Responds to NRC 810904 Immediate Action Ltr Re Insp of HPCI Steam Line.Corrective Actions:Daily Surveillances & Visual Exams Performed.No Further Hanger Damage Observed
ML20038B130
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 11/03/1981
From: Scott D
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20038B123 List:
References
81-860, NUDOCS 8111240755
Download: ML20038B130 (1)


Text

~

Commonwe:lth Edison

[

) Dresden Nuclear PowP St1 tion l

R.R. #1 i

,/ Morris, Illinois 60450 Nm/

Telephone 815/942-2920 November 3, 1981 DJS LTR: 81-860 Mr. James G. Keppler Regional Director Directorate of Regulatory Operations - Region III U.S. Nuc1 car Regulatory Commission 799 Roosevcit Road Glen Ellyn, Illinois 60137

SUBJECT:

Inspection of HPCI Steam Line

REFERENCE:

Immediate Action Letter of J. G. Keppler addressed to Cordell Reed of September 4, 19S1; Item 4

Dear Mr. Keppler:

In response to the above reference, we wish to inform you of the following measures taken and the resulting actions:

1.

Since September 4, 1981, daily surveillances were carried out on Units 2 and 3 HPCI lines. These surveillances were done by the Operating Department and the llPCI lines were always warm.

2.

Visual examinations were performed whenever the HPCI system was actuated or its isolation valves closed. No further hanger damage was observed.

3.

The subject of dropping the visual examinations per Item 2. was discussed at a meeting with your staff on October 23, 1981. As no new problems concerning the hangers were seen during these examinations, it was agreed that they could be terminated after written notification to Region III.

4.

During discussions with the Senior Resident Inspector, T. Tongue, we also requested that the operating surveillances be terminated.

Mr. Tongue conferred with your staff and then informed us that this surveillance could also be stopped after written notifica-tion.

By this letter, having satisfied the required criteria, we wish to formally notify that, as of the above date, both the visual examination and operating surveillances have been terminated.

Very t7uly yours,

! i$Dh]q~

8111240755 811117' l

PDR ADOCK 05000237 J. Scott G

PDR Station Superintendent Dresden Nuclear Power Station DJS:AA:mt cc:

D. Farrar T. Rausch A. Anandappa R. Ragan T. Tongue File /NRC E. Wilmere J. Brunner File / Numerical NOV e rges,