Text
,..
POWER AUTHORITY OF THE STATE OF NEW YORK to CoLUMeus CIRCLE NEW YORK. N. Y. too19 (2121 397 6200 GEORGET. BERRY ortnavins orrican TRUSTEES
"",,*L,7
"" sic'uv vE v"cz J
c
- =:::c"""
GEORGE L. ING ALLS JOSEPH R. SC IECER VIC E CH AIR M AN PRI DEN, & CMIEF RICHARD M. FLYN N RosERr o uiuLouzi
^
December 1, 1981
!.7,o"v'c'i 1....,
rRzCERiC x R. C'^""
- "'*l.""'"*
,, c
'" "t.",,". 'v"S..... ~,
& sahaRAL CouhSEL Director of Nuclear Reactor Regulation
'J.
S.
Nuclear Regulatory Commission
@/
D Washington, D. C.
20555
/ N.\\
/J y
Attention:
Mr. Thomas A.
Ippolito, Chief 8
Operating Reactors Branch No. 2 C "
%,^ O Q
p b[~
Division of Licensina f
~
g
Subject:
James A.
FitzPatrick Nuclear Power Plant-
{
'A jf Docket No. 50-333 s
Control of Heavy Loads-NUREG-0612 h
q 7,'
Eeferences:
- 1. Letter, D.G.
Eisenhut (NRC) t.o all Operating Reactors dated December 22, 1980
- 2. Letter, J.P.
Bayne (PASNY) to T.A.
Ippolito (NRC) dated September 18, 1981 (JPN-81-73)
- 3. Letter, J.P.
Bayne (PASNY) to T.A.
Ippolito (NRC) dated October
'.5, 1981 (JPN-81-82)
Dear Sir:
Reference 1 requested a review of heavy load-handling operations and a two-phase submittal of evaluations of their conformance to the guidelines of NUREG-0612.
In Reference 2, i
the Authority provided dates for the submittal of six and nine month reports.
The six month report was completed and submitted via Reference 3.
The nine month report is required to. respond to Sections 2.2, 2.3 and 2.4 of Reference 1.
The detailed load drop analyses required to complete the responses are not yet complete.
- However, partial responses to these Sections were included in the six month report submitted in Reference 3.
The ' attached cross-reference list itemizes the nine month responses included in the six month report and their locations in that report.
The Power Authority expects that the detailed load drop analyses will be completed by the end of January 1982 and that I
O 8112080406 811201 i L 4, PDR ADOCK 05000333 l
P PDR
f i
, the complete nine month report will be submitted by February 15, 1982.
If you have any questions, please do not hesitate to contact us.
l Very truly yours, h,/f Y d
J.
P.
Bayne Senior Vice President Nuclear Generation cc:
Mr.
J.
Linville Resident Inspector.
U.
S. Nuclear Regulatory Commission P.
O. Box 136
'Lycoming, New York 13093 Mr. Ron Barton United' Engineers & Constructors, Inc.
30 S.
17th Street Philadelphia, Pa.
19101 i
i J
s i
i.
i I
f l
i'
,--e.---,.-...,,.,
p.
e S
ATTACHMENT TO-PASNY LETTER DATED-DECEMBER 1, 1981
. u JPN-81-97~
-Sections of-Reference 1 Item number of Reference 3 requiring a response
- which includes the in the nine month report requested information 2.2.1 Item 1 2.2.2 Item 2-2.2.3 Item-3.c. and Table 3-(partial response) 2.2.4.a. and b.
Item 3.a.
(partial response) 2.2.4.c.,
d, and e.
- To be included in the com-pleted nine-month report..
2.3.1 Item 1 2.3.2 Item 2-2.3.3 Item 3.c. and Table 3 (partial response)-
. 2.3.4.a
' Item 3'a.' (parti'al~ response) 2.3.4.b. and c.
To be included-in the com-plete nine. month-report.
2.4.1 Item 1-
~
2.4.2.a Item 3.c.:.and-. Table 3 (partial response)-
2.4.2.b, c, and d To be included in'the com-plete nine month report.
s x
k
\\
b
'9 8,.
G
(
i L
N O
g
(*
~
t.
i
..h
- .e ' %
j s
9 1
) 3,f i
l s
t g
.e[
'\\
)
i 1
(
g l
'O d
s
.y-s s
s
<u l
k i N
-]
s...
. a.
s q,
,. w
- s.q'
~
[,
g "p.
Un 4
y \\ fg@%, ' 4 t
i 1
g
/
1
\\
3 g %g\\ i t.
. ~ -, -... - _ _ ' _ _.,
'd 1-
-.L
-n '
4"~
-.. _, _ _ _, _. _...., _. _. _.,.. _.,.., _ _. -... -