Monthly Operating Rept for Sept 1978
ML20038A047
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 10/04/1978
From: Himebauch N
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20038A046 List:
References
NUDOCS 8109110197
Download: ML20038A047 (3)


Text

+

t OPERATING DATA REPORT DOCKET NO. 50-155 DATE 10/4/78 Iinimebauch COMPLETED BY TELEPHONE 616-547-6537 x 180 OPERATING STATUS N'

1. Unit Name:

91 c Fvk PMnt Sentember 1978

2. Reporting Period:

2h0

3. Licensed Thermal Power (MWt).

75

4. Nameplate Rating (Gross MWe):

72

5. Design Electrical Rating (Net MWe):

67

6. Maximum Dependable Capscity (Grom MWe):

63

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

63

9. Power Level To which Restricsed.lf Any (Net MWe):

Dryout Time

10. Reasons For Restrictions.lf Any:

This Month Yr to-Date Cumulative 720 6551 115 osh

11. Hours In Reporting Period ICh.6 Sh12.3 96.565.5
12. Number Of Hours Reactor Was Critical 0

0 0

13. Reactor Reserve Shutdown Hours 95 1 5377 7 94.494.6
14. Hours Generator On.Line 0

0 0

15. Unit Reserve Shutdown Hours 18.282 1.089.821 17,444,605
16. Gross Thermal Energy Generated (MWH) 5835 339,470 5,529,o30
17. Gross Electrical Energy Generated (MWH) 5492 320,821 5,234,435
18. Net Electrical Energy Generated (MWH) 13%

82%

70%

19. Unit Service Factor 13%

apg 70%

20. Unit Availability Factor

>N 19T

_78%

21. Unit Capacity Factor (Using MDC Net) 11T 68%

>h 22 Unit Capacity Factor (Using DER Net) 87%

11%

15"'since 1-1-74

23. Unit Forced Outage Rate
24. Shutdowne Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

Refueling - January 1979 - 8 weeks 10/10/78

25. If Shut Dow.s At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIA L OPERATION (4/77) 8109110197 781006 PDR ADOCK 05000155 R

PDR

b D.

r s

CORRECTED COPY

'iO-155 DOCKET NO.

Reason for correction:

UNITSHUTDOWNS AND POWER REDUCTIONS mig H ex roint UNIT NAME Outages ran back to back DATE 10/12/'Io" with short period of REPORT MONTil Santa-bar 1978 EP IOQ

- 3i x 180 COM E generation - therefore, time of each outage was adjusted to indicate actual - ime rac ; ors involved.

y.

~

.! E 3

$Yk s

E Cause & Corrective Licensee gg 8.%

t

'E Action to No.

Date g;

gg y

jgg Event u?

H

$E 5

jgg Report a

  1. G fu Prevent Recurrence 6

8 9/h/T8-9/9/78 F

110.8 A

1 78-035 SA VALVEX Unacceptable test results for conte Ln-ment supply venti.lation valve leak rate test. Valves' repaired l

9 9/9/78 P

51h.1 A

2 78-038 RB CRDRVE Control rod drive Ligh temperature encountered thus operator initiated 9/30/78 a manual Scram.

Control rod drive problems repaired.

Od 8

to 1_;

1 2

3 4

9 F: Forced Reason:

Method:

Exhibit G. Instructions S: Schedulet!

A Equipment Failure (Explain) 1-Manual for Preparatism of Data B-Maintenance or Test 2-Manual Scram.

Entre Sheets for Licensee C Refueling 3-Automatic Scram.

Even't Reporn (LFR) File (NUREG-D Regulatory Restriction 4-Other (Explain) 01611 E Operator Training & License Examination F Administrative 5

G-Operational Error (Explain)

Exhibit I. Same Source N/77) 1101her (Explain)

. j,*

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-155 Big Rock Point WIT DATE COMPLETED BY 616-Sh7-6537 x 180 TELEPHONE September 1978 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 59 1

17 2

18 3

59 19 52 20 4

SHUTIXWN 3

6 22

(

7 23 24 8

a 0

9 25 10 SHU'I'DCWN 26 11 27 12 28 13 29 I4 30 15 31 16 v

INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77 )

i