Tech Spec Change Request 30,amending App B of License DPR-73 Re Radiological Releases & Estimated Dose Rept.Certificate of Svc Encl
ML20037D720
Person / Time
Site: Crane 
Issue date: 08/20/1981
From: Hovey G
METROPOLITAN EDISON CO.
To:
Shared Package
ML20037D718 List:
References
NUDOCS 8108310134
Download: ML20037D720 (5)


Text

.

1 METROPOLITAN EDISON COMPANY JERSEY CENTRAL POWER & LIGHT COMPANY AND PENNSYLVANIA ELECTRIC COMPANY THREE MILE ISLAND NUCLEAR STATION UNIT II l

Operating License No. DPR-73 Docket No. 50-320 Technical Specification Change Request No. 30 This Technical Specification Change Request is submitted in cupport of Licensee's request to change Appendix B to Operating License No. DPR-73 for Three Mile Island Nuclear Station Unit 2.

As a part of this request, proposed replacement pages for Appendix B are also included.

METROPOLITAN EDISON COMPAhY

/

J/

By [

/YU'

~ Vice President and

{

Director, TMI-2 Sworn and subscribed to me this %

  • day of m3q_@

, 1981.

JSyn.s m, W An u.,

Notary Public 0

DAkl A JE AN !!LRhi. NOTARY Pubt!C f31DDIEI0n ECRO. DAUPHIN COUNTY MY C0fMils510f! EXPlRf 5 J';NI 17.19M Membo. Penns>hania Assoaat en of hntanes 8108310134 810820 PDR ADOCK 05000320 P

PDR

x.

UNITED STATES OF AMERICA NUCLEAR REGULAIURY COMMISSION i

IN THE MATTER OF i

DOCKET NO. 50-320 LICENSE NO. DPR-73 METROPOLITAN EDISON COMPAhT This is to certify thr* a copy of Technical Specification Change Request No. 30 to Appendix I.i the Operating License for Three Mile Island Nuclear Station 's'n'.t 2, has, on the date given below, been filed with the U.S. Nuclear 4

Regulatory Commission and been served on the chief executives of Londonderry Township, Dauphin County, Pennsylvania and Dauphir. County, Pennsylvania by deposit in the United States mail, addressed as follows:

Mr. Donald Hoover, Chairman Mr. John E. Minnich, Chairman Board of Supervisors of Board of County Commissioners Londonderry Township of Dauphin County R. D. #1, Geyers Church Road Dauphin County Court House i

Middletown, Pennsylvania 17057 Harrisburg, Pennsylvania 17120 i

METROPOLITAN EDISON COMPANY l

J By

/y U r

Vice President and 4

Director, THI-2 l

l l

I l

f l

k

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 I.

Technical Specificction Change Request No. 30 The licensee request that the attached pages 3.2-3 and 5-7 be substituted for the existing pages in Aprendix B of the TMI-II Technical Specifi-cations.

II.

Reason for Change This change is requested based on the fact that analysis required for complete subuittals are not available in the thirty day (30) period.

Strontium analysis are performed of fsite and tha turn around time does allow submittal of complete infornation in the required thirty day not period. This een requires submittal of incomplete information or a second stSmittal correcting the previous submittal.

Strontium analysis can be performed onsite but the results are not certifiable, thus, the offsite analysis is required. Normally the offsite analysis requires a minimum of 5 to 6 weeks to provide results. This time can not be reduced due to a required 4 week decay period prior to analysis. There-fore, a 60 day reporting is necessary to provide accurate reporting.

Additionally, this change will make this reporting requirement consistent with other reporting requirements.

III.

Safety Evaluation Justifying Change Offsite doses are primarily controlled through the use of setpoints on effluent monitors.

Setpof ts are established so that offsite dose limits will not be exceeded. Additionally, a program is in place that monitors offsite activity. This offsite activity is evaluated for potential doses to the public.

If any unusual amount of activity is noted, dose assesments are made to expeditiously evaluate resultant doses.

If the results of these assesments indicate actions are necessary, appropriate procedures are immediately employed in order to reduce releases.

Changing the reporting period from 30 to 60 days will have no effect on the actions described above.

Because of the above and since the report is after the fact, this change has no safety implications.

IV.

Amendment Class (10CFR170)

The licensee has deter, mined that because the n:oposeu Technical Specification Change involves a Pro Forma change and does not have safety significance, the change constitutes a Class II License Amendment (per 10CFR 170.22).

A fee of $1,200.00 is applicable. Therefore, enclosed please find a check for $1,200.00.