Monthly Operating Rept for Apr 1981
ML20037D192
Person / Time
Site: Arkansas Nuclear 
Issue date: 05/15/1981
From: Bramlett L
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20037D191 List:
References
NUDOCS 8105220194
Download: ML20037D192 (4)


Text

.

AVERAGE DAILY UNIT POWER LEVEL.

50-368 DOCKET NO.

UNIT 2

DATE 5/15/81 L. S. Bramlett COMPLETED BY (501)968-2519 TELEPHONE MONTH April, 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

.MWe. Net)

(MWe-Net) 0

-0 1

37 0

2 is 0

3 0

i9 0

0 20 0

4 5

0 21 0

0 0

6 22 7

0 23 0

8 0

0 24 9

0 25 0

10 0

26 0

I!

0 0

2, 12 0

28 0

I 13 0

29 0

l 14 30 0

0 0

15 3

il/A 0

16 l

l INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each dayin the reporting inonth. Compute to the nearest whole rnegawatt.

I (9,/771 I

J OPERATING DATA REPORT 50-368 DOCKET NO.

DATE 5/15/81 COMPLETED BY L. S.Braml ett TELEPHONE (501)968-2519 OPERATING STATUS I

N5 Arkansas Nuclear Oise - Unit 2

1. Unit Name:

April 1-30,1981

2. Reporting Period:

2815

3. Licensed Thermal Power (MWt1:
4. Nameplate Rating (Gross MWel:

912 S. Design Electrical Rating INet MWeI:

097 l

6. Maximum Dependable Capacity (Gross MWe):

0

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report.Gise Reasons:

None None

9. Power Lesel To Which Restricted. lf Any (NgtWe):
10. Reasons For Restrictions.lf Any:

This Month Yr..to.Date Cumulatise 719.0 2,879.0 9,623.0

11. Hours in Reporting Period 0.0 1,968.0 6,996.8
12. Number Of Hours Reactor Was Critical 0.0 54.9 859.5
13. Reactor Reserve Shutdown Hours 0.0 1,952.2 6,868.2
14. Hours Generator On.Line 0.0 0.0 75.0
15. Unit Rewrve Shutdown Hours 0.0 5,094,885.0 16,939,047.0 i
16. Gross Thennal Energy GenerstaMiMH) 0.0 1,673,589.0 5,506,490.0
17. Gross Electrical Energy Generated (MWH, 0.0.

1,599,905.0 5,247,102.0 l

18. Net Electrical Energy Generated (MWHI 0.0 67.8 71.4
19. Unit Sersice Factor 0.0 67.8 72.2
20. Unit Availability Factor 0.0 64.8 63.6
21. Unit Capacity Factor (Using MDC Net) 0.0 60.9 59.8 l
22. Unit Capacity Factor (Using DER Net, 0.0 5.5 22.0
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

l l

June 7. 1981

25. If Shut Down At End Of Repor: Period. Estimated Date of Startup:

Forecast Achiesed

26. Units in Test Status IPrior to Commercial Operation):

INITIA L CRITICA LITY INITIA L ELECTRICITY t O\\tMERCI AL OPER ATION tu!77 )

1 DATE:

May 1981 REFUELING INFORMATION i

1.

Name of facility.

Arkansas Nuclear One - Unit 2 2.

Scheduled date for next refueling shutdown.

3/28/81(Shutdown) 3.

Scheduled date for restart following refueling.

6/07/81--

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If answer is yes, what, in general, will these be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

Yet Descriotion of effects of new core loading.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

Has been submitted for Cycle 2.

6.

Important licensing considerations associated with refueling, e.g,.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

As a part of a research snd development effort, two fuel assemblies I

will be loaded possessing design characteristics related to extended burnup.

l 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. a) 177 b) 60 8.

The present licensed spent fuel pool storage capacity and the size i

l of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

present 486 increase size by 0

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

i DATE:

1989

-).

' DOCKET NO.

50-368 UNIT SilUIDOWNS AND POWER REDUCTIONS UNIT NAME ANO - Unit TT DATE 5/15/81 COMPLETED itY L. S. nrnmiere REPORT MONTil April, 1981 TELEP110NE (501) 968-2519 E

E

.! E

'h j E ~r I.icensee

,E-r, h

Cause & Corecciisc N...

Date y

5E

?,

.2 5 5 livent U?

n.3 At tion la p, =!!

Repost =

<E U 5'

Prevent Recurrence W

4-5 u

6 81-06 3/28/81 S

719 C

1 N/A ZZ ZZZZZZ Refueling shutdown.

+

l 2

3 4

F: For.;ed Reasori:

M ethod.

ii.shibie G Insino ciio is S Sclieduled A F.iuirinen Failusc(lixplain) 1 Manual

- los Preparaison of Data li Maintenance of les:

2 Manual Serain.

Futry Sheces for 1.ieensee.

C Refucling

3. Auto:natie Ss sain.

livens Repinill.l RI FdeiNURI:G-D lierulators Ressaietion 4-COntinU8 tion Ul til I l' Op's.sio Training & Litense I sainination 5-Load Reduction e

5 F.Adnunisitati.e 9-Other lishibit I - Sa..v knu.x G-Open ational I.esos llispl.u. )

08/77) 11 Other (lisplaini

. l i

1 NRC MONTHLY OPERATING REPORT OPERATING

SUMMARY

- APRIL 1981 i

UNIT II 1

The unit was shut down on 3/28/81 for refueling and remained shut down through April.

i 4

1 f

I l

l f

I l

l l

l l

l F

l 1

n-ym, w.

,,wwwr-v, ~ ww w e- =e,,-wy e >v r-,-e,+n-mw,-,.me-m,m-,e,-s

-r

' s p-e+

w,,

--ve, n

,y----n,w..-

,,-wwe--,e,w m --w r v, e, m < vm, - -or