ML20038A624
| ML20038A624 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center, 07000754, Vallecitos File:GEH Hitachi icon.png |
| Issue date: | 10/30/1981 |
| From: | Cunningham G GENERAL ELECTRIC CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20038A623 | List: |
| References | |
| NUDOCS 8111160062 | |
| Download: ML20038A624 (1) | |
Text
.
k
?
' EN GIN EERING GENERAL ELECTRIC COMPANY, P.O. BOX 460 PLEASANTON. CALIFOANIA 94566 DIVISION h
A October-30, 1981 t NOVO 31981* -p ass e
.M s.
6
//
Harold R. Denton, Di rector Of fice of Nuclear Reactor Regulations
/b
/
U.S. Nuclear Regulatory Comission Washington, D.C.,
20555
REFERENCE:
- 1) License TR-1, Docket 50-70 2)
License R-33, Docket 50-73
- 3) Letter, "Emergenty Preparedness" by R. L. Tedesco, 11/6/80
- 4) Modified Order to Modify License, License SNM-960, 4/17/81
Dear Mr. Denton:
Attached is the " Radiological Emergency Plan, General Electric Company, Vallecitos Nuclear Center, October-1981."
In accordance with Alternative 3 in the Modified Order to Modify License for License SNM-960 (Ref. 4) both reac'.or and fuels facilities are addressed in the plan.
Evaluations have been performed previously that show credible accidents do not produce radiological consequences that require off-site action with the General Electric Test Reactor (GETR) in the current cold shutdown state (Response to Order to Show Cause, 11/11/77).
These analyses do show that it may be necessary to establish a modest sized emergency planning zone when the GETR is restarted.
The plan would, of course, be upgraded well in advance of reactor startup.
The plan is being simultaneously submitted to the Division of Fuel Cycle and Material Safety.
Sincerely, hb[
1 s
G.E.Cunn1nham Sr. Licensing Engineer GEC:sl 0
ff 8111160062 811106 II )
I PDR ADOCK 05000070 F
PDR W
r