ML20037D403

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-184/81-01 on 810422-23.No Noncompliance Noted
ML20037D403
Person / Time
Site: National Bureau of Standards Reactor
Issue date: 06/24/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rozier Carter
COMMERCE, DEPT. OF
Shared Package
ML20037D404 List:
References
NUDOCS 8107100196
Download: ML20037D403 (2)


See also: IR 05000184/1981001

Text

.

.

.

.

.

%

UNITED STATES

[

h

NUCLEAR REGULATORY COMMISSION

O

j

REGION I

Q,

631 PARK AVENUE

%

,e,e

KING OF PRUSSIA, PENNSYLVANIA 194o6

Docket No. 50-184

JUN 24 E

' /.

8fg ]d

U. S. Department of Commerce

S

National Bureau of Standards

O

ATTN:

Dr. R. S. Carter, Chief

. A L 0 9 193;

'ij

Reactor Radiation Division

_%us.minem.

-

'""

'I

Washington, D. C.

20234

Q

Gentlemen:

O

Subject:

Inspection 50-184/81-01

'

This refers to the routine safety inspection conducted by Mr. J. Roth of this

office on April 22-23, 1981 at Gaithersburg, Maryland of activities authorized

by NRC License No. TR-5 and to the discussions of our findings held by Mr.

Roth with yourself and other members at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our inspector also verified the steps you have taken to correct the items of

noncompliance brought to your attention in a letter dated January 22, 1980.

We have no further questions regarding your actions at this time.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790 of the Commission's regulations, . copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

.

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within 25 days from the date of this letter a

written application to this office to withhold such information. ' Consistent

with section 2.790(b)(1), any such application must be accompanied by an

affidavit executed by the owner of the information which identifies the document

or part sought to be withheld, and which contains a full statement of the

reasons on the basis which it is claimed that the information should be withheld

16Ob

.si,/i

8107100196 810624

PDR ADOCK 05000184

e

PDR

Y

J

.

_.

.

__

_

_

_

_ _ _

_ _ _

.

__ _

_

.o

.

o

,

.,

l

I

i

j

U. S. Department of Commerce

2

,RNM 241901

i

f

from public disclosure.

This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2.790(b)(4). The informatici

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavi .

If we do not hear from you in this regard within the

i

specified periods noted above, the report will be placed in the Public Document

Room. The telephone notification of your intent to request withholding, or

,

l

any request for an extension of the 10 day period which you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at

(215) 337-5223.

!

No reply to this letter is required; however, if you have any questions concerning

,

this inspection, we will be pleased to discuss them with you.

'

Sincerely,

j

.

j

_.

s _

El

n J. Brunner, Chief, Projects

Br nch #1, Division of Resident

and Project Inspection

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-184/81-01

d

I

l

,

-

.

s