Text
+
t OPERATING DATA REPORT DOCKET NO. 50-155 DATE 10/4/78 Iinimebauch COMPLETED BY TELEPHONE 616-547-6537 x 180 OPERATING STATUS N'
- 1. Unit Name:
91 c Fvk PMnt Sentember 1978
- 2. Reporting Period:
2h0
- 3. Licensed Thermal Power (MWt).
75
- 4. Nameplate Rating (Gross MWe):
72
- 5. Design Electrical Rating (Net MWe):
67
- 6. Maximum Dependable Capscity (Grom MWe):
63
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
63
- 9. Power Level To which Restricsed.lf Any (Net MWe):
Dryout Time
- 10. Reasons For Restrictions.lf Any:
This Month Yr to-Date Cumulative 720 6551 115 osh
- 11. Hours In Reporting Period ICh.6 Sh12.3 96.565.5
- 12. Number Of Hours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown Hours 95 1 5377 7 94.494.6
- 14. Hours Generator On.Line 0
0 0
- 15. Unit Reserve Shutdown Hours 18.282 1.089.821 17,444,605
- 16. Gross Thermal Energy Generated (MWH) 5835 339,470 5,529,o30
- 17. Gross Electrical Energy Generated (MWH) 5492 320,821 5,234,435
- 18. Net Electrical Energy Generated (MWH) 13%
82%
70%
- 19. Unit Service Factor 13%
apg 70%
- 20. Unit Availability Factor
>N 19T
_78%
- 21. Unit Capacity Factor (Using MDC Net) 11T 68%
>h 22 Unit Capacity Factor (Using DER Net) 87%
11%
15"'since 1-1-74
- 23. Unit Forced Outage Rate
- 24. Shutdowne Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
Refueling - January 1979 - 8 weeks 10/10/78
- 25. If Shut Dow.s At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIA L OPERATION (4/77) 8109110197 781006 PDR ADOCK 05000155 R
b D.
r s
CORRECTED COPY
'iO-155 DOCKET NO.
Reason for correction:
UNITSHUTDOWNS AND POWER REDUCTIONS mig H ex roint UNIT NAME Outages ran back to back DATE 10/12/'Io" with short period of REPORT MONTil Santa-bar 1978 EP IOQ
- 3i x 180 COM E generation - therefore, time of each outage was adjusted to indicate actual - ime rac ; ors involved.
y.
~
.! E 3
$Yk s
E Cause & Corrective Licensee gg 8.%
t
'E Action to No.
Date g;
gg y
jgg Event u?
H
$E 5
jgg Report a
- G fu Prevent Recurrence 6
8 9/h/T8-9/9/78 F
110.8 A
1 78-035 SA VALVEX Unacceptable test results for conte Ln-ment supply venti.lation valve leak rate test. Valves' repaired l
9 9/9/78 P
51h.1 A
2 78-038 RB CRDRVE Control rod drive Ligh temperature encountered thus operator initiated 9/30/78 a manual Scram.
Control rod drive problems repaired.
Od 8
to 1_;
1 2
3 4
9 F: Forced Reason:
Method:
Exhibit G. Instructions S: Schedulet!
A Equipment Failure (Explain) 1-Manual for Preparatism of Data B-Maintenance or Test 2-Manual Scram.
Entre Sheets for Licensee C Refueling 3-Automatic Scram.
Even't Reporn (LFR) File (NUREG-D Regulatory Restriction 4-Other (Explain) 01611 E Operator Training & License Examination F Administrative 5
G-Operational Error (Explain)
Exhibit I. Same Source N/77) 1101her (Explain)
. j,*
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-155 Big Rock Point WIT DATE COMPLETED BY 616-Sh7-6537 x 180 TELEPHONE September 1978 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 59 1
17 2
18 3
59 19 52 20 4
SHUTIXWN 3
6 22
(
7 23 24 8
a 0
9 25 10 SHU'I'DCWN 26 11 27 12 28 13 29 I4 30 15 31 16 v
INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77 )