AVERAGE DAILY UNIT POWER LEVEL.
DOCKET NO.
50-313 UNIT 1
DATE 5/15/81
~
COMPLETED BY L. S. Bramlett TELEPHONE (501)968-2'519 MONTH Aoril. 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
I 827 828 37 2
828 is 828 3
830
$9 824 4
829 20 826 5
827 828 21 6
825 22 829 7
826 827 23 8
457 828 24 9
260 829 25 to 785 26 826 11 825 825 2,
12 826 824
,g 13 825 825 29 14 823 826 30 15 828 N/A 3
16 828 INS 1 RUCTIONS On this fntmat.hst the average dail> unit pimer leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) 8105220 M
OPERATING DATA REPORT DOCKET NO. 50-313 DATE 5/15/81 COMPLETED By L.5.Bramlett (50119b6-2519 TELEPHONE OPERATING STATUS Notes Arkansas Nuclear Oise - Unit 1
- 1. Unit Name:
April 1-30, 1981
- 2. Reporting Period:
2568
- 3. Licensed Thermal Power (MWt):
902.74
- 4. Nameplate Rating (Gross MWe):
0
- 5. Design ElectricalRating(Net MWel:
883
- 6. Maximum Dependable Capacity (Gross MWe):
030
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (itesm Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To Which Restricted.If Any (Net MWel:
?t/A
- 10. Reasons For Restrictions.lf Any:
This Month Yr.-to-Date Cumulatise 719.0 2,879.0 55,794.0
- 11. Hours in Reporting Period 705.8 1,127.7 36,918.0
- 12. Number Of Hours Reactor Was Critical 0.0 149.0 5,044.0
- 13. Reactor Reserve Shutdown Hours 700.8 1,055.5 36,100.5
- 14. Hours Generatur On-Line 0.0 0.0 817.5
- 15. Unit Resene Shutdown Hours 1,771,166.0 2,478,997.0 86,650,963.0
- 16. Gross Thermal Energy Generated IMWHI 596,882.0 827,242.0 28,525,803.0
- 17. Gross Electrical Energy Generated (MWHI 570,820.0_
788,672.0 27,204,311.0
- 18. Net Electrical Energy Generated (MWHg 97.5 36.7 64.7
- 19. Unit Scnice Factor 97 6 36.7 66.2
- 20. Unit Availability Factor 95.0 32.8 58.3
- 21. Unit Capacity Factor (U>ing MDC Nett 93.4 32.2 5/.4
- 22. Unit Capacity Factor (Using DER Net) d*D d'U AD'#
- 23. Unit Forced Outage Itate
- 24. Shutdowns Scheduled Over Ne. t 6 Months tType. Date.and Duration of Eacht:
s
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Forecast Achiesed
- 26. Units in Test Status (Prior to Commercial Operatical:
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION to!77 i
REFUELING INFORMATION
- av M81 1..
Name of facility.
Arkansas Nuclear One - Unit 1 2.
Scheduled date for next refueling shutdown.
1/1/83 3.
Scheduled date for restart following refueling. 3/15/83 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If answer is yes, what, in general, will these be?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?
Yes.
Reload report and associated proposed Technical Specification changes. Also, the safety analysis of four demonstrating high burn-up assemblies will be provided.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
10/1/82 l
6.
Important licensing considerations associated with refueling, e.g.,
c new or dif ~erent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Will reload 72 fresh fuel assemblies and operate for approxiaately 16 months.
Four of which will be high burn-up test assemblies.
l l
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
a) 177 b) 244 8.
The present licensed spent fuel pool storage capacity and the size l
of any increase in licensed storage capacity that has been requested l
or is planned, in number of fuel assemblies.
present 589 increase size by 0
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
DATE:
1986 9
,_n,--e_--,,,,--m--,,-,,,--,-,,,,,,-,-----n...-,-,-.,v-,-n,--.,-re-n-a-n,n,n,--r-,,,-er-----,,-,----
n--,,l,,n.-
ra
)-
' DOCKET NO. 50-313 UNIT SilUIDOWNS AND POWER REDUCTIONS UNIT NAME ANC_.tini e T DATE 5/L5/81 N
RE/ ORT MONTil April, 1Q81 TELEPilONE ( 5011 96R-M14 c
.I E 3
d.E[r 1.itensce
- g
{L Cause & Currectisc
,~
N...
Daie
},
~j
?,
jj5 Event 7
e'?
Action to H
2 5
35g Repois :
Jiu 5O Pievent Recurrence O
A j
81-05 810408 F
18.19 A
3 N/A EB GENERA A power supply momentarily caused a loss.of power during a voltage transient while in maintenance.
Maintenance was informed of the potential problem, 5
1 r
l 4
1 4
1 2
3 4
12: l'orced Reason:
Method; 1% habit G-Instsuctieres A.li uipment FailurelExplain) 1 Manual to: Peepaiais.m of Data S. Scheduled t
li. Maintenance oi lest 2-Manual Scram.
Entry Sheets fes Lwemee C Reiucling 3 Autennatic Sesain.
1Sent Rep.us ll.I'R) l'ile iNLIRl:G-D.Itegulatory Reutictie.n 4-Continuation Ultill I Opciaior liaienng & litenw I'ununali""
5-Load Reduction I:.Ad m:,mi e.n r.e 9-Other lislubit 1 Sa.;w S.nh.c G. Opes anonal I e ror ll:.spl.no1 08/77)
Il O:hes ( Esplauil
NRC MONTHLY OPERATING REPORT OPERATING
SUMMARY
- APRIL 1981 UNIT I The unit began the month at 100% full power and continued t.3:e until 4/8/81. On 4/8/81 the reactor tripped on high RCS pressure,, Jing an attempted runback caused by a false power signal being sent to the ICS. The unit returned to 100% on 4/10/81 and continued normal opera-tion through the end of the month.
A correction was made to the cumulative gross thermal generation of
-1250.31 MWH due to an error in the November 1978 monthly calculations.
i i
e
-