!!
- i .. i ..
, q :
ii :: lin a .
7 a: .! .
N I l p;
!! .ji I. I i! a e ! ;ll:ii -
1
!* j N ff n y
! a .
! fj I gi ..
m !! i Fi n. .ii "
k! I!
"i .. i' ii !! I ti: !! !!a M ;;;
- ! j '!! "ji '!! 9, r.; ijis 1 'j!
- . ii j i ;; i! i;
'i(l i!!
7; '
lj" g' e li ig I! kn "
! ] I!i -
d li .i ij 'li ;
.i p! e a" y i '
.." g a li gi i! ti 3;j 1:{
- i*
!! ji q !!
(i ' i J !! il ij it j j 4
'; iio
- i i ii 4
- i o [r!
+
e i
ji .. p:i: ir ;
,J i! it i i i e
- j. .,
i i s : .. j '
- ei ;i it '!
- i -
i i
- d '
j {(
~!
"-ig. it
' , :q 14 l i.! ni * - i y :q ,; ,.i I
ii lj' 6
! .i j]
.is i;!
}l i! I4 !e!i :$ U I I;
! 1 .:. l!!
3 :
1 !! !!
n , .
! E. !! ii i- !i fi a:!!!a c.,, e!)
+ .: :
i - :
.ol 2m. jj: gl 3;
~
!;q [i ti, .
p-e i
., E-n!. j i, 4 d
, -. -- s '
N 1 . l!!kj !!
d [i liyir F :
Monday. October 26, 1981 - Vo!!ey News Dispatch. Serving- the Alle Kiski Volley ,B-9 b
q N(;Iy [ff'
, , , _ . - _ - _ - - ---- ~ v -
~ -
- m;~i y m u m":*n" y TiiW) g:
j
~
~
gig d
i; Kill reador . investigating th'e entire rucleah.in- I: I h !b
~
R 1,.j.
!!! dustry since itrn. .. . ,
i:! i: -
di
. f The Ilreeder will be even more ii ! i!! iii .t Hi
.q i. [;c The follcwing letier was sent to dangerous than today's reactors i ':'j l: f li'si l it ! !
U.S. Sen. Itoward II. Ilaker Jr.: The cost overruns are a &giace i NI r U d !!j f [ij. ;
I i ia :i. As a ver concerned citizen, I am Three-fourths of the prir. e,;ccn-i i l
l '
h again writfog to you to insist that tr cis are open ended - no farnity g j y i n :i il ii .'
you kill the C..ich Iliver 33reeder set costs,or completion dates. . . , ;;j jij
- . .ii Itcactor l'roject. As a c,itizen and taxpayer, I insist Iii y": ;' g,id a :d :i L :; si that this project be killed . im- '
I know thiit this has been one of mediately.
1 '
- si your pet projects. Italph Nader re-
- i Suzanne SherborUy ':. El .! ![Y!'
' . ,! jf cently issued a statement on the -
9 !!) f.h F
+
news that you are responsible for Kingsport, Teun. 5 it U;i ;
i~
keeping this . dangerous project
.. hc3 r!
. ;. .i!
"ii l(i I; i alive. '
r ~ ' . . . !
[;! !
I!i I!!!c .
Ep g .b i u a ,
y ji
" ' i' u ..
$ ' r; .. ii .i.cIn!'{T If you will check your files you i . ijj. . , sj; ! M
- !j
~
Li gi: !:!
"' !jE j; llp
.;; ij will note that I have been wr,iting iiii p! hj ..
" ! .,i; il ,3 !jj ; -!
- numerous letters to you, all per- [ll (l
taining to the uality of our environ-
. E., jj g; (( ,
tq!!!!
!; pt h .
ae i ,, -; 3 i "i ,
ment and civi rights. I have been
- li M -
a i [ii !!! v.I r
- };g y; .
igi a
". .:.{g:
! 0 h[
i;
[-.
0 li@[.
g :
- ii' .! l:
I . g/
M .
i
- i 4
.(-
ii, i : : e ta
- igi i i : a :t -
ji
!h '
h '
Ih ill ill ii. i!! il ril}
j!M i1 i'
., 4 k:: .: .i f i i .
y h iai lj [ !
i li g ! .
! j
, i .-
6 a e a n g e r , :
i Illo i
9' :
[
J
- t:i I:i 6i r
'i !l si f j p. -
i!"'! . .
i Uj! : i 5 t - :
P"1 i;
- j
- l !
I I'.
l:5 s
l li !EI!
jii:
.hi i }kit
[3:
s ii )
p m ?j e. -g!
t .
- l ii il i:1 ; i; i; ! r i li l! li t 8 "i !! .
't i ill ! ill j
" p i !!! s it I
- .): i
- J
,. si i i
i'i :)
! ! .: !! li t
!! f rf j;. !n h '; li
)i li I
[ :i !! i l'! t e !! t ; ::
j d U
!! .!! li! il -
$ ;i! E :
f- i !
ti m a! io ofi b d d Ii I
. 2i i !! a ,y i ii (ifE:
=
i n lo .
4 .
qO "
i gr
!!jQ
- . #! ill } ;I i 0 *
!!I t hl!! .l s! h r h.s!g!s.
- i. i:i in !
- i 3
i E:: cim .
- - a ti i ra (n! ! j p; hi; l . . .
i' :
i: :-
l f g H!! g gi 1: F di I.
i -
p:
i j!. t. . 6 il r h !!
.nh
-r !!!
!! r
.. r
- O si 0 !!! '
u _ ll ::
ii .i iiii . .
+ i' .
if!O E -: he .
m m - -
0N a SlM " n - 6 0'*L' - -
- m. .
m Y,j y* '
7l1 qf 7
ii j j.h i j li
.m.
.g j i$
IU i
} ... .. l ij !
?
in i!!
ll
.i ;; 9 'l y i; !
d jiUUdid! d(j ik l l 0 M .
.i l i mb3 I! U ; S$ ;i if. . is .S LI 4 2. d ! 4 '
i i
+ : M U it h F i! !
i U l
B. i-.l l
,-- g g
" LbttbEb ' . ' g.rs - Soturds, Novernber 7. N ',4,y News Dispatch, serving the Allo-Kiski Valloy G n t the amount of brainwashing that -
3))pml
! !. bonlethinO wronO? goes on. To them I would only r,ay, q
Ig y. . on 1
- i
- "'"$ngs o, ong dint [; We believe other readers like Poisoned p) lanet !
b[i li i ' that Simon became significant after them. All will be considered ,
i:
N !' he retired to the ranch, for publication under the "Let- . The following letfer was sent to to the editor on why it is important '
'Ulii
~
ii .
Frank Anderson recently wrote in ters to the Editor" column. CBS'"c0 Afinutes":' to read the newspaper. I hope you p!! fj ,g' his column, "Why Thornburgh Keep them to 25d words or You are to be commended for will be able to print their letters: . , . f j!
doesn't get criticized in the media." Afy name is Scott Ballina. I am m t if After 30 years in the media, An-derson should know that the media .
fewer as possible. so we The can print editorsas w man [ , Ing yourofOct.11 the Niagara coverage Riverof and ti,ie poison- ' S.E.A.L. and we are studying Niagara Falls by the chemical in - lthe newspaper. Ilearned a lot about Tif lhlabo select letters for use on the ' the newspaper. I am 10 years old. I
[j E:
follows the Republican lith com- basis of their merit on a sub- b, du:try.
mandment. They also cater to the The entire planet. Earth is being think it's important that people read , Ei M ject of current interest. Si n poisoned by the chemical and nucle- the newspaper. Because then they'!!
chamber of commerce and their ad-them, please. Letters will 1e ar industries, know what's going on around the f J i
vertisers.
On radio and television, it's the printed with signatures. I hope people will be alerted to world, in their state and in their city .'
ii . same story. The presidential elec- Please include your ad. take action to strengthen the Clean and town. - Scott Baltias of Arnold. l {.i E
~" : tion of 1W2 was a good example. - dress and phone number for Air and Clean Water acts rather Afy naine is Bryan Froud. I am I: e li
- v. :
Richard Nixon refused to cam- verification. Send your letter than to permit them to be weakened Icarning about the newspaper in
[d
" Ob' by the Reagan administ ation. S.E.A.L., which means Seminar in ~ . [ W' ii paign. Despite the revelatien of Wa- to: Editor, Valley News Dis-
- I w uld like to add my comments Elementary Advanced Learning. I ' g ; ..
tergate, the media gave him a free patch,210 Fourth Ave.,Taren .
- ! ride. George AlcGovern called Nix-tum' Pa.' 15084-n y ur sports programmmg on Sundays. I do nct watch sports. I am nine now. It is important to read the newspaper because you find out M
tI la on "the most ccrrupt presid;nt in history," and the media ridiculed object to sports taking preference what is happening. - Bryan Froud !f -
- l i over news coverage and "60 of Arnold.
him. In fact he is still ridiculed.
r d! lC 9
f Such is the po,wer of the media. Reagan was fawned over from M A!!nutes." .
Suzanne Nobic Sherbondy Rose Gavasto S.E.A.L. teacher
@ld
? ,
f ti- The presidential campaign of 1980 . every "well, gosh, gee, golly,. gee .y .
[
,ii was the 1972 campaign in reverse. p whiz" to his beautiful coiffure. Now. J . . ;. . Kingsport Tenn. New Kensingto,n ,n Sj Th.s media laid down a one-year - that he has exposed himself in his . .' cv F 1 l ~
anti-Carter ' propaganda campaign irare news conferences (they will
. ~: il' =ik that will go down as aperformance from october 1979, to October,1930 0 shameful ' becorre in the last two), some very ra ? judging by his :Mor The e Op-Ed op. . inion 'Page. -
a gy i
ji ' chapter in journalistic history. Eve- of his fawners are .beginning to Afy fourth grade class at II.D.
rything Carter did as president was t Berkey is studying the news per. on Page B-7 : 1
- criticized or ridiculed in this period. wNaper a little.Some media people We downgrade' learned about;:the Op-E page ; i: hm ;
3 ;g IIis story was twisted a'id distorted. their influence with the voters and -
today and decided to write a letter e a lh i
- g:
[i8 'j-
.. .i . ,
- t i 1
- i!F je H U: i !!; P '"c =
FN I' p R ta i.'
l'iN.!yll ~l f. p! 'hh {
'. " :i. 9a
' : : ill A;I l! q i
!; li U F !!! "l f " " "?! '
hji ! I: s: ;
E
- t h ?',.@
g [
< d d u
- ! i! ,
4 '
i:
s =e; y a p! )c t i
[
t p t U]! ! .ii l l. !!
i g in g a p iq p p ;j 14 p
g
+ !! . W j
y i
e m
- p i !
t bU rii! !! [j i
" tj b!
g g j7:fii( {:
i5 ii
- 4
! ti A i ii.i )
a' M a u -
s i7 F g g
[ [ {i E.jfl
~ "
+
~
gi y 3 mi :
[ ] .
. p g
_.a-fg f 51 GE*
urrte'E& rampA )l u -
V, P
d
' WMAG f j s.e sd . , ~ ;
ssewn 3
p w.?wD y+p ~yw mye s wv
.= , , .
u j
w+Me* w ww$' n
' J d I SMT! '
i N I. ] ,,
p r is L-
@p.
s.
%!F#t w pr.m @R,/'
g
/ ma -
n Letters tothe Editor WM+%a I call your attention to the suit Ho. As a preacher of the gospeilet me UU O nicker vs. United States. Thesult cit. say this in closing. The best way.to dhis letter was addressed to Sam. es the Fourth Amendment of the economize is to follow the biblical nel J. Chilk, secretary, United States Constitution, the Nuremberg prin. principle for prosperity. Here's a Nuclear Regulatory Commission, ciples and the Helsinki Agreement as scriptual guide. Prov. 3:S'20, 2 Cor.
Washington. A copy e ts mailed to forbidding human experiments on 9:6 7, Matt. 6:30 33 and Mal. 3:7-12.
the hes. News.) unconsenting populations, The suit Ifope these tips are helpful. Sub-was filed in the U.S. Court of Appeals scriber, thank you for listening. Edl.
In reference to the followinglisted
- for the D.C. Circuit and asks the tor, thank you for lett'ng me express document received by me Oct. 30, court to declare the Atomic Energy myself. Thank God ipt the free press.
1981, from your office, I hereby re. Act unconstitutional.
quest the Natural Resou-ces Defense Patricia Townsend Council to respond on my behalf. Mrs. Suzanne Sherbondy , Kingsport i I am a member of Natural Re, Kingsport ,
l sources Defense Council and I am be. . '
Ing represented by theit legal staffin UI*Vef IUV3 ld the matter of Nuclear Fuel Services, Inc.,Erwin,Tennes ee.
. Reduced press I noted with concern the *'brief"in Document received by sne on Oct. Passing on a tip to the consumer. the October 30 hes-News which 30,1982: I would like to share a money.say. stated that 50.5 percent of respon.
Nuclear Regulatory Commission' ing ideal. I know in this day of infla. dents at the Appalachian Fair at 10 CFR Part 2 tion we're a!! looking for ways to Gray favcred additiona! development AMENDMENT TO PROVIDE TX. strength do!!ars. .
regardless of the effectr on water and
, CEPTION FROM PROCEDURAL Here's my suggestion. I'm one of air pollution. I have not seen the J RULES FOR ADJUDICATIONS IN. those kho never thought it profitable questions used to poll these fairgoers j' VOLVING CONDUCT OF MILI. or worth the effort to clip out the but I do not feel this ts valid informa-TARY OF FOREIGN AFFAIRS many coupon discounts available to tion on which to base governmental FUNCTIONS the consurner, through various publj. decisions.
j cations, but the need to economize It undoubtedly was not made clear i
As a matter of record, I wish to has caused me to reconsider these to those polled that we can have de-cornment op the recent release of ra. savings. velopment and jobs without added diation to the environment from Nu. By doing so,'I've found 'out I've popuation; it is not necessarily a clesr Fuel Services, Inc., Erwin, been the loser. Yes, I realize I've choice between jobs and more pollut.
, Tennessee. The recent release has re. been throwing money away, passing lon. Also, the persons attending the
) .t~ived very little publicity. The date up these discounts. They can really fair do not constitute a valid sample
,' as n et. 21,198L My constitutional help to save dollars and balance the of the area population and are not
.".%ts ar, being violated by the re. household budget. I found out Icould likely to be in a thoughtful and in.
we of radiation which is poisoning save money on most all the food and quiring mood at such an event. And e entire Planet Earth. I am a victim household products I use. finally there is a sad lack of informed C reliaticn exposure by the rnedical I'd like to give an example of these understanding in our area of the con.
-Jession. As a result of that expo. coupon aavings and at the same time nection between clean air and water
- r. sre !n 1957, I had a thyroidectomy praise the Kingsport TimesNews. In and people's health. A job is no bar.
I JW7. I now have a condition one edition of the paper. Iclipped out gain if it leads to excessive sickness asa as hypothyroidism which about four dollars worth of coupons or to an earlier than normal death.
. ua be constantly controlled by for discounts on products (household Perhaps the First Tennessee.Vir.
9* ation and T4 blood tests. My and food items). So consumer,if you ginia Development District and r cor,not tolerate radiation expo. want to economize, start clipping out Judge Ian Boyd could help educate i . =. I am tonstantly being exposed those valuable coupon discounts, the public about the advant.ges and I < * ;m helpless to control this situ. Ladies by doing this, you can save disadvantages of pollution contro!
.r enough on your houseN.ld budget to rather than attempting to show that l - 4'! not accept any statement that put back money to that something more industry is needed regardless I
munt of radiation is harmless special you never could fit into your of consequences. For exa mple, pollut.
.*, lie. There is no safe level of allowance. One suggestion is this, you lon control makes jobs too!
-~8 th= US Nuclear It-ru. could use the extra rnonev tn m, w
_ _ _ _ _ < _