b NOV 3 01961 Docket Nos.: STN 50-454 and STN 50-455
-APPLICANT: Comonwealth Edison Company FACILITY:
Byron Station
SUBJECT:
SUMMARY
OF EQB MEETING A neeting vas held November 10, 1981 in Bethesda, Maryland with representatives fron Commonwealth Edison Company and its consultants to discuss environmental qualification of equipment for the Byron Station. A list of attendees is given in Enclosure 1..
The applicant nade a brief presentation regarding the radiological source tem used in the environnental qualification program. In response, the staff j'
indicated that the applicant should use a tine-dependent plate-out of radiofodine in the containment as given in NUREG.-0588 or justify the use of the assumption of an instantaneous 507, plate-out, of the airborn release. The applicant should also justify:
(1) the use of 30 days as the length of tine asstraed for radiation exposure; (2) the fraction of beta dose considered based on shielding; and (3)
- the assumption that the center of the containment is the high dose point.- Also the applicant shculd address the relative contribution from each source of radia-tion in the containment-the sump water, plate-out, airborn, etc.
The applicant brought a nue:ber of examples of EQ packages for the staff's review and coments. From this initial review, the staff conmented that the femat of the central files was good and that the review check list was thorough, covering all necessary areas. The staff also nace specific recommendations to improve the EQ packages presented. The applicant stated that the complete EQ subnittal would
. be ready be June 1992.
Original signed by:
WilliezKanefcv Kenneth L. Kider, Project Manager Licensing Branch Mo. 1 Division of Licensing
Enclosure:
As stated cc: See next page
'8112080006 811130 PDR ADOCK 05000454
^
PDR p.fp...D.Lg:L # '//.?
DL. f.i.'.B#1,f'/
DL:LB#1
..-g; o,nc.,
..,..g3.....g...
gg,. 7.....
g.
.......7............
on.>
..x....g............
y nac ronu sia tio.eo) nacu o242
. OFFIClAL RECORD COPY usapo:mi m.m
s-
~
Mr. Louis 0. DelGeorge Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690 ces:
Mr. William Kortier U. S. Nuclear Regulatory Commission Atomic Power Distribution Resident Inspectors Office Westinghouse Electric Corporation 4448 German Church Road P. O. Box 355 Byron, Illinois 61010-Pittsburgh, Pennsylvania 15230 Ms. Diane Chavez Paul M. Murphy, Esq.
602 Oak Street-Isham, Lincoln & Beale Rockford, Illinois 61104 One First National Plaza 42nd Floor Chicago, Illinois 60603 Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, Illinois 61107 Ms. Bridget Little Rorem Appleseed Coordinator 117 North Linden Street Essex, Illinois 60935 Dr. Bruce von Zellin Department of Biological Sciences Northern Illinois University DeKalb, Illinois 61107 Mr. Edward R. Crass Nuclear Safeguards and Licensing Division Sargent & Lundy Engineers 55 East Monroe Street Chicago, Illinois 60603 Nuclear Regulatory Commission Region III Office of Inspection and Enforcement 799 Roosevelt Road Glen Ellyn, Illinois 60137 Myron Cherry, Esq.
Cherry, Flynn and Kanter 1 IBM Plaza, Sui'te 4501 Chicago, Illinois 60611
~~
NOV 3 01981' e.
ENCLOSURE 1 EQB t%eting November 10, 1981.
- NRC K. Kiper P.~Shenanski N. B. Le J. Kennedy
~
F. Akstulewicz D. G. Mcdonald (Los Alarnos National Lab)
Comonwealth Edison Company J. Westermeier s
L. Bowen J. Der, why 54L J. Szupillo J. Regan W. Johnson K. Green W. Berger Power Consultants, Inc.
J. Lava 11ee
~
NE0 Consultants, Inc.
E. Tsai omer >
sunums >
acre >
Nac ronu sia 00-80) secu cao OFFICI AL RECORD._ COPY -
uso m ini-m o
NOV 3 0192i s
MEETING
SUMMARY
DISTRIBUTION G. Lear
'iD66liet File ~
W. Johnston
~
NRC PDR Local PDR S. Pawlicki TIC /NSIC/ Tera V. Benaroya
- 2. Rosztoczy LB#1 Reading W. Haass g \\im
\\5 H. Denton/E. Case D. Muller
/>\\
R. Ballard D. Eisenhut/M. 'Jambor W. Regan Q
9gN N
R. Mattson
~
B. J. Youngblood P. Check g @g g'
-6 A. Schwencer F. Congel 9
F. Miraglia
- 0. Parr E.
<De
\\(~
J. Miller F. Rosa G. Lainas W. Butler R. Vollmer W. Kreger d$' I J. P. Knight R. Houston R. Bosnak F. Schauer L. Rubenstein
- R. E. Jackson T. Speis Project Manager K. Kiper/S. Chesnut M. Srinivasan Attorriey, OELD J. Stolz M. Rushbrook S. Hanauer 0IE (3)
W. Gammill ACRS (16)
T. Murley F. Schroeder E. Adentam D. Skovholt M. Ernst R. Baer IPC Par +f cipants:
C. Berlinger K. Kiper K. Kniel P. Shemanski G. Knighton N. B. Le A. Thadani J. Kennedy D. Tondi F. Akstulewicz D. G. Mcdonald (Los Alamos National Lab)
J. Kramer D, Vassallo P. Collins
.D.
Ziemann bcc:
Applicant & Service List 9