Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20195B4441999-05-26026 May 1999 Proposed Tech Specs Relocating pressure-temp Curves, Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure-temp Limits Rept ML20205J7671999-03-31031 March 1999 Proposed Tech Specs Increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0001, Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR1999-01-29029 January 1999 Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR LIC-98-0141, SG Eddy Current Test Rept for 1998 Refueling Outage. with1998-10-27027 October 1998 SG Eddy Current Test Rept for 1998 Refueling Outage. with ML20151U3871998-09-0404 September 1998 Revised Bases of TS Sections 1.3(8),2.0.1(2),2.1.6,2.3,2.4, 2.13,2.15,3.1 & 3.6 ML20217B8611998-03-18018 March 1998 Proposed Tech Specs 5.2 & 5.11.2,changing Title of Shift Supervisor to Shift Manager ML20217B8241998-03-18018 March 1998 Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel ML20217P2041998-03-0303 March 1998 Proposed Tech Specs Pages,Revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20199L7291998-01-30030 January 1998 Proposed Tech Specs Deleting Section 3.E Re License Term ML20199L8951998-01-30030 January 1998 Proposed Tech Specs,Reflecting Relocation of pressure-temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept ML20202B0931998-01-30030 January 1998 Proposed Tech Specs Section 2.5 Re Steam & Feedwater Sys ML20203G4311997-12-11011 December 1997 Proposed Tech Specs,Adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20199K1391997-11-21021 November 1997 Proposed Tech Specs 5.19 Re Containment Leakage Rate Testing Program ML20217G4601997-10-0303 October 1997 Proposed Tech Specs Pages Revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20211N7591997-10-0202 October 1997 Rev 0 to Fort Calhoun Station Unit 1 Operating Instruction, OI-ES-3, Engineered Safeguard Controls Normal Mode 1,2 & 3 Alignment Check ML20211N7521997-09-21021 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-04, Annunciator Marking ML20211N7471997-09-12012 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-08, Plastic Label Usage ML20211N7661997-08-25025 August 1997 Rev 4 to Fort Calhoun Station Unit 1 Annunciator Response Procedure ARP-1, APR-1 Annunciator Response Procedure ML20211N7411997-08-24024 August 1997 Rev 0 to Fort Calhoun Operations Dept Policy & Directive OPD-5-14, Test Monitor Program ML20196J0851997-07-25025 July 1997 Proposed Tech Specs Implementing Option B of 10CFR50,App J & Allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance ML20137Y1801997-04-17017 April 1997 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20137H4941997-03-26026 March 1997 Proposed Tech Specs Incorporating Addl Restrictions on Operation of MSSVs ML20138L4361997-02-20020 February 1997 Proposed Tech Specs 5.0 Re Administrative Controls ML20134J6841997-01-20020 January 1997 Rev 5,Change a to Security Training & Qualification Program LIC-96-0183, Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents1996-11-20020 November 1996 Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents ML20129E5161996-10-24024 October 1996 Proposed Tech Specs 4.3.2,regarding Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding Proposed Additional Reference to Westinghouse Topical Report, WCAP-12610-P-A, Vantage + Fuel Assembly Rept ML20129C2621996-10-22022 October 1996 Proposed Tech Specs 5.0 Re Administrative Controls & 5.9.5 Re Core Operating Limits Rept LIC-96-0125, Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core1996-08-23023 August 1996 Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core ML20115G0041996-07-15015 July 1996 Proposed Tech Specs 4.3.2 Re Reactor Core & Control ML20112D3211996-05-31031 May 1996 Proposed Tech Specs Re LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6981996-05-20020 May 1996 Proposed Tech Specs,Clarifying Surveillance Test Requirements Found in TS 3-1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5931996-05-17017 May 1996 Proposed Tech Specs,Relocating Operability Requirements for Shock Suppressors (Snubbers) to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20129C5351996-03-0101 March 1996 Rev 0 to Incore Instrumentation Operability Requirements ML20097C3081996-02-0101 February 1996 Proposed Tech Specs,Allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool LIC-96-0008, Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition1996-01-22022 January 1996 Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition ML20108A7161995-12-19019 December 1995 Rev 7 to CH-ODCM-0001, ODCM, Incorporating TS Amend 171 for Section 3.1 Update/Reflect Changing Environ ML20094N8631995-11-16016 November 1995 Proposed Tech Specs,Adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses ML20092G0771995-09-0606 September 1995 Proposed Tech Spec 2.7,extending Allowed Outage Time from 7 Days Per Month to 7 Days W/ Addl Once Per Cycle 10 Day Allowed Outage Time ML20091P4011995-09-0101 September 1995 Rev 3 to Fort Calhoun Station ISI Program Plan Third Ten-Yr Interval 1993-2003 ML20087E0281995-08-0404 August 1995 Proposed Tech Specs Reducing Minimum Operable Containment Radiation High Signal Channels ML20086D5341995-06-27027 June 1995 Proposed Tech Specs Re Reformation & Clarification of TS Re Chemical & Vol Control Sys ML20091G3601995-06-26026 June 1995 Proposed Tech Specs Re Extension of Allowed Outage Time for an Inoperable Low Pressure SI Pump ML20086D3851995-06-26026 June 1995 Proposed Tech Specs Re Audit Frequencies for Plant QA Program ML20085M0081995-06-15015 June 1995 Rev 2 to ISI Program Plan for 1993-2003 Interval ML20084G7751995-05-31031 May 1995 Proposed Tech Specs,Requesting Amend to Provide Addl Restrictions on Operation of CCW Sys Heat Exchangers ML20083C0091995-05-0808 May 1995 Proposed Tech Specs,Incorporating Proposed Revs Per GL 93-05 to Specs 2.3,3.1,3.2,3.3 & 3.6 ML20087G9691995-04-0707 April 1995 Proposed Tech Specs Re Relocation of Axial Power Distribution Figure for License DPR-40 ML20082J0851995-04-0707 April 1995 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20108A7121995-03-15015 March 1995 Rev 6 to CH-ODCM-0001, ODCM, Incorporating New TS Amend 164 ML20080S0291995-03-0101 March 1995 Proposed Tech Specs Reflecting Administrative Revs to TS 5.5 & 5.8,per GL 93-07 & Revs Unrelated to GL 93-07 to TS 2.5, 2.8,2.11,3.2 & 3.10 1999-05-26
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20211N7591997-10-0202 October 1997 Rev 0 to Fort Calhoun Station Unit 1 Operating Instruction, OI-ES-3, Engineered Safeguard Controls Normal Mode 1,2 & 3 Alignment Check ML20211N7521997-09-21021 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-04, Annunciator Marking ML20211N7471997-09-12012 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-08, Plastic Label Usage ML20211N7661997-08-25025 August 1997 Rev 4 to Fort Calhoun Station Unit 1 Annunciator Response Procedure ARP-1, APR-1 Annunciator Response Procedure ML20211N7411997-08-24024 August 1997 Rev 0 to Fort Calhoun Operations Dept Policy & Directive OPD-5-14, Test Monitor Program ML20134J6841997-01-20020 January 1997 Rev 5,Change a to Security Training & Qualification Program ML20129C5351996-03-0101 March 1996 Rev 0 to Incore Instrumentation Operability Requirements ML20108A7161995-12-19019 December 1995 Rev 7 to CH-ODCM-0001, ODCM, Incorporating TS Amend 171 for Section 3.1 Update/Reflect Changing Environ ML20091P4011995-09-0101 September 1995 Rev 3 to Fort Calhoun Station ISI Program Plan Third Ten-Yr Interval 1993-2003 ML20085M0081995-06-15015 June 1995 Rev 2 to ISI Program Plan for 1993-2003 Interval ML20108A7121995-03-15015 March 1995 Rev 6 to CH-ODCM-0001, ODCM, Incorporating New TS Amend 164 ML20081D3031994-08-11011 August 1994 Rev 2 to SEI-27, ISI & Test Program ML20116K2341993-09-26026 September 1993 ISI Program Plan for 1993-2003 Interval ML20104A8291992-09-0303 September 1992 Rev 5 to Surveillance Test Procedure SS-ST-SI-3015, Safety Injection Tank Discharge Check Valves Test ML20099B9621992-07-29029 July 1992 Cycle 14 Low Power Physics & Power Ascension Test Program ML20056C4291992-06-0505 June 1992 Rev 1 to Surveillance Test Procedure IC-ST-SI-0008, Channel Calibr of SI Tank SI-6A Wide Range Level,Loop L-2904X ML20056C4301992-06-0505 June 1992 Rev 1 to Surveillance Test Procedure IC-ST-SI-0005, Channel Calibr of SI Tank SI-6A Nitrogen Pressure,Loop P-2901 ML20097B1921992-05-18018 May 1992 Draft Chemistry Manual Procedure CMP-6 ML20097B2021991-11-27027 November 1991 Draft Rev 1 to Radioactive Matls Control Procedure RW-200, Process Control Program ML20094N4551991-08-13013 August 1991 Rev 2 to C-E Rept 602977-MPS-5EFPR-002, Test Procedure Guideline for Out-of-Plant Testing of PORV Block Valves at Fort Calhoun Station Omaha Public Power District ML20059N5991990-10-0101 October 1990 Rev 5 to Fort Calhoun Station 1,Inservice Insp Program Plan for 1983-1993 Interval ML20042G9731990-02-21021 February 1990 Standing Order Procedure S.O.-M-10, Tool Accountability. ML20044A8041989-09-15015 September 1989 Rev 8 to Standing Order Procedure SO-G-70, Chemical Control. ML20236D0761988-07-0808 July 1988 Production Engineering Div Procedure QP-3, Calculation Preparation,Review & Approval ML20151L1841988-07-0101 July 1988 Inservice Insp Program Plan for 1983-93 Interval ML20236D0841988-06-30030 June 1988 Gse Design Procedure B-9, Technical Calculation Production Checking & Approval ML20236D0871988-05-31031 May 1988 Generating Station Engineering Administrative Procedure A-11, Calculation Completion & Control ML20196L4361988-04-30030 April 1988 Rev 4 to Administrative Procedure A-5, Procurement of Matl & Labor ML20196L4471988-02-29029 February 1988 Rev 2 to Design Procedure B-7, Evaluation of Bids ML20237C0291987-12-31031 December 1987 Rev 3 to Fort Calhoun Station,Unit 1,Inservice Insp Program Plan for 1983-1993 Interval ML20236D0911987-11-30030 November 1987 Generating Station Engineering Design Procedure B-10, Multidisciplinary Design Review ML20236H1821987-10-21021 October 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 11 to EPIP-OSC-14, Shift Supervisor/Site Director Actions & Rev 6 to EPIP-OSC-15, Control Room Communicator ML20237J9701987-08-0303 August 1987 Public Version of Revs to Emergency Plan Implementing Procedures,Including Rev 13 to EPIP-OSC-2-1, Emergency Plan Activation & Notifications & Rev 6 to EPIP-PI-1-34, Personal Respiratory Protections ML20236M2871987-07-31031 July 1987 Annual Exercise Jul 1987 ML20196L4431987-06-30030 June 1987 Rev 6 to Design Procedure B-5, Control of Matl & Equipment for Gse Engineered Mods at Fort Calhoun Station ML20215E6991987-06-0404 June 1987 Public Version of Emergency Plan Implementing Procedures, Including Rev 12 to EPIP-OSC-2-1, Emergency Plan Activation & Notifications & Rev 5 to EPIP-OSC-15-1, Control Room Communication ML20215J2091987-04-21021 April 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EPIP-OSC-14, Shift Supervisor/Site Director Actions & Rev 9 to EPIP-EOF-18, Offsite Radiological Surveys ML20215H8491987-04-16016 April 1987 Public Version of Revs to Emergency Plan Implementing Procedures,Including Rev 10 to EPIP-OSC-2, Emergency Plan Activation & Notifications & EPIP-EOF-17, Initiation of Public Warning ML20209A7511987-03-19019 March 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 1 to EPIP-RR-7, Recovery Decontamination & Rev 5 to EPIP-PI-1, Public Info (Crisis Communication Plan). W/870423 Release Memo ML20205B8881987-03-17017 March 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to EPIP-OSC-16, Emergency Team, Rev 10 to EPIP-EOF-6, Onsite/Offsite Dose Assessment & Rev 3 to EPIP-TSC-8, Emergency Core Damage ML20210D2571987-01-19019 January 1987 Public Version of Emergency Plan Implementing Procedures, Including EPIP-OSC-8-1, Medical Assistance. EPIP-RR-9-1, Reentry & Recovery Equipment..., EPIP-RR-77-1, Call List Caller & EPIP-RR-12-1, Emergency Recovery.. ML20207E7991986-12-15015 December 1986 Public Version of Emergency Plan Implementing Procedures, Including EPIP-RR-19, Emergency Recovery Organization Operations Support Manager & EPIP-RR-26, Emergency Recovery Organization Environ Survey & Analysis Supervisor ML20214U2281986-09-0808 September 1986 Public Version of Emergency Plan Implementing Procedures EPIP-OSC-14, Shift Supervisor/Site Director Actions, EPIP-OSC-15, Control Room Communicator & EPIP-OSC-16, Emergency Team ML20206H7061986-05-30030 May 1986 Public Version of Revs to Emergency Plan Implementing Procedures,Including EPIP-OSC-3-1, Notification of Unusual Event Actions & EPIP-OSC-4-1, Alert Event Actions. W/860623 Release Memo ML20154H8121986-02-17017 February 1986 Public Version of Revised Emergency Plan Implementng Procedures,Including Revised Table of Contents & Rev 4 to EPIP-EOF-7 Re Protective Action Guidelines ML20129F0341985-06-13013 June 1985 Public Version of Rev 2 to Emergency Plan Implementing Procedure EPIP-OSC-12, Accidental Actuation of Early Warning Siren Sys ML20102C4141985-03-0101 March 1985 Procedures Generation Package ML20106D4051984-08-31031 August 1984 Offsite Dose Calculation Manual ML20112C2401984-08-31031 August 1984 Revised Pages to Offsite Dose Calculation Manual,Fort Calhoun Station Unit 1 ML20087L5351984-03-19019 March 1984 Revised Pages to Inservice Insp Program Submitted 830926 1997-09-21
[Table view] |
Text
,
9-g
. $ *. 8 3I 2 I J in, 9,d .is = 2: =
i= 1. s=
p J2: I 8.3,s E.E.
1pE d=
2-4.=;
n'iS
~7
, s ,t og 3'.:
is
$5
.is ii c.a m G Fu
- a n.I3 i is.!!
I! a sa ia p.
i pfs 1 i a ; , s ., a n ,, s.
_._ J,
- g. .
!: !a d;
c 5 la
!! E ;h ] @ 3 E E $ m-
]a:
i EE " :- !'s ij. E i $2: 8 ill n 2o I!
En ji.
g 3
i
- j. 3 11 I s'
. 1 2
.la J!a .s!
ge jg*
jIg 2 '1 '
'E
[i }g o {1) }{ "
-mi.] i I "l 1 R o.p j., "- I < i I
8 -
n
..5 1 1 1
& $I ?
- d(i 1 A i
{ o"E{
n a, . a s, .
= __
p os EG 1 -
u Ivi e E
+
i kb- .,m.. .a f..kE .i S.c$
me .hi. ,. -< 6 s_.. i-
.j" 3 i 57 :
,3].j j*
.r E_ .! _ 13.11 3_7 .i
,18 53
- ,, y --
, . g .
i I
.s *- 1 1 ..
" ,1 's a a s1 37 $ .
e a a i =E -
] . _
g ._
G *E 257 18gj z gi '
^
!fji' S l$ jj[
e i..aiiE a
.y~g i s ig) s ' s, o
J g[d
{+
a
. i' ~
o 1y.
B D
y R2 T-7-81 D Omaha Public Power District NOTIFICATION SCHEDULE {.n -
Fort Calhoun Station FOR EMERGENCY AND INFORMATION M
Unit #1 0111130115 811104 Emergency Plan F.ig ure v.3.M._
PDR ADOCK 05000285
-F PDR c & ~~-
-+ _ . . _ . - >
. EMERG-V.3-28
'Off-Site Title of Title of Agency or Principal Alte:nate Sunport Grouts Telephone Official Official Location No.
.]
Nebraska State Radiological Lincoln, Nebr. (h02)
Civil Defense Defense h73-1421 officer -
(kO2) k71-3241 Ext. 313 After Normal (kO2)
Working Hours: k77-3951 Dedicated Line Iowa Office Director Des Moines, Duty Ers.
of Disaster Iowa Services (515) 281-3231 (Iowa Highway, After Duty Coz::=unications ) Ers (515) 281-3561 Dedicated Line Iowa Dept. of DEQ Duty Des Moines, (515)
- p. Environmental Officer -Iowa Quality 288-6819
-r) or (515) 281-8694 Iowa Highway Area Co==ander Atlantic, (712)
Patrol Iowa 243 h22h UNMC Regional UNMC Regional UNMC Regional Omaha, Nebr. (h02)
Radiation Health Radiation Health Radiation 559-5280 Center Center Directbr Health Center Safety Office '
(kO2)559-6356 Nuclear Physi- Emergency cian Nu=ber: 559-5299 E Metropolitan General Office C=aha, Nebr. (h02)
$ Utilities (MUD Dispatcher 554-7777 g District initiates MUD o emergency plan) j '
a Dispatcher )
3 m
g U.S. Coast Guard Duty Hours:
(1) U.S.C.G. Disaster Control Group St. Louis, Mo. (314)h25 h610
! ,[ (2) N.O. Local Ship Office 0=aha, Nebr. (kO2)221-kT12 or g (3) Marine Safety office .St. Louis, Mo.
(h02)h51-7681 (31h)h25 h657 l 'm a2 7-7,,o1
D E G-V.3-29 Off-Site Title of Title of A 6 ency or Principal Alternate Telephone Support Grcurs Official Official Location No. ,,
^
O=aha Public Control Room Fort Calhoun (h02)
Power District Station h26 hou Ext. 23, 26, 51 Ocaha Public E=ergency Fort Calhoun .(h02)
Power District Operation Station -I ~ ~ ~
Facility -
O=sha Public Alternate North O=aha (h02)
Power District E=ergency Station -. ~.
Operation (Control Room)
Facility / ,
(AEOF)
(AIDF) 0=aha Public E=ergency Duty Fort Calhoun (h02)
Power District Officer Station h26-hou Omaha Public Assistant General (h02)
Power District Manager - Public 536 h2n (@a Affairs American Nuclear (203)
Insurers 6TT-7305 National Weather Service 72nd St. Station 571-8351 -
Weather Adviscry 29h-5671 Service at 294-5672 Strategic Air 29h-5673 Co==and Headquarters O=aba Public Division Manager - (h02)
Power District Public Relations 536 h236 OR 5?6 h297 ISSUED e
JUL 0 71981
__ .m ._ . -
' Fort Calhoun Station Unit No. 1 M').
Emergency Plan Implementing Procedure EPIP-EOF-2 EMERGENCY OPERATION FACILITY NOTIFICATION AND COMMUNICATION I. PURPOSE This procedure describes the communication facilities available in
- the Emergency Operation Facility for use during an emergency and its proper use. Utilization of these communication facilities will vary depending on the classification and nature of the emergency condition.
II. PREREQUISITE A. The user of these communication facilities should be familiar with the use of standard single line and multiline key tele-phones and with the operation of radio equipment and should have been trained in their use.
III. PRECAUTIONS None.
(- [- IV. DESCRIPTION Communication facilities in the EOF consist of the following:
A. Switched Telephone Service
- 1. Blair Exchange Central Office Lines:
- a. _
! b. j c.
- 2. Local PABX Telephone L'ines:
i
- a. Extension 50
. b. Extension 52
- c. Extension 53
- d. Extension 54
- 3. OPPD Microwave Telephone Lines:
- a. Extension 371 j ij)3 - (j b. Extension 372 R0 2-20-81 FEB 2 C 1981
EPIP-RR-2-1
~
Fort Calnoun Station Unit No. 1
- CY]- Emergency Plan Implementing Procedure EPIP-RR-2 RE-ENTRY AND RECOVERY COMMUNICATION
. I. PURPOSE This communciations facilities available for Re-entry and Recovery opera-tions are identified and the procedure for proper use of these facilities is described. Utilization of.these communication facilities will vary l depending on the nature of the Re-entry and Recovery operation.
II. PREREQUISITE A. The user of the Telephone facilities should be familiar with the the operation of standard single line and multiline key telephones.
B. Radio equipment operators should be familiar with the general opera-tion of radio equipment and proper radio procedures as required by the FCC.
C. Users should have been trained in the proper use of these communica-tion facilities, o III. PRECAUTIONS
$ o-None IV. DESCRIPTION Re-entry and Recovery operations are controlled from the Emergency Operat-ing Facility (EOF). All communication facilities available in the EOF are also available for Re-entry and Recovery. These communciation facilities consist of the following:
A. Switched Telephone Service (1) Blair Exchange Central Office Lines:
i
- a. -
[
- b. -
C. L (2) Local PABX Telephone Lines:
- a. Extension 50
- b. Extension 52
- c. Extension 53 l d. Extension 54 (3) District Microwave Telephone Lines:
W